You are on page 1of 1

INSTITUT TEKNOLOGI BANDUNG

FAKULTAS TEKNIK PERTAMBANGAN DAN PERMINYAKAN


LABORATORIUM GEOMEKANIKA DAN PERALATAN TAMBANG
Labtek IVA, lantai 2 Jalan Ganesha No. 10 Bandung 40132,Telp: +6222 2508128 Fax +6222 2514922,
e-mail: labgeomekanika@mining.itb.ac.id
SUMMARY OF PHYSICAL PROPERTIES TEST

Customer : PT. Geo Struktur Indonusa Date of Received : March 29th 2022
Made on behalf of :- Date of Test : April 4th - 6th 2022
Address : Jl. Kapten Soemarsono No. 66, Helvetia Deli Serdang, Medan - Indonesia Date of Analysis : April 7th 2022
Project : Proyek Pembangunan Bangunan Penagrah Bendungan Rukoh Kab. Pidie (MYC) Tested By : Sudibyo, Sugito
Location : Kabupaten Pidie, Aceh : Kurnia, Nurman
Test Report : GMK-008/III/2022_PT.GSI Prepared By : Ali Zein
Standard Method : ISRM 2007 Checked By : Yudhi

Sample Depth ρn ρd ρs W S n
No Lithology 3 3 e
Code (m) (gr/cm ) (gr/cm ) (gr/cm3) % % %
1 1TR01/PP-01 21.50 - 23.50 Siltstone 2.14 1.94 2.22 10.31 73.64 27.22 0.37
2 2TR01/PP-02 26.50 - 28.50 Siltstone 2.07 1.87 2.16 10.85 70.11 28.90 0.41
3 3TR01/PP-03 31.50 - 33.50 Siltstone 2.18 1.99 2.26 9.93 72.73 27.12 0.37
4 4TR01/PP-04 36.00 - 38.00 Siltstone 2.11 1.92 2.20 10.09 69.57 27.85 0.39
5 5TR01/PP-05 41.50 - 43.50 Siltstone 2.17 1.97 2.24 9.87 72.38 26.92 0.37

rn = Natural Density S = Degree of Saturation


rd = Dry Density n = Porosity
rs = Saturated Density e = Void Ratio
w= Natural Water Content

Note :

1. The results of the test are ONLY valid for the samples tested with the codes, depths, and litologies appeared in the above table
2. The laboratory allows a maximum of 30-day limit from the date of test report submission for the client to file complaints regarding the test results

Approved by

Date : April 11th 2022

Dr.Eng. Ganda M. Simangunsong


Head of Laboratory

LGMK-FRM-7.4.6/Rev.2/28Jan2020 PP Page 1 of 1

You might also like