EXTErnal & Internal Plastering work in First Floor 15.01.2018 27.02.2018 15.01.2018 27.02.2018
Flooring 01.02.2018 28.02.2018 01.02.2018 28.02.2018
Doors & Windows etc. 01.02.2018 28.02.2018 01.02.2018 28.02.2018
False ceiling etc. 10.03.2018 10.04.2018 10.03.2018 10.04.2018
Electrical works 28.11.2017 15.04.2018 28.11.2017 15.04.2018
Water supply & Sewarage 28.11.2017 20.04.2018 28.11.2017 20.04.2018
Painting 01.04.2018 10.06.2018 01.04.2018 10.06.2018
40 mtr international border Issue
Construction of Cargo Terminal Building 483 Days 28.02.2017 25.06.2018 28.02.2017 25.07.2018
Design of PEB 28.02.2017 15.03.2017 Completed
Design of Foundation 10.03.2017 20.03.2017 Under Process
Vetting of Design 20.03.2017 05.04.2017 15.06.2017 30.06.2017
Excavation for foundation 10.04.2017 25.04.2017 10.07.2017 20.07.2017
RCC Frame Structure for Sub structure for including
24.04.2017 10.06.2017 25.07.2017 24.09.2017
concreting uptoplinth level
RCC Frame Structure for Super structure for
10.06.2017 15.08.2017 25.09.2017 24.11.2017
including concreting of Top slab etc.
Plinth filling 25.05.2017 25.06.2017 15.09.2017 30.09.2017
Fabrication and Supply of PEB Structure 15.05.2017 30.10.2017 10.07.2017 30.10.2017
Erection of PEB Structure 30.10.2017 31.01.2018 30.10.2017 31.01.2018
Roof Sheeting 01.12.2017 15.02.2018 01.12.2017 15.02.2018
Partition wall and wall cladding 15.12.2017 28.02.2018 15.12.2017 28.02.2018
Brick work upto First Floor 28.07.2017 27.09.2017 28.08.2017 27.10.2017
Brick work of Second Floor 28.09.2017 27.11.2017 28.10.2017 27.12.2017
Conduit work 10.07.2017 17.02.2018 10.08.2017 17.02.2018
Piping work for Water supply & Sanitary 18.08.2017 17.02.2018 18.08.2017 17.02.2018
External & Internal Plastering work in Ground Floor 15.01.2018 27.02.2018 15.01.2018 27.02.2018
EXTErnal & Internal Plastering work in First Floor 15.01.2018 27.02.2018 15.01.2018 27.02.2018
Flooring 01.02.2018 28.03.2018 01.02.2018 28.03.2018
Doors & Windows etc. 01.02.2018 28.03.2018 01.02.2018 28.03.2018
False ceiling etc. 10.03.2018 10.05.2018 10.03.2018 10.05.2018
Electrical works 28.11.2017 15.05.2018 28.12.2017 15.06.2018
Water supply & Sewarage 28.11.2017 20.04.2018 28.12.2017 20.05.2018
Painting 01.04.2018 25.06.2018 01.05.2018 25.07.2018
EXTErnal & Internal Plastering work in First Floor 15.01.2018 27.02.2018 15.01.2018 27.02.2018
Flooring 01.02.2018 28.05.2018 01.02.2018 28.05.2018
Doors & Windows etc. 01.02.2018 28.03.2018 01.02.2018 28.03.2018
False ceiling etc. 10.03.2018 10.06.2018 10.03.2018 10.06.2018
Electrical works 28.11.2017 15.05.2018 28.11.2017 15.05.2018
Water supply & Sewarage 28.11.2017 20.04.2018 28.11.2017 20.04.2018
Painting 01.05.2018 25.07.2018 01.05.2018 25.07.2018
Construction of WareHouse for Arrival 483 Days 28.02.2017 25.06.2018 28.02.2017 25.07.2018
Design of PEB 28.02.2017 15.03.2017 Completed
Design of Foundation 10.03.2017 20.03.2017 Under Process
Vetting of Design 20.03.2017 05.04.2017 15.06.2017 30.06.2017
Excavation for foundation 10.04.2017 25.04.2017 10.07.2017 20.07.2017
RCC Frame Structure for Sub structure for including
24.04.2017 10.06.2017 25.07.2017 24.09.2017
concreting uptoplinth level
RCC Frame Structure for Super structure for
10.06.2017 15.08.2017 25.09.2017 24.11.2017
including concreting of Top slab etc.
Plinth filling 25.05.2017 25.06.2017 15.09.2017 30.09.2017
Fabrication and Supply of PEB Structure 15.05.2017 30.10.2017 10.07.2017 30.10.2017
Erection of PEB Structure 30.10.2017 31.01.2018 30.10.2017 31.01.2018
Roof Sheeting 01.12.2017 15.02.2018 01.12.2017 15.02.2018
WORK PROGRAMME CHART
IMPLEMENTATION SCHEDULE 2016 2017 2018
XX XX
Development of Integrated Check Post at
Dawki (Meghalaya) along Indo- Bangladesh
Border.
L.O.A.: RITES/AP/ICP DAWKI/2016/ 10159
Dated: 30/09/2016
Date of Commencement 15.10.2016
Completion Date as per agreement 14.10.2018
Revised Date of Completion
Revised Revised
Task Name Duration Unit Start Finish October November December January February March April May June July August September October November December January February March April May June July August September October
Start Finish
EXTErnal & Internal Plastering work in First Floor 15.01.2018 27.02.2018 15.01.2018 27.02.2018
Flooring 01.02.2018 28.03.2018 01.02.2018 28.03.2018
Doors & Windows etc. 01.02.2018 28.03.2018 01.02.2018 28.03.2018
False ceiling etc. 10.03.2018 10.05.2018 10.03.2018 10.05.2018
Electrical works 28.11.2017 15.05.2018 28.12.2017 15.06.2018
Water supply & Sewarage 28.11.2017 20.04.2018 28.12.2017 20.05.2018
Painting 01.04.2018 25.06.2018 01.05.2018 25.07.2018
Pump House & UG WaterStorageTank 360 Days 18.06.2017 17.06.2018 18.06.2017 17.06.2018
Civil work 18.06.2017 17.09.2017 18.06.2017 17.09.2017
Procurement of Pumps 18.09.2017 17.12.2017 18.09.2017 17.12.2017
Installationof Pumps 18.02.2018 17.06.2018 18.02.2018 17.06.2018
Installation of Fire Fighting Systems 360 Days 18.06.2017 17.05.2018 18.06.2017 17.05.2018
Procurement of Materials including Pipes , Valves &
18.06.2017 17.09.2017 18.06.2017 17.09.2017
Pumps etc.
Installation of the Piping systems, Valves & Pumps
18.09.2017 17.05.2018 18.09.2017 17.05.2018
etc.
0501 Survey 0502 Sorvey 0503 Sorvey 0504 Vehicle 0505 Vehicle 0506 Vehicle 0308 0309 310 Hotel 0113 Staff 0601 Printing & 0608 Telphone, 0610 Postage 0611 Office 0612 Office 0619 0629 Sundry
Wages consumable Others store Hire Charges fuel Charges Repair Charges Travelling Travelling Charges (Rs.) Walfare (Rs.) stationery (Rs.) Telex/Fax and teligram rent (Rs.) main Entertainment (Rs.)
( RS) store (Rs.) (Rs.) (Rs.) (Rs.) Expences (Rs) Expences (Rs) (Rs.) charges (Rs.) (Rs.) (Rs.)
S. (Rs.)
Bill/suporting Bill No. Vr. Date Particulars Total Amount
No.
(Ashish Srivastava)
Manager (Civil)
ICP Project,
Dawki
Sr. DGM / AP
ADJUSTMENT OF ADVANCE
(INSTRUCTIONS OVERLEAF)
I submit the attached Bills / Supporting vouchers for Expenses / Payments as summarised
below, totalling Rs. 1752/- only, to be credited to the above named, against the Advance of Rs. Nil /-
taken on ……………………………. (Date / Dates) .
SUMMARY
(As per "Statement of Expenditure" attached)
( From 12.11.2016 to 26.12.2016 )
CODE NO. AMOUNT
308 Rs. 0.00
113 Rs. 500.00
601 Rs. 1029.00
608 Rs. 0.00
610 Rs. 183.00