DUCUSIN, QUENNIE ROSE D.

OCTOBER 24, 2021 1/3

Common Causes of Delays Actions to Be Taken to Cope Up What Should be Done to Avoid
in Construction Project with The Schedule of Construction Recurrence of Delay
1 Unexpected Environmental When this circumstance happens, the To avoid recurrence of this delay,
Catastrophes safety of the workers is important. The there should always be a plan B,
construction phase must be put on hold whereas unexpected disasters are
until the climate is suitable for the considered so that the construction
continuation of the construction. There project will be thoroughly discussed
is what we call Excusable Delays that to the owner and the workers about
allows the contractor an expansion of what to do and the considerations
time. The most natural example under a when unexpected catastrophes like
force major clause-events such as typhoons and earthquakes took
natural disasters like fires, floods, and place during the construction.
earthquakes. Excusable delays are Developing a disaster preparedness
beyond the control of the contractor or strategy is an essential thing to do
owner and leaves them without fault. in construction planning.
When this happens, the workers must Considering “is the job site located
immediately evacuate and temporarily near a fault line? Is this area prone
stop the construction. Construction sites to flooding? What is the worst thing
also increase the dangers that people that could happen during our
confront during natural disasters, and construction?” After identifying the
materials on the job site can become possible scenarios, the next step is
hazardous debris. Reduce the hazard by to develop a disaster preparedness
ensuring the materials and equipment checklist that can help us organize
have secure location to be stored. the overall emergency response
Securing them can save thousands of strategy. Make sure that the
damages and losses. employees are safe and have roles
in the event of disaster. It is always
better to be safe than sorry.
2 Budget Shortage When this happens in the middle of the As a civil engineer, budgeting and
construction project, if you have proper costing will be one of my
personal funds to offset the construction priorities to help save time and
shortage, loan them to the company for money throughout the project.
just long enough to obtain that payment. Make sure that the project stays
For instances like this, old-school loans within the budget by creating a
and lines of credit can be used. You can carefully constructed and computed
establish up access to cash if you have a costing and assessing the projected
relationship with a local bank or credit expenses of the project. With this, I
union, so you can get the goods and can determine how quickly the
labor you need to satisfy your orders. project will be completed and the
types of technologies and
equipment we can utilize. There
must also updates on the firm’s
financial health to avoid running
out of money in the middle of
construction. When the construction
adheres to the budget, I would be
able to keep the project on track.
3 Inefficient Material and Other workers cease working and To avoid this kind of delays, the
Equipment Management remain idle while the operator and materials and equipment
mechanics investigate the problem. The management system must commit
first step in the heavy machinery repair to ensure that the appropriate
process is troubleshooting. It can take quality and quantity of materials
the longest, especially if the persons and equipment are selected,
involved are unfamiliar with the piece of purchased and delivered on the
equipment or the steps that must be construction site in the scheduled
followed to promptly and efficiently time and reasonable cost. Before the
identify the root cause, make a repair, construction to begin, all the
and return the item to operation. Any materials and equipment should be
construction company on any project tested and observed to their
site may experience equipment efficient utilization and can function
breakdowns, but the possibilities and well throughout the project. With
consequences are decreased if the the right quality and quantity of
company has prepared itself with a solid purchased materials and equipment,
preventative maintenance program and wastage of time can be minimized
an effective trojan horse. and the construction will avoid
delay. A properly implemented
materials management can achieve
the timely flow of the construction,
and thus facilitate improved work
force, increased labor productivity
and lower project cost that may lead
to budget shortage.
4 Lack of Effective Everyone should be informed to new Any construction project's success
Communication updates, such as change of orders or relies heavily on effective
redesigns, or data, such as job progress communication. Teamwork and
or costs, whether it's from an owner, project collaboration can both
customer, in the field, or in the office. benefit from good communication.
Avoid employing nonsense, overly Misunderstandings, delays, and
complicated language, or ambiguous problems can arise as a result of
phrases. A message should be concise, poor communication. On a
straightforward, and to the point. The construction project, it's critical to
main problem is to be brief but establish a communication chain of
thorough; strive to be as specific as command. These are normally
possible while using the fewest words clearly out in the contract terms and
feasible. If you're working on numerous necessitate communication between
projects for a client at the same time, the owner and the general
keep each message focused on a single contractor. All construction
project. Make your messages relevant to communication must be founded on
the client's degree of knowledge. the contract documents, which
include drawings, specifications,
change of order forms, and
information requests and make sure
that the workers and your client are
knowledgeable about it. With this,
we can avoid lost of clients and
workers and scattering the
confidence of the company both
from public and from the team.
Being an engineer does not allow
you to belittle and degrade other
people especially your workers
using hurtful words.
5 Construction Implementation Take steps to reduce the harm as soon as To avoid construction
Failure you sense a project is about to fail. implementation failure, the
Ideally, you'll be able to predict failure construction project plan and
and have enough time to figure out what schedule must be submitted before
you can do to keep the consequences the project to start to make sure that
from destroying your project. This could it is approved and appropriately
include issuing a product recall, meet the required quality and
notifying financial backers in advance, specifications because if the
and, in extreme situations, downsizing construction project was delayed, it
to guarantee your company is lean will result in revising and redoing
enough to weather the storm. I also the whole process. As a civil
propose using one of this finest resource engineer, to avoid failure of the
scheduling software if you haven't used implementation of the construction,
an online solution for resource the project must be discussed
allocation within your firm. thoroughly and study all the details
to accurately reach the desired
schedule. I must assign my people
by establishing roles, so that the
project would be successfully
implemented on time.