Jasa Rekasaya, Pengadaan Instalasi 1 (Satu)Unit Horizontal Production Separator 2 Phasa Lica

Activity ID Activity Name Original Duration Schedule % Start Finish Total Float April 2017 May 2017 June 2017 July 2017 August 2017 September 2017 October 2017 November 2017
Complete 26 02 09 16 23 30 07 14 21 28 04 11 18 25 02 09 16 23 30 06 13 20 27 03 10 17 24 01 08 15 22 29 05 12 19
Jasa Rekasaya, Pengadaan & Instalasi 1 (Satu)Unit Horizontal Production Separator 2 Phasa Lica 196 0% 03-Apr-17 08 15-Oct-17 17 0 15-Oct-17 17, Jasa Rekasaya, Pengadaan & Instalasi 1 (Satu)Unit Horiz ontal Production Separator 2 Phasa Lica

Purchasing Order 0 0% 03-Apr-17 08 03-Apr-17 08 0 03-Apr-17 08, Purchasing Order

A1000 PO 0 100% 03-Apr-17 08 0 PO, 03-Apr -17 08


Persiapan 174 0% 03-Apr-17 08 23-Sep-17 17 22 23-Sep-17 17, Persiapan

A1010 Jadw al Pelaksanaan Pekerjaan (Schedule) 5 0% 03-Apr-17 08 07-Apr-17 17 0 Jadw al Pelaksanaan Pekerjaan (Schedule)
A1020 S - Curve 5 0% 03-Apr-17 08 07-Apr-17 17 0 S - Curve
A1030 Kick Off Meeting 1 0% 08-Apr-17 08 08-Apr-17 17 0 Kick Off Meeting
A1190 Perizinan 7 0% 09-Apr-17 08 15-Apr-17 17 183 Perizinan
A1200 Mobilisasi & Demobilisasi 5 0% 19-Sep-17 08 23-Sep-17 17 22 Mobilisasi & Demobilisasi
Enginee ring 21 0% 09-Apr-17 08 29-Apr-17 17 169 29-Apr-17 17, Engineering

A1040 Prosedur 21 0% 09-Apr-17 08 29-Apr-17 17 169 Prosedur


A1050 Data Sheet 21 0% 09-Apr-17 08 29-Apr-17 17 3 Data Sheet
A1060 Draw ing 14 0% 09-Apr-17 08 22-Apr-17 17 0 Draw ing
Pengadaan Material 181 0% 12-Apr-17 08 09-Oct-17 17 6 09-Oct-17 17, Pengadaan Material

Material 174 0% 12-Apr-17 08 02-Oct-17 17 13 02-Oct-17 17, Material


Separator 174 0% 12-Apr-17 08 02-Oct-17 17 0 02-Oct-17 17, Separator
A1070 PO 1 0% 12-Apr-17 08 12-Apr-17 17 10 PO
A1080 Fabrikasi 158 0% 23-Apr-17 08 27-Sep-17 17 0 Fabrikasi
A1090 Testing 3 0% 28-Sep-17 08 30-Sep-17 17 0 Testing
A1100 Pengiriman Ke Workshop PPS 2 0% 01-Oct-17 08 02-Oct-17 17 0 Pengiriman Ke Workshop PPS
Ball Valve 108 0% 23-Apr-17 08 08-Aug-17 17 68 08-Aug-17 17, Ball Valve
A1101 PO 1 0% 23-Apr-17 08 23-Apr-17 17 68 PO
A1102 Fabrikasi 90 0% 24-Apr-17 08 22-Jul-17 17 68 Fabrikasi
A1103 Testing 3 0% 23-Jul-17 08 25-Jul-17 17 68 Testing
A1104 Pengiriman Ke Workshop PPS 14 0% 26-Jul-17 08 08-Aug-17 17 68 Pengiriman Ke Workshop PPS
Che ck Valve 108 0% 23-Apr-17 08 08-Aug-17 17 68 08-Aug-17 17, Check Valve
A1105 PO 1 0% 23-Apr-17 08 23-Apr-17 17 68 PO
A1106 Fabrikasi 90 0% 24-Apr-17 08 22-Jul-17 17 68 Fabrikasi
A1107 Testing 3 0% 23-Jul-17 08 25-Jul-17 17 68 Testing
A1108 Pengiriman Ke Workshop PPS 14 0% 26-Jul-17 08 08-Aug-17 17 68 Pengiriman Ke Workshop PPS
SDV 138 0% 16-Apr-17 08 31-Aug-17 17 45 31-Aug-17 17, SDV
A1109 PO 1 0% 16-Apr-17 08 16-Apr-17 17 45 PO
A1110 Fabrikasi 120 0% 17-Apr-17 08 14-Aug-17 17 45 Fabrikasi
A1111 Testing 3 0% 15-Aug-17 08 17-Aug-17 17 45 Testing
A1112 Pengiriman Ke Workshop PPS 14 0% 18-Aug-17 08 31-Aug-17 17 45 Pengiriman Ke Workshop PPS
PSV 121 0% 16-Apr-17 08 14-Aug-17 17 49 14-Aug-17 17, PSV
A1113 PO 1 0% 16-Apr-17 08 16-Apr-17 17 49 PO
A1114 Fabrikasi 110 0% 17-Apr-17 08 04-Aug-17 17 49 Fabrikasi
A1115 Testing 5 0% 05-Aug-17 08 09-Aug-17 17 49 Testing
A1116 Pengiriman Ke Workshop PPS 5 0% 10-Aug-17 08 14-Aug-17 17 49 Pengiriman Ke Workshop PPS
Le vel Contr ol Valve 128 0% 30-Apr-17 08 04-Sep-17 17 41 04-Sep-17 17, Level Control Valve
A1117 PO 1 0% 30-Apr-17 08 30-Apr-17 17 41 PO
A1118 Fabrikasi 110 0% 01-May-17 08 18-Aug-17 17 41 Fabrikasi
A1119 Testing 3 0% 19-Aug-17 08 21-Aug-17 17 41 Testing
A1120 Pengiriman Ke Workshop PPS 14 0% 22-Aug-17 08 04-Sep-17 17 41 Pengiriman Ke Workshop PPS
Orifice Cham be r 118 0% 19-Apr-17 08 14-Aug-17 17 49 14-Aug-17 17, Orifice Chamber
A1121 PO 1 0% 19-Apr-17 08 19-Apr-17 17 49 PO
A1122 Fabrikasi 100 0% 20-Apr-17 08 28-Jul-17 17 49 Fabrikasi
A1123 Testing 3 0% 29-Jul-17 08 31-Jul-17 17 49 Testing
A1124 Pengiriman Ke Workshop PPS 14 0% 01-Aug-17 08 14-Aug-17 17 49 Pengiriman Ke Workshop PPS
OrificePlate 118 0% 19-Apr-17 08 14-Aug-17 17 49 14-Aug-17 17, OrificePlate
A1125 PO 1 0% 19-Apr-17 08 19-Apr-17 17 49 PO
A1126 Fabrikasi 100 0% 20-Apr-17 08 28-Jul-17 17 49 Fabrikasi
A1127 Testing 3 0% 29-Jul-17 08 31-Jul-17 17 49 Testing
A1128 Pengiriman Ke Workshop PPS 14 0% 01-Aug-17 08 14-Aug-17 17 49 Pengiriman Ke Workshop PPS
Positive Displace m ent 167 0% 16-Apr-17 08 29-Sep-17 17 3 29-Sep-17 17, Positive Displacement
A1129 PO 1 0% 16-Apr-17 08 16-Apr-17 17 3 PO
A1130 Fabrikasi 140 0% 17-Apr-17 08 03-Sep-17 17 3 Fabrikasi
A1131 Testing 5 0% 04-Sep-17 08 08-Sep-17 17 3 Testing
A1132 Pengiriman Ke Workshop PPS 21 0% 09-Sep-17 08 29-Sep-17 17 3 Pengiriman Ke Workshop PPS
Pressure Gauge 107 0% 30-Apr-17 08 14-Aug-17 17 62 14-Aug-17 17, Pressure Gauge
A1133 PO 1 0% 30-Apr-17 08 30-Apr-17 17 62 PO
A1134 Fabrikasi 90 0% 01-May-17 08 29-Jul-17 17 62 Fabrikasi
A1135 Testing 2 0% 30-Jul-17 08 31-Jul-17 17 62 Testing
A1136 Pengiriman Ke Workshop PPS 14 0% 01-Aug-17 08 14-Aug-17 17 62 Pengiriman Ke Workshop PPS
Tem perat ur e Gauge 107 0% 30-Apr-17 08 14-Aug-17 17 62 14-Aug-17 17, Temperature Gauge
A1137 PO 1 0% 30-Apr-17 08 30-Apr-17 17 62 PO
A1138 Fabrikasi 90 0% 01-May-17 08 29-Jul-17 17 62 Fabrikasi
A1139 Testing 2 0% 30-Jul-17 08 31-Jul-17 17 62 Testing
A1140 Pengiriman Ke Workshop PPS 14 0% 01-Aug-17 08 14-Aug-17 17 62 Pengiriman Ke Workshop PPS
Differential Pre ssur e Gauge 107 0% 30-Apr-17 08 14-Aug-17 17 62 14-Aug-17 17, Differential Pressure Gauge
A1141 PO 1 0% 30-Apr-17 08 30-Apr-17 17 62 PO
A1142 Fabrikasi 90 0% 01-May-17 08 29-Jul-17 17 62 Fabrikasi
A1143 Testing 2 0% 30-Jul-17 08 31-Jul-17 17 62 Testing
A1144 Pengiriman Ke Workshop PPS 14 0% 01-Aug-17 08 14-Aug-17 17 62 Pengiriman Ke Workshop PPS
Pressure Sw itch 117 0% 30-Apr-17 08 24-Aug-17 17 52 24-Aug-17 17, Pressure Sw itch
A1145 PO 1 0% 30-Apr-17 08 30-Apr-17 17 52 PO
A1146 Fabrikasi 100 0% 01-May-17 08 08-Aug-17 17 52 Fabrikasi
A1147 Testing 2 0% 09-Aug-17 08 10-Aug-17 17 52 Testing
A1148 Pengiriman Ke Workshop PPS 14 0% 11-Aug-17 08 24-Aug-17 17 52 Pengiriman Ke Workshop PPS
Le vel Switch 117 0% 30-Apr-17 08 24-Aug-17 17 52 24-Aug-17 17, Level Sw itch
A1149 PO 1 0% 30-Apr-17 08 30-Apr-17 17 52 PO
A1150 Fabrikasi 100 0% 01-May-17 08 08-Aug-17 17 52 Fabrikasi
A1151 Testing 2 0% 09-Aug-17 08 10-Aug-17 17 52 Testing
A1152 Pengiriman Ke Workshop PPS 14 0% 11-Aug-17 08 24-Aug-17 17 52 Pengiriman Ke Workshop PPS
Le vel Indicator 117 0% 30-Apr-17 08 24-Aug-17 17 52 24-Aug-17 17, Level Indicator
A1153 PO 1 0% 30-Apr-17 08 30-Apr-17 17 52 PO
A1154 Fabrikasi 100 0% 01-May-17 08 08-Aug-17 17 52 Fabrikasi
A1155 Testing 2 0% 09-Aug-17 08 10-Aug-17 17 52 Testing
A1156 Pengiriman Ke Workshop PPS 14 0% 11-Aug-17 08 24-Aug-17 17 52 Pengiriman Ke Workshop PPS
Flow Recorde r 117 0% 30-Apr-17 08 24-Aug-17 17 52 24-Aug-17 17, Flow Recorder
A1157 PO 1 0% 30-Apr-17 08 30-Apr-17 17 52 PO
A1158 Fabrikasi 100 0% 01-May-17 08 08-Aug-17 17 52 Fabrikasi
A1159 Testing 2 0% 09-Aug-17 08 10-Aug-17 17 52 Testing
A1160 Pengiriman Ke Workshop PPS 14 0% 11-Aug-17 08 24-Aug-17 17 52 Pengiriman Ke Workshop PPS
Y str aine r 118 0% 30-Apr-17 08 25-Aug-17 17 51 25-Aug-17 17, Y strainer
A1161 PO 1 0% 30-Apr-17 08 30-Apr-17 17 51 PO
A1162 Fabrikasi 100 0% 01-May-17 08 08-Aug-17 17 51 Fabrikasi
A1163 Testing 3 0% 09-Aug-17 08 11-Aug-17 17 51 Testing
A1164 Pengiriman Ke Workshop PPS 14 0% 12-Aug-17 08 25-Aug-17 17 51 Pengiriman Ke Workshop PPS
Pipa 30 0% 30-Apr-17 08 29-May-17 17 74 29-May-17 17, Pipa
A1271 PO 1 0% 30-Apr-17 08 30-Apr-17 17 74 PO
A1272 Fabrikasi 24 0% 01-May-17 08 24-May-17 17 74 Fabrikasi
A1273 Testing 3 0% 25-May-17 08 27-May-17 17 74 Testing
A1274 Pengiriman Ke Workshop PPS 2 0% 28-May-17 08 29-May-17 17 74 Pengiriman Ke Workshop PPS
Flange & Fitting 30 0% 30-Apr-17 08 29-May-17 17 74 29-May-17 17, Flange & Fitting
A1275 PO 1 0% 30-Apr-17 08 30-Apr-17 17 74 PO
A1276 Fabrikasi 24 0% 01-May-17 08 24-May-17 17 74 Fabrikasi
A1277 Testing 3 0% 25-May-17 08 27-May-17 17 74 Testing
A1278 Pengiriman Ke Workshop PPS 2 0% 28-May-17 08 29-May-17 17 74 Pengiriman Ke Workshop PPS
Pengiriman Material 5 0% 05-Oct-17 08 09-Oct-17 17 0 09-Oct-17 17, Pengiriman Material
A1170 Packing Material 2 0% 05-Oct-17 08 06-Oct-17 17 0 Packing Material
A1180 Pengiriman Material & Spool Ke Site 3 0% 07-Oct-17 08 09-Oct-17 17 0 Pengiriman Material & Spool Ke Site
Fabrikasi 54 0% 30-May-17 08 22-Jul-17 17 74 22-Jul-17 17, Fabrikasi

A1280 Cutting & Fit - Up 21 0% 30-May-17 08 19-Jun-17 17 74 Cutting & Fit - Up


A1290 Welding 21 0% 01-Jun-17 08 21-Jun-17 17 74 Welding
A1300 NDT 7 0% 22-Jun-17 08 28-Jun-17 17 74 NDT
A1310 Hydrotest 3 0% 29-Jun-17 08 01-Jul-17 17 74 Hydrotest
A1320 Sand Blasting & Painting 21 0% 02-Jul-17 08 22-Jul-17 17 74 Sand Blasting & Painting
Inspeksi & Testing 51 0% 15-Aug-17 08 04-Oct-17 17 0 04-Oct-17 17, Inspeksi & Testing

A1210 Inspeksi 2 0% 03-Oct-17 08 04-Oct-17 17 0 Inspeksi


A1220 Kalibrasi 2 0% 30-Sep-17 08 01-Oct-17 17 3 Kalibrasi
A1230 Sertifikasi 2 0% 15-Aug-17 08 16-Aug-17 17 49 Sertifikasi
Instalasi 3 0% 10-Oct-17 08 12-Oct-17 17 0 12-Oct-17 17, Instalasi

A1240 Supervisi 3 0% 10-Oct-17 08 12-Oct-17 17 0 Supervisi


A1260 Instalasi Material 3 0% 10-Oct-17 08 12-Oct-17 17 0 Instalasi Material

A1270 Instalasi Ins trument 3 0% 10-Oct-17 08 12-Oct-17 17 0 Instalasi Ins trument


Commissioning 3 0% 13-Oct-17 08 15-Oct-17 17 0 15-Oct-17 17, Commissioning

A1250 Commissioning 3 0% 13-Oct-17 08 15-Oct-17 17 0 Commissioning

Actual Level of Effort Remaining Work Milestone Page 1 of 1 TASK filter: All Activities
Actual Work Critical Remaining Work summary © Oracle Corporation