Professional Documents
Culture Documents
RA No.
PTW No
Report Page # of Date:
RISK ASSESSMENT WORKSHEET:
Review Due:
JOB/WO: TASK: Inspection and adjusting dosage site: all wells and FGS’
Activity Activity Hazard Action Risk Reduction (Control) Measures
R=C x P *
Inspection and adjusting dosage
No Description C P R No.
1. Training in GB PTW system.
2. Conduct a TBT with all concerned people in muster point location.
3. Check the PID and the job description which must be ensure the right installation and the
target workplace.
4. Vehicles to be checked to ensure that all is in good condition
5. Drivers to be qualified for the type of vehicle being used.
1. Accidents 3 1 3 I
6. Stay within the speed limits, reduce speed in poor conditions
en-route
7. The team must be composed at least two people according to the SIE procedure.
to / from
8. Give the departure information and arrived to Radio Man according to the SIE procedure.
Mobilisation/Demobilisation location
9. Flame Arrestor for vehicles is mandatory.
10. Do not use the mobile phone or camera in classified area (zone 0 and 1).
11. In case of emergency call phone number 33333 or GB Radio man number 666.
1. The supervisor should be conduct the TBT and explain to employees the Symptoms of
Coronavirus (a cough, a high temperature & shortness of breath).
2. Cover your mouth and nose with a tissue or your sleeve (not your hands) when you cough
or sneeze.
3. Put used tissues and masks in the bin immediately.
4. Wash your hands with soap and water often – use hand sanitiser gel if soap and water are
not available.
COVID-19 3 3 9 III 5. Try to avoid close contact with people & Avoid shaking hands (if possible keep a
3.
distance of more than 1 m for a third person during dialogues).
6. Do not touch your eyes, nose or mouth if your hands are not clean.
7. please inform your supervisor if you feel discomfort or call the emergency number 33333
8. Avoid unnecessary crowds as much as possible.
9. Wear adequate PPE (mask, gloves ...)
C = Consequence: Slight 1: Moderate 2: Serious 3: Disastrous 4. / P = Probability: Very Unlikely 1: Unlikely 2: Likely 3: Inevitable. / RISK = C x P: 1 - 3 LOW: 4 – 9 MEDIUM: 12 – 16 HIGH