You are on page 1of 12

DESIGNING FOR GREATER EFFICIENCY

A Course to Design Bioclimatic and Resource -Efficient Architecture


FINAL DESIGN PRESENTATION- JASHIN BANSAL
FINAL DESIGN EXERCISE for GREEN OFFICE V1.2 DATED: December 20, 2021

WITH THE SUPPORT OF

1 This course material is the property


Property of theInternational
of the International Finance
Finance Corporation.
Corporation. It isreproduced
Not to be altered, not to beoraltered,
distributedreproduced or distributed without permission
without permission
PROJECT SITE- CUTTACK, INDIA

2 Property of the International Finance Corporation. Not to be altered, reproduced or distributed without permission
PROJECT SITE- CUTTACK INDIA

3 Property of the International Finance Corporation. Not to be altered, reproduced or distributed without permission
1. Conceptual Design (Site Plan)

N
Block A

Tall Trees on Southern


and Western Side

4 Property of the International Finance Corporation. Not to be altered, reproduced or distributed without permission
1. Conceptual Design (Floor Plans)

5 Property of the International Finance Corporation. Not to be altered, reproduced or distributed without permission
1. Conceptual Design (Views)

6 Property of the International Finance Corporation. Not to be altered, reproduced or distributed without permission
2. Efficiency Measures Adopted

Energy Measures Water Measures Material Measures

1. W W R o f 30%
2. E xter n a l sh a di n g d ev i ces – AASF o f
0.6
3. I n su l a ti o n o f r o o f: U v a l u e o f 0.62
4. Lo w-E co a ted gl a ss: U v a l u e o f
1. Lo w-fl o w fa u cets i n a l l
2W /m2 a n d SH G C o f 0.45
Ba th r o o ms- 2L/mi n
5. E n er gy effi ci en t cei l i n g fa n s fo r
2. Du a l fl u sh fo r wa ter cl o sets i n
o ffi ce sp a ces.
a l l Ba th r o o ms - 6L/fi r st fl u sh a n d 1. Fl o o r sl a b – co n cr ete fi l l er sl a b –150
6. VRF co o l i n g sy stem - CO P o f 3.5
3L/seco n d fl u sh . mm
7. Ai r co n di ti o n in g wi th wa ter co o l ed
3. W a ter - E ffi ci en t u r i n a l s i n a l l 2. Ro o f- I n -si tu Rei n fo r ced Co n cr ete
ch i l l er - CO P o f 6.1
o th er Ba th r o o m – 2L/fl u sh Sl a b - 150 mm
8. Ra d i a n t co o l i n g a n d h ea ti n g
4. W a ter -E ffi ci en t fa u cets fo r 3. W a l l s- Sta b i l i zed E a r th b r i cks
sy stem- CO P o f RC 7.19
Ki tch en Si n ks - 4L/mi n 4. Fl o o r i n g- Cer a mi c ti l e
9. E n er gy -sa v i n g Li gh t Bu l b s - I n ter n a l
5. Ra i n wa ter h a r v esti n g sy stem - 5. W i n d o w fr a mes - Ti mb er
sp a ces.
50% o f r o o f a r ea u sed fo r
10. E n er gy -sa v i n g Li gh t Bu l b s - E xter n a l
r a i n wa ter co l l ecti o n .
sp a ces
6. Bl a ck wa ter tr ea tmen t a n d
11. Li gh ti n g co n tr o l s fo r co r r i d o r a n d
r ecy cl i n g sy stem.
sta i r ca se
12. O ccu p a n cy sen so r s i n b a th r o o ms
13. O ccu p a n cy sen so r s i n o p en o ffi ces
14. Da y l i gh t p h o to el ectr i c sen so r s fo r
i n ter n a l sp a ces.

Other Measures Green walls, Louvres

7 Property of the International Finance Corporation. Not to be altered, reproduced or distributed without permission
3. Approach to Zero Carbon

Building Performance (from EDGE)

73% 59.5% 65.3%

8 Property of the International Finance Corporation. Not to be altered, reproduced or distributed without permission
4. Approach to Zero Carbon

Energy Performance

64.7% 8.3% 75 m2
Energy met by
Energy Savings Roof Area used for PV
Renewables
13,216.11

3558.43 Kwh/m2/yr
Kwh/m2/yr

NET energy use

4547.3 1088.87

Rs. 9,83,652.98
Additional Capital Cost
Baseline Energy Improved Energy Renewable Energy
(without renewables)

1.72 years
Payback in years

9 Property of the International Finance Corporation. Not to be altered, reproduced or distributed without permission
5. Approach to Zero Carbon

Water Performance

33.74% 3.15%
Water Savings by Water savings by
fixtures recycling/ rainwater

247.88
Liters/yr

108.7 8.44

100.26 liters/yr
NET water use
Baseline water Improved Water Rainwater and
(without recycling and recycle water savings
rainwater)

10 Property of the International Finance Corporation. Not to be altered, reproduced or distributed without permission
6. Approach to Zero Carbon

Material Performance

65.33%
Embodied Energy
savings

4507
MJ

1562

1562 MJ/m2
Final Embodied Energy
Baseline Embodied Improved Embodied
energy Energy

11 Property of the International Finance Corporation. Not to be altered, reproduced or distributed without permission
7. Business Case

What are the Key Priorities for your client?


• Low operating cost
• Comfort
• Creating a Landmark
• Less impact on the environment

How will you convince your client?

• Construction cost will be low as the technology is the common one applied and the local materials
will be used.
• Louvres, green walls and renewable glass conserve energy.
• The project is designed in a way that it acts as a Landmark and a customer inside reaches all the
marks in the complex i.e., it will generate revenue.

12 Property of the International Finance Corporation. Not to be altered, reproduced or distributed without permission

You might also like