You are on page 1of 2

Date of

Ino Area of Pouring Type of Batch Cube


Pouring Pourcard Cube Test
Concrete Report Remarks
register Report
09.12.2020ranstomerrail cum road wall & LTT
SRC
transformer NO YES
2 22.12.2020 6NOs CSE Coloum and firer wall footing SRC NO YES
3 02.01.2021 Ramp-1 raft SRC NO YES
05.01.2021 Ramp-2 raft,wall
SRC NO YES
505.01.2021 Transfomer railcome road, OPC NO NO YES
6 06.01.2021 FIRE WALL PLINTHN BEAM Batch Report changing
SRC NO YES
7 10.01.2021 Ramp 3-raft & wall
SRC NO YES
8
12.01.2021 RAMP4 raft,Cable tranch raft at section EE,FF SRC NO YES
9 13.01.2021 Cable tranch section DD RAFT CONCRETE SRC
121 Cable tranch section DD RAFT AND CS NO YES
18.01.2021
10 COLOUM SRC N NO YES
11 19.01.2021 Cable tranch WALL at section EE,FF SRC NO YES
12 22.01.2021 Cable tranch raft at section DD SRC NO YES
13 26.01.2021 Cable tranch WALLt at section DDD SRC NO YES
14 27.01.2021 CS FOOTING COLOUM SRC NO YES
15 27.01.2021 FIRE WALL 1st lift OPC NO NO NO Batch Report changing
16 02.02.2021 Sec CC Cable trench raft SRC
NO NO
17 06.02.2021 CSE Column &CT Wall SRC NO NO YES |Batch Report changing
18 09.02.2021 Firewall Beam with 2nd lift OPC No YES
12.02.2021 Sec GG CT Raft & CSE Column 1F1 1 nos Batch Report
SRC NO NO NO NO
19
changing
20 17.02.2021 Fire wall 3rdlift OPC NO Yes
21 19.02.2021 Sec-GG CT Raft &Wall SRC NO NO Yes Batch Reportchanging
22 22.02.2021 Sec-GGCT Raft SRC NO NO Yes BatchReport changing
23 02.03.2021 Firewall Beam with OPC
final lift NO Yes
24 02.03.2021 LM Structure SRC NO No NO No Batch Report changing
25 05.03.2021 1f1 CSE Footing SRC NO NO Yes Batch Report changing
26 08.03.2021 |Sec GG CT-Wall SRC NO NO Yes Batch Report changing
28 15.03.2021 Mumty Column OPC NO Yes
29 17.03.2021 Mumty Column OPC NO Yes
BALANCE CUBE TEST DOCUMENT
Date of Type of Batch Cube Cuhe Test
SI no Area of Pouring Pourcard Remarks AGENCY
Pouring Concrete Report register Report
28.04.202 1 Sec GG Cable trench Raft at Suriyapalayam SRC NO NO NO NO Batch Report changing KOUSIC
GG Cable trench Wall + CSE 3 column at
01.05.2021l Sec
01.05.2021 Suriyapalayam SRC NO NO NO NO atch Report changing KOUSIC
GG Cable trench Raft +Wall at
3
13.05.2021 Suriyapalayam
13.05.2021ec SRC NO NO NO NO KOUSIC
19.06.2021 Sec DD-EE-FF Cover slab OPC NO NO NO NO KOUSIC
19.06.2021 230 kV CSE Footing SRC NO NO NO NO KOUSIC
22.06.2021 230 kV CSE Column SRC NO NO NO NO Batch Report changing KOUSIC
29.06.2021 230 kV CSE Footing& Indorr ramp raft SRC NO NO NO NO Batch Report changingg KOUSIC
05.07.2021 Sec GG Raft paralal to Road SRC NO NO NO NO
Sec GG Raft paralal to Road+ 230 KV CSE Batch Report changing KOUSIC
07.07.2021 SRC NO NO
Column NO NO KOUSIC
10 09.07.2021 Staircase headroom slab_ OPC NO NO NO NO
11 15.07.2021 110 KV CSE Col+ Sec GG Wall KOUSIC
SRC NO NO NO NO Batch Report changing KOUSIC
12 17.07.2021 CT Sec CC Raft
SRC NO NO NO NO KOUSIC
13 21.07.2021 CT Sec GG Wall SRC NO NO NO NO
14 22.07.2021 Emergency Staircase raft
RRTulsi
SRC NO NO NO NO RR Tulsi
24.07.2021 |Lift Head room slab Site-mix NO NO NO NO
17 27.07.2021
28.07.2021
110 KV CSE Raft near TR-1
Sec BB CT Wall
SRC
SRC
NO
NO
NO
NO
NO
NO
NO
RR Tuisi
31.07.2021ec DD Lover slab+ Emergency Staircase
NO RRTuisi
18
SRC NO NO NO NO
column +110 KV CSE Columnn Batch Report changing RR Tulsi
19 02.08.2021Cable Celler grade slab SRC NO NO NO NO
20 05.08.2021 Cable Celler grade slab SRC
RRTulsi
NO NO NO NO
RRTulsi
21 07.08.2021 Sec GG Cover Slab_ NO NO NO NO KOUSIC
22 10.08.2021 Emergency Staircase Plinth Beam NO NO NO NO
23 14.08.2021 Emergency Staircase Wall 1st Lift KOUSIC
NO NO NO NO
24 16.08.2021 Sec GG Cover Slab OPC NO NO
KOUSIC
25 19.08.2021 110 KV CES raft -6 nos NO NO Batch Report changing RRTuls
SRC NO NO NO NO
26 23.08.2021 |110 KV CES Column 3 nos Batch Report changing KOUSIC
SRC NO NO NO NO Batch Report changing KOUSIC
28 26.08.2021
110 KV CES Column 3 nos+ Staircase waist
SRC NO
slab NO NO NO RR Tulsi
29 30.08.2021 12m culvert +Sec AA Raft SRC
30 31.08.2021 NO NO NO NO RRTulsi
|TR-1& Railcum road Raft +230 KV CSE raft SRC NO NO NO NO
31 07.09.2021 12m Culvert Wall SRC
RRTulsi
32 10.09.2021 NO NO NO NO RRTulsi
|230 KVCSE- Column+ Cover Slab SRC NO NO NO
33 13.09.2021 TR-1 Main body Concrete SRC
NO RRTulsi
NO NO NO0 NO
RR Tulsi