RFA/RFI No. Description Initiator Date Received Replied By Date Replied Remarks Oustanding
S135-LKH-RFI-002 Showflat Structural LKH Chin 28-Mar-20 DPE_RT 2-Apr-2020 0
S135-LKH-RFI-006 Perimeter Beam Fold Due To Pbu LKH Chin 23-Dec-20 DPE_RT 29-Dec-2020 0
S135-LKH-RFI-007 Balcony Rc Beam LKH Chin 12-Jan-21 DPE_RT 23-Jan-2021 0
S135-LKH-RFI-011 Detail Of Dwall LKH Chin 23-Feb-21 DPE_RT 23-Feb-2021 0
S135-LKH-RFI-013 Diaphragm And Buttress Wall Layout Between Bp01 And St02 Approved Drawing LKH Chin 08-Mar-21 DPE_RT 4-Mar-2021 0
S135-LKH-RFI-014 Queries On 29Th Sty LKH Chin 20-Mar-21 DPE_RT 11-Mar-2021 0
S135-LKH-RFI-015 Queries On Diaphragm Wall LKH Chin 05-Apr-21 DPE_RT 24-Mar-2021 0
S135-LKH-RFI-017 I&M For St02 Erss LKH Chin 09-Apr-21 DPE_RT 16-Apr-2021 0
S135-LKH-RFI-019 Query On Coupler To Diaphragm Wall LKH Chin 11-Jun-21 DPE_RT 18-Jun-2021 0
S135-LKH-RFI-020 Discrepancies At Basement Level Between Structural And Architectural LKH Chin 29-Jul-21 DPE_RT 30-Aug-2021 0
S135-LKH-RFI-023 Changes Of Buttress Wall & Waler Slab Levels LKH Chin 10-Sep-21 DPE_RT 14-Sep-2021 0
S135-LKH-RFI-024 Proposed Changes Of Waler Slab Layout LKH Chin 17-Sep-21 DPE_RT 13-Jan-2022 0
S135-LKH-RFI-026 Discrepancy Between Basement Working Dwg & Strut Dwg LKH Chin 21-Sep-21 DPE_RT 30-Sep-2021 0
S135-LKH-RFI-027 Built up wall encroachment into green buffer line at L3 & L4 LKH Chin 29-Sep-21 DPE_RT 14-Oct-2021 0
S135-LKH-RFI-032 Column C51 Is Not In The Center Of The Pilecap LKH Chin 13-Oct-21 DPE_RT 13-Jan-2022 0
S135-LKH-RFI-033 Design On 1St Storey Waler Slab (Section 1 - 3B) LKH Chin 10-Nov-21 DPE_RT 13-Jan-2022 0
S135-LKH-RFI-034 Construction Sequence Proposal & Connection Details LKH Chin 11-Nov-21 DPE_RT 15-Nov-2021 0
S135-LKH-RFI-036 Landscape Retaining Wall At 4B LKH Chin 12-Nov-21 DPE_RT 4-Feb-2022 0
S135-LKH-RFI-037 Casting Beam-Column Junction (Or Slab-Wall Junction) LKH Chin 12-Nov-21 DPE_RT 6-Mar-2022 0
S135-LKH-RFI-042 Capping Beam & Waler Slab Reinf Arrangement LKH Chin 26-Nov-21 DPE_RT 14-Jan-2022 0
S135-LKH-RFI-045 Reduction Of Casting Level For Buttress Wall Z3-Bt5-3, Z3-Bt5-4, Z3-Bt6-1 & Z3-Bt6-2 LKH Chin 17-Dec-21 DPE_RT 17-Dec-2021 0
S135-LKH-RFI-049 Details Of Ramp Upstand Beam & Wall LKH Chin 14-Jan-22 DPE_RT 23-Feb-2022 0
S135-LKH-RFI-052 Reinforcement Details Of Columns LKH Chin 20-Jan-22 DPE_RT 3-Mar-2023 0
S135-LKH-RFI-054 Temporary Beam And Slab Opening LKH Chin 28-Feb-22 DPE_RT 3-Mar-2023 0
S135-LKH-RFI-057 Basement Wall Water Tank Realignment LKH Chin 07-Mar-22 DPE_RT 25-Jul-2022 0
S135-LKH-RFI-059 Discrepancies On L4 & L5 Column Shape LKH Chin 10-Mar-22 DPE_TYC 2-Mar-2022 0
S135-LKH-RFI-060 Precast Element Detail & Lift Core Wall LKH Chin 11-Mar-22 DPE_RT 3-Mar-2023 0
S135-LKH-RFI-061 Revised Ffl & Sfl At Bbq Terrace LKH Chin 14-Mar-22 DPE_RT 3-Mar-2023 0
S135-LKH-RFI-063 Buttress Z3-Bt5-4 Rebar Reinforcement Proposal LKH Toh 23-Mar-22 DPE_RT 25-Mar-2022 0
S135-LKH-RFI-064 Disceprancies Of Buttress Wall Length & Waler Slab Line LKH Chin 23-Mar-22 DPE_RT 24-Mar-2022 0
S135-LKH-RFI-065 Drilling Of Starter Bars For Capping Beam LKH Chin 31-Mar-22 DPE_RT 13-Apr-2022 0
S135-LKH-RFI-066 L4 Beam Around Dwall P26-P30 LKH Chin 31-Mar-22 DPE_RT 5-Apr-2022 0
S135-LKH-RFI-067 Additional Rc Retaining Wall Along Section 5 Soldier Pile LKH Chin 01-Apr-22 DPE_RT 13-Apr-2022 0
S135-LKH-RFI-068 L3 Beam Connected To L3 Waler Slab LKH Chin 06-Apr-22 DPE_RT 3-Mar-2023 0
S135-LKH-RFI-076 Missing Reinforcement Details Of L3 Slab 500Mm Thk LKH Chin 21-Apr-22 DPE_RT 27-Apr-2022 0
S135-LKH-RFI-077 Proposed Reinf Detail For L3 Build Up Wall LKH Chin 22-Apr-22 DPE_RT 28-Apr-2022 0
S135-LKH-RFI-078 Proposed Reinf Detail For Wall Extension Above Section 3A Dwall Capping Beam LKH Chin 22-Apr-22 DPE_RT 25-May-2022 0
S135-LKH-RFI-079 Proposal Of Reinforcement For M&E Services Pipe Sleeves In P30 Capping Beam LKH Chin 30-Apr-22 DPE_RT 4-May-2022 0
S135-LKH-RFI-080 Proposed Capping Beam Extension Of P34 And Z1-Bt4-1 To Match The Adjacent L2 Waler Slab Top Level @ 111.550 LKH Chin 05-Jun-22 DPE_RT 6-Jun-2022 0
S135-LKH-RFI-081 Construction Details Of L2 Additional Waler Slab LKH Chin 05-Jun-22 DPE_RT 24-Jun-2022 0
S135-LKH-RFI-083 Construction Details Of L1 Additional Waler Slab LKH Chin 10-Jun-22 DPE_RT 12-Jul-2022 0
S135-LKH-RFI-087 Construction Sequence & Connection Details (Add. Waler Slab + King Post) LKH Chin 29-Jun-22 DPE_RT 1-Aug-2022 0
S135-LKH-RFI-091 6Tw39 Wall Discrepancy LKH Chin 07-Jul-22 DPE_TYC 23-Sep-2022 0
S135-LKH-RFI-092 Proposal For The Reinforcement Details For Pipe Sleeve Penetration LKH Toh 19-Jul-22 DPE_RT 11-Aug-2022 0
S135-LKH-RFI-094 Trimming Of L1 Waler Slab To Cater For M&E Ceiling Space LKH Chin 22-Jul-22 DPE_TYC 3-Mar-2023 Yet to reply revised RFI 0
S135-LKH-RFI-095 Replacing Bw3-1 Termination Bar With Pre-Installed Anti-Crack Bar LKH Chin 23-Jul-22 DPE_RT 25-Jul-2022 0
S135-LKH-RFI-101 Missing Reinforcement Details For Tb 1 (1500 X 1500) In St52 Working Drawing (S-Pc.01) LKH Toh 16-Aug-22 DPE_RT 16-Aug-2022 0
S135-LKH-RFI-102 Basement Bottom Add Bar Interfacing Details Between 600Mm Thk And 400Mm Thk Slab LKH Chin 16-Aug-22 DPE_RT 16-Aug-2022 0
S135-LKH-RFI-103 Raft Foundation Shear Link Reinforcement Design LKH Toh 22-Aug-22 DPE_RT 19-Oct-2022 0
S135-LKH-RFI-106 Proposed Horizontal Loop Bars For Liftpit Pileraft LKH Chin 14-Sep-22 DPE_RT 20-Sep-2022 0
S135-LKH-RFI-107 Proposed Liftpit Pileraft Bottom Bar Arrangement LKH Chin 16-Sep-22 DPE_RT 19-Sep-2022 0
S135-LKH-RFI-108 Discrepancy Of S-02A 02B Staircase LKH Bryon 19-Sep-22 DPE_RT 30-Sep-2022 0
S135-LKH-RFI-109 Revised Circular Column C38 Diameter LKH Chin 19-Sep-22 DPE_TYC 19-Sep-2022 0
S135-LKH-RFI-110 Missing Drop Panel At C34 LKH Chin 19-Sep-22 DPE_RT 29-Nov-2022 0
S135-LKH-RFI-111 Tower Crane Bp & Metal Deck Kp LKH Chin 19-Sep-22 DPE_TYC 21-Sep-2022 0
S135-LKH-RFI-112 Omission Of 1St Storey Beam LKH Chin 21-Sep-22 DPE_TYC 22-Sep-2022 0
S135-LKH-RFI-113 Position Of Wall F Of Rm-W1 Ramp Wall LKH Chin 23-Sep-22 1
S135-LKH-RFI-114 C36 & C39 Discrepancy LKH Chin 04-Oct-22 DPE_RT 1-Nov-2022 0
S135-LKH-RFI-115 Exposed Structure Beam LKH Chin 04-Oct-22 1
S135-LKH-RFI-116 Error Of Bpc1 Top Horizontal Reinforcement Details LKH Toh 07-Oct-22 DPE_RT 7-Oct-2022 0
S135-LKH-RFI-117 Btm Vertical Reinf B5-1 To Be Installed At B9-1 LKH Toh 07-Oct-22 DPE_RT 7-Oct-2022 0
S135-LKH-RFI-118 Dp5 Missing Reinf Details At L1 LKH Chin 07-Oct-22 DPE_RT 9-Dec-2022 0
S135-LKH-RFI-119 Omission Of Bend Down Portion Of Lift Pit Top Bar LKH Chin 08-Oct-22 DPE_RT 10-Oct-2022 0
S135-LKH-RFI-120 Missing 1St To 4Th Storey Ramp Reinforcement Details LKH Chin 08-Oct-22 DPE_TYC 10-Oct-2022 0
S135-LKH-RFI-121 Mass Concrete Topping Up Of Cw4 Lift Pit Based On M&E Liftpit Depth Requirement LKH Chin 08-Oct-22 DPE_RT 10-Oct-2022 0
S135-LKH-RFI-122 Overlapping Bottom Reinforcement Details Of Bpc1 LKH Toh 11-Oct-22 DPE_RT 12-Oct-2022 0
S135-LKH-RFI-123 Discrepancy Of Lift Shaft Wall Internal Dimension Between Structural And Architecturalm&E Drawing And Requirement LKH Chin 12-Oct-22 DPE_TYC 14-Oct-2022 0
S135-LKH-RFI-124 Clarification Of Case 1 & 2 Hook Details In Sd27 LKH Chin 15-Oct-22 DPE_RT 17-Nov-2022 0
S135-LKH-RFI-125 Missing Reinfocement At Basement 600Mm Thk Slab LKH Chin 17-Oct-22 DPE_RT 15-Nov-2022 0
S135-LKH-RFI-126 Overlapping Reinforcement At Pileraft LKH Chin 19-Oct-22 DPE_RT 19-Oct-2022 0
S135-LKH-RFI-127 Lapping Length (B2 & B4) & Anchorage Length (B6) LKH Chin 21-Oct-22 DPE_RT 25-Oct-2022 0
S135-LKH-RFI-128 Top Rebar Arrangement At The Gully Sumps LKH Chin 21-Oct-22 DPE_RT 23-Oct-2022 0
S135-LKH-RFI-129 Missing Reinforcement Details For T6-1 LKH Chin 22-Oct-22 DPE_RT 23-Oct-2022 0
S135-LKH-RFI-130 St52 Reinf Detail Of Ramp Wall K & D LKH Chin 22-Oct-22 1
S135-LKH-RFI-131 The Top Rebar Provision At The Overlapping Area LKH Chin 25-Oct-22 DPE_RT 23-Oct-2022 0
S135-LKH-RFI-132 Marking Of ‘Mesh’ On Sss Wall Schedule Horizontal Reinforcement LKH Chin 25-Oct-22 DPE_RT 26-Oct-2022 0
S135-LKH-RFI-133 Door Structural Opening For Cw3 LKH Toh 27-Oct-22 DPE_RT 28-Oct-2022 0
S135-LKH-RFI-134 Pilecap Grade For Bored Pile Z1-P5A-1 LKH Chin 01-Nov-22 DPE_RT 2-Nov-2022 0
S135-LKH-RFI-135 Proposed Permanent Rc Retaining Structure At Section 1 & 2A LKH Chin 02-Nov-22 DPE_RT 26-Jan-2023 0
S135-LKH-RFI-136 Missing Reinf For Staircase S-02A & S-03A LKH Chin 02-Nov-22 1
S135-LKH-RFI-137 Pilecap 1Pc-2 LKH Chin 03-Nov-22 DPE_RT 7-Nov-2022 0
S135-LKH-RFI-138 Reinforcement Details For Sump Pit Opening LKH Chin 05-Nov-22 DPE_RT 7-Nov-2022 0
S135-LKH-RFI-139 Bottom Bar At Some Overlapping Area At The Affected Area LKH Chin 17-Nov-22 DPE_RT 18-Nov-2022 0
S135-LKH-RFI-140 Reinf Details Of Lift Corewall & Door Opening LKH Toh 17-Nov-22 DPE_RT 11-Jan-2023 0
S135-LKH-RFI-141 Headroom Obstruction For Column During The Installing Of Rebar LKH Toh 25-Nov-22 DPE_RT 25-Nov-2022 0
S135-LKH-RFI-142 The Raft Foundation Top Bar T5-1 Not Anchorage Into The Lift Pit Raft Foundation LKH Toh 25-Nov-22 DPE_RT 25-Nov-2022 0
S135-LKH-RFI-143 Beam 2Bh38-1 End Support At Slab Opening Area LKH Chin 1-Dec-22 DPE_TYC 1-Dec-2022 0
S135-LKH-RFI-144 Wall Horizontal Reinforcement Arrangement LKH Chin 1-Dec-22 DPE_RT 3-Dec-2022 0
S135-LKH-RFI-145 Cw7 Downhang Lift Pit Wall & Base Slab Reinf LKH Chin 1-Dec-22 DPE_RT 11-Jan-2023 0
S135-LKH-RFI-148 Missing Slab Reinforcement Detail LKH Chin 5-Dec-22 DPE_RT 15-Dec-2022 0
S135-LKH-RFI-149 Typical Slab Fold Details LKH Chin 5-Dec-22 1
S135-LKH-RFI-150 Slab Fold Drop Line Within Drop Panel LKH Chin 6-Dec-22 DPE_RT 29-Dec-2022 0
S135-LKH-RFI-151 1St Storey Cw3 Sss Door Opening LKH Toh 6-Dec-22 DPE_RT 10-Dec-2022 0
S135-LKH-RFI-152 1St Storey Missing 250Mm Thk Slab Line LKH Toh 6-Dec-22 DPE_RT 12-Dec-2022 0
S135-LKH-RFI-153 Additional Beam Around New Void Opening LKH Chin 9-Dec-22 DPE_RT 27-Dec-2022 0
S135-LKH-RFI-154 Proposed Detials Of Gully Sump At L1 Bin Centre LKH Chin 9-Dec-22 1
S135-LKH-RFI-155 Proposed Construction Sequence Of Cw6 LKH Chin 9-Dec-22 DPE_RT 16-Jan-2023 0
S135-LKH-RFI-156 Trimmer Bars Arrangement For Wall Opening LKH Chin 9-Dec-22 1
S135-LKH-RFI-157 Perimeter Drain Along L1 Driveway LKH Chin 9-Dec-22 DPE_TYC 23-Dec-2022 0
S135-LKH-RFI-158 Details Of Basement Ejector Pit Sump LKH Chin 10-Dec-22 DPE_RT 14-Dec-2022 0
S135-LKH-RFI-160 2Nd Storey Beam LKH Chin 17-Dec-22 1
S135-LKH-RFI-161 Proposed Dp3 Drop Line On L1 LKH Toh 21-Dec-22 DPE_RT 29-Dec-2022 0
S135-LKH-RFI-162 Proposal basement wall BW3-1 construction method due to I-beam’s penetration LKH Chin 21-Dec-22 DPE_RT 27-Dec-2022 0
S135-LKH-RFI-164 Drop Off Point Canopy Slab Structural Details LKH Chin 4-Jan-23 DPE_RT 9-Feb-2023 0
S135-LKH-RFI-165 Opening Of The Wall At Staircase 02A LKH Chin 3-Jan-23 1
S135-LKH-RFI-166 2Bv22-1 And 2Bv22-2 Continuous Beam Queries LKH Chin 3-Jan-23 DPE_RT 5-Jan-2023 0
S135-LKH-RFI-167 L2 Lift Lobby Beams LKH Chin 10-Jan-23 DPE_TYC 11-Jan-2023 0
S135-LKH-RFI-168 Cw7 Lift Wall Door Opening LKH Chin 11-Jan-23 1
S135-LKH-RFI-169 Omission Of L4 Beam LKH Chin 12-Jan-23 1
S135-LKH-RFI-170 Connection Details Between Cw7 And C22 In Our Top & Down Construction Method LKH Chin 12-Jan-23 DPE_TYC 12-Jan-2023 0
S135-LKH-RFI-171 Conversion Of 3Bv19-1 And 3Bv19-2 Continuous Beams To Simply Support Beam LKH Chin 12-Jan-23 DPE_TYC 12-Jan-2023 0
S135-LKH-RFI-172 Insufficient Ceiling Height At L13 LKH Chin 13-Jan-23 1
S135-LKH-RFI-173 Realignment Of L14 Rc Beam LKH Chin 16-Jan-23 DPE_RT 16-Jan-2023 0
S135-LKH-RFI-174 Ventilation Shaft 600X700 At Ns (L1 To L6) LKH Chin 16-Jan-23 DPE_RT 16-Jan-2023 0
S135-LKH-RFI-175 Conversion Of (3Bv15-1 & 3Bv15-2) & (3Bh12-1 & 3Bh-2) Continuous Beams To 2 Simply Support Beam LKH Chin 17-Jan-23 DPE_RT 17-Jan-2023 0
S135-LKH-RFI-176 3Rd Storey 150Mm Ramp Area LKH Toh 28-Jan-23 DPE_RT 7-Feb-2023 0
S135-LKH-RFI-177 Discrepency Of Beam Size For 5Lbh41 LKH Toh 30-Jan-23 DPE_RT 9-Feb-2023 0
S135-LKH-RFI-178 Increment Of Beam Size On L4 LKH Toh 31-Jan-23 DPE_RT 15-Feb-2023 0
S135-LKH-RFI-179 Increment Of Beam Size On L4 LKH Toh 31-Jan-23 DPE_RT 9-Feb-2023 0
S135-LKH-RFI-180 3Rd Storey 200Mm Thk Slab Reinf Details LKH Toh 2-Feb-23 DPE_MBD 24-Feb-2023 0
S135-LKH-RFI-181 Corewall Hook Reinf Details LKH Toh 2-Feb-23 DPE_RT 21-Feb-2023 0
S135-LKH-RFI-182 5Lw3-3 Proposed Reinforcement Details LKH Toh 7-Feb-23 DPE_TYC 7-Feb-2023 0
S135-LKH-RFI-183 Bw3-1 Proposed Trimmer Bar Size LKH Chin 9-Feb-23 1
S135-LKH-RFI-184 Proposed Drop Panel And Beam Coupler Starter Bar At L5 LKH Chin 9-Feb-23 DPE_TYC Yet to reply revised RFI 1
S135-LKH-RFI-185 Discrepancy Of Slab Drop Line Between Archi And Structural LKH Chin 9-Feb-23 1
S135-LKH-RFI-186 Upstand Beam On L2M, L3, L4 LKH Chin 14-Feb-23 1
S135-LKH-RFI-187 Transfer Slab Top And Bottom Reinf Placement LKH Chin 19-Feb-23 DPE_TYC 20-Feb-2023 0
S135-LKH-RFI-188 Placement Of Top & Btm Reinf Of L6 Transfer Slab LKH Chin 19-Feb-23 DPE_TYC 20-Feb-2023 0
S135-LKH-RFI-189 L6 Transfer Slab Reinforcement LKH Chin 19-Feb-23 DPE_TYC 20-Feb-2023 0
S135-LKH-RFI-190 Casting Sfl Of L6 Transfer Slab W Mass Concrete Top Up LKH Chin 19-Feb-23 DPE_TYC 20-Feb-2023 0
S135-LKH-RFI-191 Cw3 Wall At Ventilation Shaft LKH Chin 19-Feb-23 DPE_TYC 20-Feb-2023 0
S135-LKH-RFI-192 Omission of beams at L2 Substation LKH Chin 20-Feb-23 1
S135-LKH-RFI-193 Window Opening of L6 Walls LKH Chin 23-Feb-23 DPE_MBD 24-Feb-2023 0
S135-LKH-RFI-194 Transfer slab rebar arrangement LKH Chin 23-Feb-23 DPE_TYC 23-Feb-2023 0
S135-LKH-RFI-195 Transfer slab Pipe Penetration trimmer bar LKH Chin 23-Feb-23 DPE_TYC 23-Feb-2023 0
S135-LKH-RFI-196 CW5 protuded wall supporting detail LKH Chin 23-Feb-23 DPE_TYC 23-Feb-2023 0
S135-LKH-RFI-197 Stair 14 L5-L6 LKH Chin 23-Feb-23 DPE_MBD 24-Feb-2023 0
S135-LKH-RFI-198 L6-L36 Balcony parapet wall thickness LKH Chin 23-Feb-23 DPE_MBD 24-Feb-2023 0
S135-LKH-RFI-199 L5 stairs-14 transfer floor queries LKH Chin 23-Feb-23 DPE_MBD 24-Feb-2023 0
S135-LKH-RFI-200 L4 Lift Lobby Slab Thickness LKH Chin 23-Feb-23 DPE_TYC 23-Feb-2023 0
S135-LKH-RFI-202 Down Hang Wall (5W2-1 & 5W3-1) reinforcement detail LKH Toh 6-Mar-23 DPE_MBD 8-Mar-23 0
S135-LKH-RFI-203 L5 beam 5LBV35 LKH Chin 8-Mar-23 DPE_TYC 8-Mar-23 0
Klimt CairnHill RFA
Project No: SG18E.0057
Project Reference No: A1499-00001-2019

Tracking Schedule As OF 24 May, 2023


RFA/RFI No. Initiator Date Received Replied By Date Replied Remarks
S135-110-031 Waterproofing Layout Plan LKH_Bryon 12-Feb-2022 DPE_RT 15-Feb-2022
0
Oustanding