Description of Items:

Supply and installation of G.I. Sheet Cladding , as per specification/ Drawings, complete in all respects as approved by

G.I. Sheet Cladding


Unit Of Rate=Per Sft
For Analysis Take 20 Sq Ft
Items Item Desc Unit Qty. Rate Amount

1-- Material:

Supply of G.I. Sheet Cladding

i 26 Gauge
G.I. Sheet
= 20 Sft
Add
Wastage
&
Overlappi
ng= 15%
Total Sft
= 23 Sft

23 Sft =
23 x 0.41 Kg 9.43 135 1,273
= 9.43 Kg

ii Duct
Sealant
and Job 1 89 100
Installatio
n Material

2-- Carriage

i Carriage
Charges
from local
Job 1 30 30
market to
site of
work

3-- Installation Charges

i
Cutting of
sheet to
required
sizes and
Sft 20 55 1,100
making
duct then
installed
at position
Total Amount 2,503.05

20% Contractor profit on all items 500.61

Grand Total 3,003.66

te Per Square Feet = 3,003.66 /20 = 150.18

Say Rs. 150