RATE ANALYSIS
REMOVAL OF FIBER SHED
Removal of existing fiber shed with minimum damage of original structure as per site requirement including carriage to the storage /
disposal area at designated place, complete in all respect and as per instruction of Engineer Incharge
Total 1,620.97
ITEM RATE
Composite Rate Per Sft. 1620.97/100 Rs. 16.21