This document lists 27 concrete pours conducted between December 2020 and July 2021. It includes the date, area poured, type of concrete, whether a batch report and cube test report were generated, and any remarks. The pours included transformer foundations, ramps, cable trenches, columns, walls, and other structural elements. Batch reports were changed or not generated for some pours.
This document lists 27 concrete pours conducted between December 2020 and July 2021. It includes the date, area poured, type of concrete, whether a batch report and cube test report were generated, and any remarks. The pours included transformer foundations, ramps, cable trenches, columns, walls, and other structural elements. Batch reports were changed or not generated for some pours.
This document lists 27 concrete pours conducted between December 2020 and July 2021. It includes the date, area poured, type of concrete, whether a batch report and cube test report were generated, and any remarks. The pours included transformer foundations, ramps, cable trenches, columns, walls, and other structural elements. Batch reports were changed or not generated for some pours.
Pouring Pourcard Cube Test Concrete Report Remarks register Report 09.12.2020ranstomerrail cum road wall & LTT SRC transformer NO YES 2 22.12.2020 6NOs CSE Coloum and firer wall footing SRC NO YES 3 02.01.2021 Ramp-1 raft SRC NO YES 05.01.2021 Ramp-2 raft,wall SRC NO YES 505.01.2021 Transfomer railcome road, OPC NO NO YES 6 06.01.2021 FIRE WALL PLINTHN BEAM Batch Report changing SRC NO YES 7 10.01.2021 Ramp 3-raft & wall SRC NO YES 8 12.01.2021 RAMP4 raft,Cable tranch raft at section EE,FF SRC NO YES 9 13.01.2021 Cable tranch section DD RAFT CONCRETE SRC 121 Cable tranch section DD RAFT AND CS NO YES 18.01.2021 10 COLOUM SRC N NO YES 11 19.01.2021 Cable tranch WALL at section EE,FF SRC NO YES 12 22.01.2021 Cable tranch raft at section DD SRC NO YES 13 26.01.2021 Cable tranch WALLt at section DDD SRC NO YES 14 27.01.2021 CS FOOTING COLOUM SRC NO YES 15 27.01.2021 FIRE WALL 1st lift OPC NO NO NO Batch Report changing 16 02.02.2021 Sec CC Cable trench raft SRC NO NO 17 06.02.2021 CSE Column &CT Wall SRC NO NO YES |Batch Report changing 18 09.02.2021 Firewall Beam with 2nd lift OPC No YES 12.02.2021 Sec GG CT Raft & CSE Column 1F1 1 nos Batch Report SRC NO NO NO NO 19 changing 20 17.02.2021 Fire wall 3rdlift OPC NO Yes 21 19.02.2021 Sec-GG CT Raft &Wall SRC NO NO Yes Batch Reportchanging 22 22.02.2021 Sec-GGCT Raft SRC NO NO Yes BatchReport changing 23 02.03.2021 Firewall Beam with OPC final lift NO Yes 24 02.03.2021 LM Structure SRC NO No NO No Batch Report changing 25 05.03.2021 1f1 CSE Footing SRC NO NO Yes Batch Report changing 26 08.03.2021 |Sec GG CT-Wall SRC NO NO Yes Batch Report changing 28 15.03.2021 Mumty Column OPC NO Yes 29 17.03.2021 Mumty Column OPC NO Yes BALANCE CUBE TEST DOCUMENT Date of Type of Batch Cube Cuhe Test SI no Area of Pouring Pourcard Remarks AGENCY Pouring Concrete Report register Report 28.04.202 1 Sec GG Cable trench Raft at Suriyapalayam SRC NO NO NO NO Batch Report changing KOUSIC GG Cable trench Wall + CSE 3 column at 01.05.2021l Sec 01.05.2021 Suriyapalayam SRC NO NO NO NO atch Report changing KOUSIC GG Cable trench Raft +Wall at 3 13.05.2021 Suriyapalayam 13.05.2021ec SRC NO NO NO NO KOUSIC 19.06.2021 Sec DD-EE-FF Cover slab OPC NO NO NO NO KOUSIC 19.06.2021 230 kV CSE Footing SRC NO NO NO NO KOUSIC 22.06.2021 230 kV CSE Column SRC NO NO NO NO Batch Report changing KOUSIC 29.06.2021 230 kV CSE Footing& Indorr ramp raft SRC NO NO NO NO Batch Report changingg KOUSIC 05.07.2021 Sec GG Raft paralal to Road SRC NO NO NO NO Sec GG Raft paralal to Road+ 230 KV CSE Batch Report changing KOUSIC 07.07.2021 SRC NO NO Column NO NO KOUSIC 10 09.07.2021 Staircase headroom slab_ OPC NO NO NO NO 11 15.07.2021 110 KV CSE Col+ Sec GG Wall KOUSIC SRC NO NO NO NO Batch Report changing KOUSIC 12 17.07.2021 CT Sec CC Raft SRC NO NO NO NO KOUSIC 13 21.07.2021 CT Sec GG Wall SRC NO NO NO NO 14 22.07.2021 Emergency Staircase raft RRTulsi SRC NO NO NO NO RR Tulsi 24.07.2021 |Lift Head room slab Site-mix NO NO NO NO 17 27.07.2021 28.07.2021 110 KV CSE Raft near TR-1 Sec BB CT Wall SRC SRC NO NO NO NO NO NO NO RR Tuisi 31.07.2021ec DD Lover slab+ Emergency Staircase NO RRTuisi 18 SRC NO NO NO NO column +110 KV CSE Columnn Batch Report changing RR Tulsi 19 02.08.2021Cable Celler grade slab SRC NO NO NO NO 20 05.08.2021 Cable Celler grade slab SRC RRTulsi NO NO NO NO RRTulsi 21 07.08.2021 Sec GG Cover Slab_ NO NO NO NO KOUSIC 22 10.08.2021 Emergency Staircase Plinth Beam NO NO NO NO 23 14.08.2021 Emergency Staircase Wall 1st Lift KOUSIC NO NO NO NO 24 16.08.2021 Sec GG Cover Slab OPC NO NO KOUSIC 25 19.08.2021 110 KV CES raft -6 nos NO NO Batch Report changing RRTuls SRC NO NO NO NO 26 23.08.2021 |110 KV CES Column 3 nos Batch Report changing KOUSIC SRC NO NO NO NO Batch Report changing KOUSIC 28 26.08.2021 110 KV CES Column 3 nos+ Staircase waist SRC NO slab NO NO NO RR Tulsi 29 30.08.2021 12m culvert +Sec AA Raft SRC 30 31.08.2021 NO NO NO NO RRTulsi |TR-1& Railcum road Raft +230 KV CSE raft SRC NO NO NO NO 31 07.09.2021 12m Culvert Wall SRC RRTulsi 32 10.09.2021 NO NO NO NO RRTulsi |230 KVCSE- Column+ Cover Slab SRC NO NO NO 33 13.09.2021 TR-1 Main body Concrete SRC NO RRTulsi NO NO NO0 NO RR Tulsi