You are on page 1of 61

LAPORAN

INSPEKSI & PEMELIHARAAN


TANGKI BAHAN BAKAR CAIR 110.000 KL

DESA SUMBERAGUNG KECAMATAN PESANGGARAN


KABUPATEN BANYUWANGI
PROVINSI JAWA TIMUR

PT BUMI SUKSESINDO
JANUARI 2022
PT BUMI SUKSESINDO
Jln. Pancer – Sumberagung – Pesanggaran – Banyuwangi , 68488 PO BOX 227 Phone: +62-333 710368 Fax +62-333 710100
Banyuwangi, 24 Desember 2021

ANALYSIS REPORT

WALL WASH TEST SOLAR TANK-04-FT-01

Client:

PT. BUMI SUKSESINDO


Copper and Gold
Banyuwangi – East Java

Prepared by:

PT. SUCI ENERGI SOLUSI INDONESIA (SEISO INDONESIA)


Office address:
BerlianBiru 20, PondokPermataSuci, Manyar, Gresik, Indonesia
Doc. No.: 2021/12/BSI

LABORATORY REPORT Issued Date: 24/12/2021

Rev. 0 Page: 2

ACKNOWLEDGEMENT

ANALYSIS REPORT

Prepared for:

PT. BUMI SUKSESINDO


Copper and Gold
Banyuwangi– East Java

WALL WASH TEST SOLAR TANK 04-FT-01

Prepared by: Verified by:

Rahmad Andrias S. Ahmad Zainul Abidin


Doc. No.: 2021/12/BSI

LABORATORY REPORT Issued Date: 24/12/2021

Rev. 0 Page: 3

Sample from: Analysis : SEISO/001/2021


PT. Bumi Suksesindo Start date : 24/12/2021
SEISO representative: Date : 24/12/2021
Rahmad Andrias S Date Printed : 24/12/2021

WALL WASH TEST = PERMANGANATE TIME TEST ANALYSIS

Sample Marked: The sample was obtain from wall of solar tank 04-FT-01, PT.
BumiSuksesindo

Objective of Test:
Detecting the presence of hydrocarbon on the wall after cleaning that reduce
potassium permanganate less than 30 minutes.

Step of work:
1. Prepare wall wash test sample from solar tank
3 sample is prepared to perform wall wash test based on rotation degree
from manhole inside tank

Sample
Location
number
Sample 1 0°
Sample 2 90°
Sample 3 180°

2. Prepare potassium permanganate (KMnO4) solution 200 ppm


3. Dissolve 0.02 g of KMnO4 solid in distilled water in beaker glass
4. Pour the solution into volumetric flask of 100 ml and fill up with water to
the mark
5. Prepare 4measuring cylinder 50 ml and clean using distilled water
6. Fill the first cylinder with water, second cylinder with sample 1, third cylinder
with sample 2, and fourth cylinder with sample 3
7. Add 2 ml of KMnO4 solution to each cylinder, tag the first cylinder as
standard solution
Doc. No.: 2021/12/BSI

LABORATORY REPORT Issued Date: 24/12/2021

Rev. 0 Page: 4

8. Mix the solution until homogenous


9. Record initial time
10. Keep the solution and check continuously
11. Record the time when the purple color fades to yellow pale (orange)

Observation result:
The observation is carried out for 45 minutes
Sample information (form left to right):
1. Standard solution (water and KMnO4)
2. Testing solution 1 (sample 1 and KMnO4)
3. Testing solution 2 (sample 2 and KMnO4)
4. Testing solution 3 (sample 3 and KMnO4)

Standar 0 Minutes
solution
Initial condition After 15 minutes running test

After 30 minutes running test After 45 minutes running test

Conclusion:
From the above result, the color of sample was changed from purple to yellow pale
after 45 minutes. Mean that pass wall wash test PTT > 30 minutes and free hydro
carbon.
Banyuwangi, 20 January 2022

ANALYSIS REPORT

WALL WASH TEST MIA SOLAR TANK FT-02

Client:

PT. BUMI SUKSESINDO


Copper and Gold
Banyuwangi – East Java

Prepared by:

PT. SUCI ENERGI SOLUSI INDONESIA (SEISO INDONESIA)


Office address:
Berlian Biru 20, Pondok Permata Suci, Manyar, Gresik, Indonesia
Ref. No.: 2022/01/BSI

LABORATORY REPORT Issued Date: 20/1/2022

Rev. 0 Page: 2

ACKNOWLEDGEMENT

ANALYSIS REPORT

Prepared for:

PT. BUMI SUKSESINDO


Copper and Gold
Banyuwangi – East Java

WALL WASH TEST MIA SOLAR TANK FT-02

Prepared by: Verified by:

Rahmad Andrias S. Ahmad Zainul Abidin


Ref. No.: 2022/01/BSI

LABORATORY REPORT Issued Date: 20/1/2022

Rev. 0 Page: 3

Sample from: Analysis : SEISO/001/2021


PT. Bumi Suksesindo Start date : 19/1/2022
SEISO representative: Date : 19/1/2022
Rahmad Andrias S Date Printed : 19/1/2022

WALL WASH TEST = PERMANGANATE TIME TEST ANALYSIS

Sample Marked: The sample was obtain from wall of MIA solar tank FT-02,
PT. Bumi Suksesindo

Refference
API Manual of Petroleum Measurement Standard – Ch. 17.8

Objective of Test:
Detecting the presence of hydrocarbon on the wall after cleaning that reduce
potassium permanganate less than 30 minutes.

Step of work:
1. Prepare wall wash test sample from solar tank
3 sample is prepared to perform wall wash test based on rotation degree
from manhole inside tank

Sample
Location
number
Sample 1 0°
Sample 2 90°
Sample 3 180°

2. Prepare potassium permanganate (KMnO4) solution 200 ppm


3. Dissolve 0.02 g of KMnO4 solid in distilled water in beaker glass
4. Pour the solution into volumetric flask of 100 ml and fill up with water to
the mark
5. Prepare 4measuring cylinder 50 ml and clean using distilled water
6. Fill the first cylinder with water, second cylinder with sample 1, third cylinder
with sample 2, and fourth cylinder with sample 3
7. Add 2 ml of KMnO4 solution to each cylinder, tag the first cylinder as
standard solution
8. Mix the solution until homogenous
9. Record initial time
10. Keep the solution and check continuously
Ref. No.: 2022/01/BSI

LABORATORY REPORT Issued Date: 20/1/2022

Rev. 0 Page: 4

11. Record the time when the purple color fades to yellow pale (orange)

Appraisal Characteristics
Permanganate Time Test (PTT) Result
15 Minutes High Hidrocarbon Remain
30 Minutes Moderate Hidrocarbon Remain
45 Minutes Low Hidrocarbon Remain

Observation result:
The observation is carried out for 45 minutes
Sample information (from left to right):
1. Standard solution (water and KMnO4)
2. Testing solution 1 (sample 1 and KMnO4)
3. Testing solution 2 (sample 2 and KMnO4)
4. Testing solution 3 (sample 3 and KMnO4)

Standar 0 Minutes
Solution
Initial condition After 15 minutes running test

After 30 minutes running test After 45 minutes running test

Conclusion:
From the above result, the color of sample was changed from purple to yellow pale
after 45 minutes. Mean that pass wall wash test PTT > 30 minutes and free hydro
carbon.
PT BUMI SUKSESINDO
Jln. Pancer – Sumberagung – Pesanggaran – Banyuwangi , 68488 PO BOX 227 Phone: +62-333 710368 Fax +62-333 710100
BLASTING PAINTING MIA FT-01 & FT-02 PROJECT BUMI
SUKSESINDO

MIA FT-01 HOLIDAY TEST REPORT

SEISO BSI
REV. DATE DESCRIPTION
Prepared by Approved by Review & Approved
0 17-Jan-22 Issued for Review RB RF

Document Number
Document type Report
SEI/BP/REP/001
Project Name Document Status
For Approval
BLASTING PAINTING MIA FT-01 & FT-02 PROJECT BUMI
Rev. Date Lang. No. of Pages
SUKSESINDO
0 17-Jan-22 EN 10
Scanned by TapScanner
Scanned by TapScanner
Scanned by TapScanner
Scanned by TapScanner
Scanned by TapScanner
Scanned by TapScanner
Scanned by TapScanner
Scanned by TapScanner
Scanned by TapScanner
PT BUMI SUKSESINDO
Jln. Pancer – Sumberagung – Pesanggaran – Banyuwangi , 68488 PO BOX 227 Phone: +62-333 710368 Fax +62-333 710100
FUEL TANK CLEANING & INSPECTION PROJECT BUMI
SUKSESINDO

MIA FT-01 WALL THICKNESS MEASUREMENT


REPORT

SEISO BSI
REV. DATE DESCRIPTION
Prepared by Approved by Review & Approved
0 26-Des-21 Issued for Review RB NH

Document Number
Document type Report
SEI/NDT/REP/002
Project Name Document Status
For Approval
FUEL TANK CLEANING & INSPECTION PROJECT BUMI
Rev. Date Lang. No. of Pages
SUKSESINDO
0 26-Des-21 EN 3
PT BUMI SUKSESINDO
Jln. Pancer – Sumberagung – Pesanggaran – Banyuwangi , 68488 PO BOX 227 Phone: +62-333 710368 Fax +62-333 710100
FUEL TANK CLEANING & INSPECTION PROJECT BUMI
SUKSESINDO

MIA FT-01 VACUUM TEST REPORT

SEISO BSI
REV. DATE DESCRIPTION
Prepared by Approved by Review & Approved
0 26-Des-21 Issued for Review RB NH

Document Number
Document type Report
SEI/NDT/REP/003
Project Name Document Status
For Approval
FUEL TANK CLEANING & INSPECTION PROJECT BUMI
Rev. Date Lang. No. of Pages
SUKSESINDO
0 26-Des-21 EN 3
PT BUMI SUKSESINDO
Jln. Pancer – Sumberagung – Pesanggaran – Banyuwangi , 68488 PO BOX 227 Phone: +62-333 710368 Fax +62-333 710100
FUEL TANK CLEANING & INSPECTION PROJECT BUMI
SUKSESINDO

MIA FT-01 PENETRANT TEST REPORT (AFTER


REPAIR)

SEISO BSI
REV. DATE DESCRIPTION
Prepared by Approved by Review & Approved
0 26-Des-21 Issued for Review RB RF

Document Number
Document type Report
SEI/NDT/REP/006
Project Name Document Status
For Approval
FUEL TANK CLEANING & INSPECTION PROJECT BUMI
Rev. Date Lang. No. of Pages
SUKSESINDO
0 26-Des-21 EN 3
FUEL TANK CLEANING & INSPECTION PROJECT BUMI
SUKSESINDO

MIA FT-02 PENETRANT TEST REPORT

SEISO BSI
REV. DATE DESCRIPTION
Prepared by Approved by Review & Approved
0 21-Jan-22 Issued for Review RB RF

Document Number
Document type Report
SEI/NDT/REP/009
Project Name Document Status
For Approval
FUEL TANK CLEANING & INSPECTION PROJECT BUMI
Rev. Date Lang. No. of Pages
SUKSESINDO
0 21-Jan-22 EN 4
PT BUMI SUKSESINDO
Jln. Pancer – Sumberagung – Pesanggaran – Banyuwangi , 68488 PO BOX 227 Phone: +62-333 710368 Fax +62-333 710100
FUEL TANK CLEANING & INSPECTION PROJECT BUMI
SUKSESINDO

MIA FT-02 WALL THICKNESS MEASUREMENT


REPORT

SEISO BSI
REV. DATE DESCRIPTION
Prepared by Approved by Review & Approved
0 21-Jan-22 Issued for Review RB RF

Document Number
Document type Report
SEI/NDT/REP/010
Project Name Document Status
For Approval
FUEL TANK CLEANING & INSPECTION PROJECT BUMI
Rev. Date Lang. No. of Pages
SUKSESINDO
0 21-Jan-22 EN 5
PT BUMI SUKSESINDO
Jln. Pancer – Sumberagung – Pesanggaran – Banyuwangi , 68488 PO BOX 227 Phone: +62-333 710368 Fax +62-333 710100
FUEL TANK CLEANING & INSPECTION PROJECT BUMI
SUKSESINDO

MIA FT-02 VACUUM BOX TEST REPORT

SEISO BSI
REV. DATE DESCRIPTION
Prepared by Approved by Review & Approved
0 21-Jan-22 Issued for Review RB RF

Document Number
Document type Report
SEI/NDT/REP/011
Project Name Document Status
For Approval
FUEL TANK CLEANING & INSPECTION PROJECT BUMI
Rev. Date Lang. No. of Pages
SUKSESINDO
0 21-Jan-22 EN 4

You might also like