Daily inspection of the OP, WSW and GC, FGS wells checking the level day tanks, dose rate, pumps
situation, dumpers, PSVs …The description below shown global anomalies concerning the skids.
Description
EMK-101
1. Found both pumps not injecting due to injection line plugged. (Corrosion
Inhibitor). First priority
2. Found both pumps not injecting due to injection line plugged and there is leak in
the both box/ PSV (Oxy-scav). First priority
3. Found the B pump on but normally it will be turned off as there is no batch of
biocide. and I made an action to turn it off. (Biocide).
4. Found leak from the box pump B and PSV (Biocide).
5. Found the sand in the skid (need cleaning).
EMN-18
1. found an operation by the NESR team at the well
Progress up to day:
TAG
DATE LOCATION JOB DESCRIPTION PREORITY
NUMBER
02-P-SK-01-202
There is leak from the box of pumps (CI). COMPLETED
EMK-101 A/B
04/12/2021
WSW 02-P-SK-01-222
There is leak from the box of pumps (OXY). ON GOING
A/B
Concerning WR in the well EMK-101 WSW After inspection today we found the same anomalies
both pumps not injecting due to injection line plugged. (Corrosion Inhibitor).
21/11/2021 EMK-101 the well has been closed for a long time (CI). 02-P-SK-01-0202 A/B