You are on page 1of 33

1 A.HASANI A.TAEFI 12.03.

18 DUE TO ANACO COMMENTS


0 A.HASANI A.TAEFI 03.02.18 ORIGINAL ISSUE
MOD. VERIFIED EDIT DATE MODIFICATION OF DRAWING
CLIENT: CONSULTANT:
TITLE:
A.R.W.A ANACO
ARDABIL REGIONAL WATER AUTHORITY OMRANI 4 ZONE
CLIENT REF.: CONSULTANT REF.: 132/20KV SUBSTATIONS
CONTRACT NO. : SCALE: OF KHODAFARIN REGION
DESIGNED: BY: A.TAEFI AT: 03.02.18
DRAWN: BY: A.TAEFI AT: 03.02.18
NO.2 Danesh Alley,Fath Squre,South of MEHR ABAD airport,Tehran-Iran 1385763911
CHECKED: BY: F.GHAZI AT: 03.02.18 Tel:98 21 63492100 Fax:98 21 66636709 P.O box:19395/1371

APPROVED: BY: A.HASANI AT: 03.02.18 DRAWING NO.: Sh. No.: 000
STANDARD: - FULMEN REF.: E/2344 GE30OMR=ZOOG CONT 0001
DWG NO. PART SH. NO. REVISION TITLE

1 GE30OMR=Z00G 0000 0 1 COVER SHEET


2 0001 0 1 CONTENTS
3 0004 0 1 REFERENCES
4 4100 0 1 ALARM WINDOWS-132KV LINE =E01&=E03
5 4101 0 1 132KV LINE =E01&E03
6 4102 0 1 132KV LINE =E01&E03
7 4103 0 1 132KV LINE =E01&E03
8 4104 0 1 132KV LINE =E01&E03
9 4200 0 1 ALARM WINDOWS-132/20KV TRANSFORMER =E02&E04
10 4201 0 1 132/20KV TRANSFORMER =E02&E04
11 4202 0 1 132/20KV TRANSFORMER =E02&E04
12 4203 0 1 132/20KV TRANSFORMER =E02&E04
13 4204 0 1 132/20KV TRANSFORMER =E02&E04
14 4300 0 1 ALARM WINDOWS-132KV BUS COUPLER
15 4301 0 1 132KV BUS COUPLER
16 4302 1 132KV BUS COUPLER
17 6100 0 1 ALARM WINDOWS 20KV INCOMING
18 6101 0 1 20KV INCOMING
19 6102 0 1 20KV INCOMING
20 6200 0 1 ALARM WINDOWS-20KV BUS COUPLER
21 6201 0 1 20KV BUS COUPLER
22 6202 1 20KV BUS COUPLER
23 6300 0 1 ALARM WINDOWS-20KV OUTGOING
24 6301 0 1 20KV OUTGOING
25 6302 0 1 20KV OUTGOING
26 9900 0 1 ALARM WINDOWS-GENERAL/COMMON
27 9901 0 1 GENERAL/COMMON
28 9902 0 1 GENERAL/COMMON
29 9903 0 1 GENERAL/COMMON
30 9910 0 1 ALARM WINDOWS- AVR
31 9911 0 1 AVR
32 9912 0 1 AVR
33 9913 0 1 AVR
34
35
36
37
38
39

REV DRAWN APPR. DATE MODIFICATION BY AT TITLE: TITLE:

0 A.TAEFI A.HASANI 03.02.18 ORIGINAL ISSUE DESIGNED A.TAEFI 03.02.18 A.R.W.A SIGNALING LIST OMRANI 4 ZONE
1 A.TAEFI A.HASANI 12.03.18 DUE TO ANACO COMMENTS DRAWN A.TAEFI 03.02.18 ARDABIL REGIONAL WATER AUTHORITY 132/20 KV SUBSTATION SH.NO.

CHECKED F.GHAZI 03.02.18 CONSULTING ENGINEERS: DWG. NO. 0001


FULMEN REF.: APPROVED A.HASANI 03.02.18 ANACO CONTENT GE30OMR=ZOOG CONT.

E/2344 STANDARD: - CONTRACT NO.: - 0004


REFERENCES

1- TECHNICAL SPECIFICATION

2- PROTECTION & METERING S.L.D

REV DRAWN APPR. DATE MODIFICATION BY AT TITLE: TITLE:

0 A.TAEFI A.HASANI 03.02.18 ORIGINAL ISSUE DESIGNED A.TAEFI 03.02.18 A.R.W.A SIGNALING LIST OMRANI 4 ZONE
1 A.TAEFI A.HASANI 12.03.18 DUE TO ANACO COMMENTS DRAWN A.TAEFI 03.02.18 ARDABIL REGIONAL WATER AUTHORITY 132/20 KV SUBSTATION SH.NO.

CHECKED F.GHAZI 03.02.18 CONSULTING ENGINEERS: DWG. NO. 0004


FULMEN REF.: APPROVED A.HASANI 03.02.18 ANACO REFERENCES GE30OMR=ZOOG CONT.

E/2344 STANDARD: - CONTRACT NO.: - 4100


D.O.C /D.E.F
PROTECTION DC
PROTECTION DISNACE CONTROL
FAIL/ RELAY FAULTY CBF STAGE 1
TRIP (BACKUP PROTECTION FUSE /OPERATION DC
SUB I OPERATED
RELAY) FAILURE DETECTED SUPPLY FAIL

DIRECT
TRANSFER TRIP
DISTANCE
ROTECTION DC FAIL/ RECEIVED CBF STAGE2 SF6 PRESSURE LOW -
PROTECTION PSB
RELAY FAULTY SUB II (CH.NO.3 & NO.4.) OPERATED FIRST STAGE
OPERATED
TRIP
(BACKUP)

LINE CVT MCB/FUSE TELEPROTECTION T.C.S 1or2 RELAY LOCKOUT RELAY C.B-QA1 BLOCK DUE
FAIL CHANNEL FAULTY COIL OPERATED OPERATED TO LOSS OF SF6

DISTANCE UV/OV LINE PROTECTION CB/DS MOTOR


SPARE
PROTECTION TRIP PROTECTION TRIP SIGNAL RECEIVED SUPPLY FAIL

CB/DS/MARSHALING
SOTF CB-QA1 SPRING URGENT
A/R DEFINITE TRIP BOX HEATING
PROTECTION TRIP CHARGE FAIL NON URGENT
SUPPLY FAIL

BLANK

REV DRAWN APPR. DATE MODIFICATION BY AT TITLE: TITLE:

0 A.TAEFI A.HASANI 03.02.18 ORIGINAL ISSUE DESIGNED A.TAEFI 03.02.18 A.R.W.A SIGNALING LIST OMRANI 4 ZONE
1 A.TAEFI A.HASANI 12.03.18 DUE TO ANACO COMMENTS DRAWN A.TAEFI 03.02.18 ARDABIL REGIONAL WATER AUTHORITY 132/20 KV SUBSTATION SH.NO.

CHECKED F.GHAZI 03.02.18 CONSULTING ENGINEERS: ALARM WINDOWS DWG. NO. 4100
FULMEN REF.: APPROVED A.HASANI 03.02.18 ANACO 132 KV LINE =E01&=E03 GE30OMR=ZOOG CONT.

E/2344 STANDARD: - CONTRACT NO.: - 4101


ANNOUNC. SCADA IND. LAMP
No. DESCRIPTION (SOURCE PANEL) E.R F.R REMARK
N.URG. URG. IND. ALARM CONT. LOCATION COLOR

1 PROTECTION DC SUPPLY FAIL SUB I (+R)


2 RELAY FAULTY SUBI (+R)
3 PROTECTION DC FAIL/ RELAY FAULTY SUB I (+R) X X X
4 PROTECTION DC SUPPLY FAIL SUB II (+R)
5 RELAY FAULTY SUB II (+R)
6 ROTECTION DC FAIL/ RELAY FAULTY SUB II(+R) X X X
7
8 CVT WIND METERING SUB I MCB OPERATE(+R)
9 CVT WIND PROT SUBI MCB (+R)
10 CVT WIND PROT SUB II MCB (+R)
11 CVT WIND SYNCHRONIZING MCB OPERATED (+R)
12 LINE CVT MCB/FUSE FAIL (+R) X X X
13
14
15 DISTANCE PROTECTION TRIP (+R) X X
16 DISTANCE PROTECTION ZONE 1 TRIP (+R) X X
17 DISTANCE PROTECTION ZONE 2 / ZONE 3 TRIP (+R) X X
18 DISTANCE PROTECTION DOC/DEF TRIP (+R) X X
19 A/R DEFINITE TRIP (+R) X X X
20 D.O.C /D.E.F PROTECTION TRIP (BACKUP RELAY) (+R) X X X X
21 D.O.C PROTECTION TRIP (+R) X
22 D.E.F PROTECTIONTRIP (+R) X
23
24
25 DIRECT TRANSFER TRIP RECEIVED (CH.NO.3 & NO.4.)(+R) X X X X
26 DIRECT TRANSFER TRIP SEND (CH.NO.3 & NO.4)(+R) X X
27 TELEPROTECTION CHANNEL FAULTY (+R) X
28 CH1 FAULTY (+R) X X
29 CH2 FAULTY (+R) X X
30 CH3 FAULTY (+R) X X
31 (+R)CH4 FAULTY X X
32 UV/OV PROTECTION TRIP (+R) X
33 UV PROTECTION TRIP (+R) X X X
34 OV PROTECTION TRIP (+R) X X X
35
36 SOTF PROTECTION TRIP (+R) X X X X
37 DISNACE PROTECTION DETECTION FUSE FAILURE DETECTED (+R) X X X X
38 DISTANCE PROTECTION PSB OPERATED (+R) X X X X

REV DRAWN APPR. DATE MODIFICATION BY AT TITLE: TITLE:

0 A.TAEFI A.HASANI 03.02.18 ORIGINAL ISSUE DESIGNED A.TAEFI 03.02.18 A.R.W.A SIGNALING LIST OMRANI 4 ZONE
1 A.TAEFI A.HASANI 12.03.18 DUE TO ANACO COMMENTS DRAWN A.TAEFI 03.02.18 ARDABIL REGIONAL WATER AUTHORITY 132/20 KV SUBSTATION SH.NO.

CHECKED F.GHAZI 03.02.18 CONSULTING ENGINEERS: DWG. NO. 4101


FULMEN REF.: APPROVED A.HASANI 03.02.18 ANACO 132 KV LINE =E01&=E03 GE30OMR=ZOOG CONT.

E/2344 STANDARD: - CONTRACT NO.: - 4102


ANNOUNC. SCADA IND. LAMP
No. DESCRIPTION(SOURCE PANEL) E.R F.R REMARK
N.URG. URG. IND. ALARM CONT. LOCATION COLOR

39 T.C.S 1or2 RELAY COIL OPERATED (+R) X X X


40
41 DS-QB1 CLOSE POS (+W) X X
42 DS-QB1 OPEN POS (+W) X X
43 CB-QA1 CLOSE POS (+W) X X
44 CB-QA1 OPEN POS (+W) X X
45
46 DS-QB9 CLOSE POS (+W) X X
47 DS-QB9 OPEN POS (+W) X X
48
49 ES-QC9 CLOSE POS (+W) X X
50 ES-QC9 OPEN POS (+W) X X
51
52 DISTANCE Z1 SUB I SIGNAL SEND(CH.1)(+R) X X
53 DEF SUB I & DEF SUB II SIGNAL SEND(CH.2)(+R) X X
54
55 CARRIER CH.1 RECEIVED(DISTANCE SUB I)(+R) X X
56 CARRIER CH.2 RECEIVED(DEF SUB I & DEF SUB II )(+R) X X
57 LINE PROTECTION SIGNAL RECEIVED(+R) X
58
59 CB/DS/MARSHALING BOX HEATING SUPPLY FAIL (+R) X X X
60
61
62 C.B -QA1 SYNCHRO CALLING (+W) X X X
63 C.B -QA1 SYNCHRO CANCELING (+W) X X
64 CBF STAGE 1 OPERATED (+R) X X X
65 CBF STAGE2 OPERATED (+R) X X X X
66
67 LOCKOUT RELAY OPERATED (+R) X X X
68
69
70
71
72
73

REV DRAWN APPR. DATE MODIFICATION BY AT TITLE: TITLE:

0 A.TAEFI A.HASANI 03.02.18 ORIGINAL ISSUE DESIGNED A.TAEFI 03.02.18 A.R.W.A SIGNALING LIST OMRANI 4 ZONE
1 A.TAEFI A.HASANI 12.03.18 DUE TO ANACO COMMENTS DRAWN A.TAEFI 03.02.18 ARDABIL REGIONAL WATER AUTHORITY 132/20 KV SUBSTATION SH.NO.

CHECKED F.GHAZI 03.02.18 CONSULTING ENGINEERS: DWG. NO. 4102


FULMEN REF.: APPROVED A.HASANI 03.02.18 ANACO 132 KV LINE =E01&=E03 GE30OMR=ZOOG CONT.

E/2344 STANDARD: - CONTRACT NO.: - 4103


ANNOUNC. SCADA IND. LAMP
No. DESCRIPTION(SOURCE PANEL) E.R F.R REMARK
N.URG. URG. IND. ALARM CONT. LOCATION COLOR

74
75 C.B-QA1 IN LOCAL MODE(+W) X +W R
76 C.B-QA1 LOCKOUT RESET COMMAND (+YV) X X TO(+R)
77 C.B-QA1 LOCKOUT RESET COMMAND (+R) X
78
79
80
81
82
83
84
85
86
87
88
89
90
91
92
93 CB/DS MOTOR SUPPLY FAIL(+R) X X X
94
95
96 CB-QA1 SPRING CHARGE FAIL (+R) X X X
97
98
99 OPERATION DC SUPPLY FAIL (+W)
100 CONTROL DC SUPPLY FAIL (+W)
101 CONTROL /OPERATION DC SUPPLY FAIL (+W) X X X
102
103 SF6 PRESSURE LOW - FIRST STAGE (+R) X X X
104 C.B-QA1 BLOCK DUE TO LOSS OF SF6 (+R) X X X
105
106
107
108

REV DRAWN APPR. DATE MODIFICATION BY AT TITLE: TITLE:

0 A.TAEFI A.HASANI 03.02.18 ORIGINAL ISSUE DESIGNED A.TAEFI 03.02.18 A.R.W.A SIGNALING LIST OMRANI 4 ZONE
1 A.TAEFI A.HASANI 12.03.18 DUE TO ANACO COMMENTS DRAWN A.TAEFI 03.02.18 ARDABIL REGIONAL WATER AUTHORITY 132/20 KV SUBSTATION SH.NO.

CHECKED F.GHAZI 03.02.18 CONSULTING ENGINEERS: DWG. NO. 4103


FULMEN REF.: APPROVED A.HASANI 03.02.18 ANACO 132 KV LINE =E01&=E03 GE30OMR=ZOOG CONT.

E/2344 STANDARD: - CONTRACT NO.: - 4104


ANNOUNC. SCADA IND. LAMP
No. DESCRIPTION(SOURCE PANEL) E.R F.R REMARK
N.URG. URG. IND. ALARM CONT. LOCATION COLOR

109
110 DS-QB1 CLOSE COMMAND FROM SCADA (+YV) X TO (+W)
111 DS-QB1 OPEN COMMAND FROM SCADA (+YV) X TO (+W)
112
113 CB-QA1 CLOSE COMMAND FROM SCADA (+YV) X TO (+W)
114 CB-QA1 OPEN COMMAND FROM SCADA (+YV) X TO (+W)
115
116 DS-QB9 CLOSE COMMAND FROM SCADA (+YV) X TO (+W)
117 DS-QB9 OPEN COMMAND FROM SCADA (+YV) X TO (+W)
118 AUTO RECLOSER OFF (+W) X X
119 AUTO RECLOSER ON (+W) X X
120 AUTO RECLOSER CB TRIP LOCKOUT (+R) X X
121
122 AUTO RECLOSER IN SERVICE (+R) X X
123 AUTO RECLOSER IN PROGRESS (+R) X X
124 AUTO RECLOSER OUT OF SERVICE (+R) X X
125 AUTO RECLOSER BLOCKED (+R) X
126 LINE CURRENT (PH.A) (+R) X
127 LINE CURRENT (PH.B) (+R) X
128 LINE CURRENT (PH.C) (+R) X
129 NEUTRAL CURRENT (+R) X
130 LINE VOLTAGE (PH.A)(+R) X
131 LINE VOLTAGE (PH.B) (+R) X
132 LINE VOLTAGE (PH.C) (+R) X
133
134 LINE VOLTAGE Vab (+R) X
135 LINE VOLTAGE Vbc (+R) X
136 LINE VOLTAGE Vca (+R) X
137
138 CB SYNCHRO CALLING FROM SCADA (+YV) X TO (+W)
139 CB SYNCHRO CANCELING FROM SCADA (+YV) X TO (+W)
140
141
142
143

REV DRAWN APPR. DATE MODIFICATION BY AT TITLE: TITLE:

0 A.TAEFI A.HASANI 03.02.18 ORIGINAL ISSUE DESIGNED A.TAEFI 03.02.18 A.R.W.A SIGNALING LIST OMRANI 4 ZONE
1 A.TAEFI A.HASANI 12.03.18 DUE TO ANACO COMMENTS DRAWN A.TAEFI 03.02.18 ARDABIL REGIONAL WATER AUTHORITY 132/20 KV SUBSTATION SH.NO.

CHECKED F.GHAZI 03.02.18 CONSULTING ENGINEERS: DWG. NO. 4104


FULMEN REF.: APPROVED A.HASANI 03.02.18 ANACO 132 KV LINE =E01&=E03 GE30OMR=ZOOG CONT.

E/2344 STANDARD: - CONTRACT NO.: - 4200


TRANS CB BLOCK-LOSS OF
PROTECTION DC FAIL OLTC PRESSURE TRANS CUBICLE AUX/GR TRANS LOCKOUT RELAY
SENSITIVE E/F TRIP NON_RETURN SF6/SPRING CHARGE
RELAY FAULTY SUBⅠ RELAY TRIP AC SUPPLY FAIL BUCHHOLZ ALARM OPERATED
VALVE TRIP FAIL

AUX/GR TRANS
PROTECTION DC FAIL CB/DS/MARSHALING
UV/OV PROTECTION TRANS PRESURE TRANS OIL LEVEL PRESSURE RELIEF AUX/GR TRANS OIL CBF SRAGE 1
RELAY FAULTY SUB Ⅱ BOX HEATING SUPPLY
TRIP RELIEF TRIP ALARM TRIP TEMP HIGH ALARM OPERATED
FAIL

DIFFERENTIAL RELAY TRANS OVER FLUX TRANS TRANS BUCHHOLZ AUX/GR TRANS CBF SRAGE 2
T.C.S 1OR2 OPERATED CB SPRING CHARGE FAIL
TRIP TRIP BUCHHOLZ TRIP ALARM BUCHHOLZ TRIP OPERATED

TRANS
TRANS THERMAL TRANS OIL/WINDING AUX/GR TRANS OIL OLTC OIL LEVEL SF6 PRESSURE LOW CB SF6 PRESSURE LOW-
REF TRIP(HV/LV) OIL/WINDING
OVER LOAD TEMP HIGH ALARM TEMP HIGH TRIP ALARM BLOCK FIRST STAGE
TEMP HIGH TRIP

BUCHHOLZ RELAY OLTC


TRANS COOLING AUX/GR TRANS OIL CONTROL DC SUPPLY CB/DS MOTOR SUPPLY
OC,E/F TRIP (HV) AIR DETECTOR PROTECTION SPARE
FAN FAILURE LEVEL ALARM FAIL FAIL
ALARM RELAY TRIP

URGENT NON URGENT BLANK

REV DRAWN APPR. DATE MODIFICATION BY AT TITLE: TITLE:

0 A.TAEFI A.HASANI 03.02.18 ORIGINAL ISSUE DESIGNED A.TAEFI 03.02.18 A.R.W.A SIGNALING LIST OMRANI 4 ZONE
1 A.TAEFI A.HASANI 12.03.18 DUE TO ANACO COMMENTS DRAWN A.TAEFI 03.02.18 ARDABIL REGIONAL WATER AUTHORITY 132/20 KV SUBSTATION SH.NO.

CHECKED F.GHAZI 03.02.18 CONSULTING ENGINEERS: ALARM WINDOWS DWG. NO. 4200
FULMEN REF.: APPROVED A.HASANI 03.02.18 ANACO 132/20KV TRANSFORMER =E02&E04 GE30OMR=ZOOG CONT.

E/2344 STANDARD: - CONTRACT NO.: - 4201


ANNOUNC. SCADA IND. LAMP
No. DESCRIPTION(SOURCE PANEL) E.R F.R REMARK
N.URG. URG. IND. ALARM CONT. LOCATION COLOR

1 PROTECTION DC FAIL SUB I (+R)


2 RELAY FAULTY SUBI (+R)
3 PROTECTION DC FAIL/ RELAY FAULTY SUB I (+R) X X X
4 PROTECTION DC FAIL SUB II (+R)
5 RELAY FAULTY SUB II (+R)
6 PROTECTION DC FAIL/ RELAY FAULTY SUB II (+R) X X X
7
8
9 DIFFERENTIAL RELAY TRIP (+R) X X X X
10
11 R.E.F TRIP (HV) (+R) X
12 R.E.F TRIP (LV)(+R) X
13 R.E.F TRIP (HV/LV)(+R) X X X X
14
15 INST.& INV. TIME O/C TRIP (HV) (+R)
16 INST.& INV. TIME E/F TRIP (HV) (+R)
17 O/C , E/F TRIP (HV) V X X X X
18
19
20
21 SENSITIVE E/F TRIP (+R) X X X X
22
23 UV PROTECTION TRIP (+R)
24 OV PROTECTION TRIP (+R)
25 UV , OV PROTECTION TRIP (+R) X X X X
26
27 TRANS OVER FLUX TRIP (+R) X X X X
28 TRANS THERMAL OVER LOAD (+R) X X X X
29 BUCHHOLZ RELAY AIR DETECTOR ALARM (+R) X X X X
30 TRANS. NON_ RETURN VALVE TRIP (+R) X X X
31 TRANS. PRESSURE RELIEF TRIP (+R) X X X
32 TRANS. BUCHHOLZ TRIP (+R) X X X
33 TRANS. OIL TEMP HIGH TRIP (+R)
34 TRANS. WINDING TEMP HIGH TRIP (HV) (+R)
35 TRANS. WINDING TEMP HIGH TRIP (LV) (+R)
36 TRANS. OIL/ WINDING TEMP HIGH TRIP (HV,LV) (+R) X X X
37 OLTC PROTECTION RELAY TRIP (+R) X X X
38 OLTC PRESSURE RELAY TRIP (+R) X X X
39 TRANS. MECHANICAL PROTECTION TIRP (+R) X
40

REV DRAWN APPR. DATE MODIFICATION BY AT TITLE: TITLE:

0 A.TAEFI A.HASANI 03.02.18 ORIGINAL ISSUE DESIGNED A.TAEFI 03.02.18 A.R.W.A SIGNALING LIST OMRANI 4 ZONE
1 A.TAEFI A.HASANI 12.03.18 DUE TO ANACO COMMENTS DRAWN A.TAEFI 03.02.18 ARDABIL REGIONAL WATER AUTHORITY 132/20 KV SUBSTATION SH.NO.

CHECKED F.GHAZI 03.02.18 CONSULTING ENGINEERS: DWG. NO. 4201


FULMEN REF.: APPROVED A.HASANI 03.02.18 ANACO 132/20KV TRANSFORMER =E02&E04 GE30OMR=ZOOG CONT.

E/2344 STANDARD: - CONTRACT NO.: - 4202


ANNOUNC. SCADA IND. LAMP
No. DESCRIPTION(SOURCE PANEL) E.R F.R REMARK
N.URG. URG. IND. ALARM CONT. LOCATION COLOR

41
42 TRANS OIL LEVEL ALARM (+R) X X
43 TRANS. BUCHHOLZ ALARM (+R) X X
44 TRANS. WINDING TEMP HIGH ALARM (HV) (+R)
45 TRANS. WINDING TEMP HIGH ALARM (LV) (+R)
46 TRANS. OIL TEMP HIGH ALARM (+R)
47 TRANS. OIL/ WINDING TEMP HIGH ALARM (+R) X X
48 TRANS. MECHANICAL PROTECTION ALARM (+R) X
49
50
51 TRANS. COOLING FAN FAILURE (+R) X X
52 H/L/S FAILURE (+R)
53 CONTROL POWER FAILURE (+R)
54 TRANS. CUBICLE AC SUPPLY FAIL (+R) X X X
55
56
57
58
59 AUX./GR.TRANS. PRESSURE RELIEF TRIP (+R) X X X
60 AUX./GR.TRANS. BUCHHOLZ TRIP (+R) X X X
61 AUX./GR.TRANS. OIL TEMP HIGH TRIP (+R) X X X
62 AUX./GR.TRANS. MECHANICAL PROT. TRIP (+R) X
63
64
65 AUX./GR.TRANS. OIL LEVEL ALARM (+R) X X
66 AUX./GR. TRANS. BUCHHOLZ ALARM (+R) X X
67 AUX./GR.TRANS. OIL TEMP. HIGH ALARM (+R) X X
68 AUX./GR. TRANS. MECHANICAL ALARM (+R) X
69
70
71 T.C.S 1or2 OPERATED (HV) (+R) X X X
72
73
74

REV DRAWN APPR. DATE MODIFICATION BY AT TITLE: TITLE:

0 A.TAEFI A.HASANI 03.02.18 ORIGINAL ISSUE DESIGNED A.TAEFI 03.02.18 A.R.W.A SIGNALING LIST OMRANI 4 ZONE
1 A.TAEFI A.HASANI 12.03.18 DUE TO ANACO COMMENTS DRAWN A.TAEFI 03.02.18 ARDABIL REGIONAL WATER AUTHORITY 132/20 KV SUBSTATION SH.NO.

CHECKED F.GHAZI 03.02.18 CONSULTING ENGINEERS: DWG. NO. 4202


FULMEN REF.: APPROVED A.HASANI 03.02.18 ANACO 132/20KV TRANSFORMER =E02&E04 GE30OMR=ZOOG CONT.

E/2344 STANDARD: - CONTRACT NO.: - 4203


ANNOUNC. SCADA IND. LAMP
No. DESCRIPTION(SOURCE PANEL) E.R F.R REMARK
N.URG. URG. IND. ALARM CONT. LOCATION COLOR

75
76 OLTC OIL LEVEL ALARM (+R) X X X
77
78
79
80
81
82
83 CONTROL DC SUPPLY FAIL (+W) X X X
84
85
86 LOCKOUT RELAY OPERATED HV (+R) X X X
87
88
89 CB/DS/MARSHALING BOX HEATING SUPPLY FAIL (+R) X X X
90
91
92 CB SPRING CHARGE FAIL(HV)(+R) X X X
93 SF6 PRESSURE LOW CB BLOCK (HV)(+R) X X X
94
95
96
97
98
99
100 CB/DS MOTOR SUPPLY FAIL (+SV) X X X
101 CB SPRING CHARGE FAIL (+SV)
102 C.B BLOCK DUE TO LOSS OF SF6 (+SV)
103 CB BLOCK- LOSS OF SF6/SPRING CHARGE FAIL (+SV) X X X
104 CBF STAGE 1 OPERATED (+R) X X X
105 CBF STAGE 2 OPERATED (+R) X X X X
106
107 SF6 PRESSURE LOW - FIRST STAGE (+R) X X X
108

REV DRAWN APPR. DATE MODIFICATION BY AT TITLE: TITLE:

0 A.TAEFI A.HASANI 03.02.18 ORIGINAL ISSUE DESIGNED A.TAEFI 03.02.18 A.R.W.A SIGNALING LIST OMRANI 4 ZONE
1 A.TAEFI A.HASANI 12.03.18 DUE TO ANACO COMMENTS DRAWN A.TAEFI 03.02.18 ARDABIL REGIONAL WATER AUTHORITY 132/20 KV SUBSTATION SH.NO.

CHECKED F.GHAZI 03.02.18 CONSULTING ENGINEERS: DWG. NO. 4203


FULMEN REF.: APPROVED A.HASANI 03.02.18 ANACO 132/20KV TRANSFORMER =E02&E04 GE30OMR=ZOOG CONT.

E/2344 STANDARD: - CONTRACT NO.: - 4204


ANNOUNC. SCADA IND. LAMP
No. DESCRIPTION(SOURCE PANEL) E.R F.R REMARK
N.URG. URG. IND. ALARM CONT. LOCATION COLOR

109
110
111
112
113 CB-QA1 CLOSE COMMAND FROM SCADA (+YV) X TO (+W)
114 CB-QA1 OPEN COMMAND FROM SCADA (+YV) X TO (+W)
115
116
117 DS-QB1 CLOSE COMMAND FROM SCADA (+YV) X TO (+W)
118 DS-QB1 OPEN COMMAND FROM SCADA (+YV) X TO (+W)
119
120
121
122
123 DS-QB1 CLOSE POS (+W) X
124 DS-QB1 OPEN POS (+W) X
125
126
127 CB-QA1 CLOSE POS (+W) X
128 CB-QA1 OPEN POS (+W) X
129
130
131
132
133
134 C.B-QA1 IN LOCAL MODE(+W) X +W R
135 C.B-QA1 LOCKOUT RESET COMMAND (+YV) X X TO(+R)
136 C.B-QA1 LOCKOUT RESET COMMAND (+R) X
137
138 FEEDER CURRNT PH.A (+R) X
139 FEEDER CURRNT PH.B (+R) X
140 FEEDER CURRNT PH.C (+R0 X
141 NEUTRAL CURRENT 9+R) X
142

REV DRAWN APPR. DATE MODIFICATION BY AT TITLE: TITLE:

0 A.TAEFI A.HASANI 03.02.18 ORIGINAL ISSUE DESIGNED A.TAEFI 03.02.18 A.R.W.A SIGNALING LIST OMRANI 4 ZONE
1 A.TAEFI A.HASANI 12.03.18 DUE TO ANACO COMMENTS DRAWN A.TAEFI 03.02.18 ARDABIL REGIONAL WATER AUTHORITY 132/20 KV SUBSTATION SH.NO.

CHECKED F.GHAZI 03.02.18 CONSULTING ENGINEERS: DWG. NO. 4204


FULMEN REF.: APPROVED A.HASANI 03.02.18 ANACO 132/20KV TRANSFORMER =E02&E04 GE30OMR=ZOOG CONT.

E/2344 STANDARD: - CONTRACT NO.: - 4300


PROTECTION DC BB.2 FREQUENCY
D.S MOTOR BB.1 FREQUENCY
SUPPLY LOAD SHEDDING
SUPPLY FAIL LOAD SHEDDING ST.2
FAIL/RELAY FAULTY ST.3

BB.2 FREQUENCY
132KV BUSBAR CONTROL DC BB.1 FREQUENCY
LOAD SHEDDING
PROTECTION TRIP SUPPLY FAIL LOAD SHEDDING ST.3
ST.4

OV/UV BB.1 FREQUENCY BB.1&BB.2 UNDER


SPARE
PROTECTION TRIP LOAD SHEDDING ST.4 FREQUENCY TRIP

DS/MARSHALING
132KV BB1&BB2 BB.2 FREQUENCY
BOX HEATING SPARE
CVT FAIL LOAD SHEDDING ST.1
SUPPLY FAIL

BUSBAR CT BB.1 FREQUENCY


BB.2 FREQUENCY
SUPERVISION LOAD SHEDDING SPARE
LOAD SHEDDING ST.2 URGENT
ALARM ST.1

NON URGENT

BLANK

REV DRAWN APPR. DATE MODIFICATION BY AT TITLE: TITLE:

0 A.TAEFI A.HASANI 03.02.18 ORIGINAL ISSUE DESIGNED A.TAEFI 03.02.18 A.R.W.A SIGNALING LIST OMRANI 4 ZONE
1 A.TAEFI A.HASANI 12.03.18 DUE TO ANACO COMMENTS DRAWN A.TAEFI 03.02.18 ARDABIL REGIONAL WATER AUTHORITY 132/20 KV SUBSTATION SH.NO.

CHECKED F.GHAZI 03.02.18 CONSULTING ENGINEERS: ALARM WINDOWS DWG. NO. 4300
FULMEN REF.: APPROVED A.HASANI 03.02.18 ANACO 132KV BUS COUPLER GE30OMR=ZOOG CONT.

E/2344 STANDARD: - CONTRACT NO.: - 4301


ANNOUNC. SCADA IND. LAMP
No. DESCRIPTION(SOURCE PANEL) E.R F.R REMARK
N.URG. URG. IND. ALARM CONT. LOCATION COLOR

1
2 PROTECTION DC SUPPLY FAIL (+R)
3 BB.P RELAY FAULTY (+R)
4 UNDER VOLTAGE RELAY B.B.1 FAULTY (+R)
5 UNDER VOLTAGE RELAY B.B.2 FAULTY (+R)
6 PROTECTION DC SUPPLY FAIL / RELAY FAULTY (+R) X X X
7
8
9
10
11 132KV BUSBAR PROTECTION TRIP (+R) X X X X
12
13
14 UV/OV PROTECTION TRIP (B.B.1) (+R) X
15 UV/OV PROTECTION TRIP (B.B.2) (+R) X
16 UV/OV PROTECTION TRIP (+R) X X X
17
18 SUB/SCADA SWITCH IN SUB POSITION (+W) X
19 SUB/SCADA SWITCH IN SCADA POSITION (+W) X
20
21
22
23
24 132KV BB.1 CVT FAIL (+R) X
25 132KV BB.2 CVT FAIL (+R) X
26 132KV BB.1&BB.2 CVT FAIL (+R) X X
27
28 BUSBAR CT SUPERVISION ALARM (+R) X X X
29
30
31 D.S MOTOR SUPPLY FAIL (+SV) X X X
32
33 CONTROL DC SUPPLY FAIL (+SV) X X X
34
35

REV DRAWN APPR. DATE MODIFICATION BY AT TITLE: TITLE:

0 A.TAEFI A.HASANI 03.02.18 ORIGINAL ISSUE DESIGNED A.TAEFI 03.02.18 SIGNALING LIST OMRANI 4 ZONE
1 A.TAEFI A.HASANI 12.03.18 DUE TO ANACO COMMENTS DRAWN A.TAEFI 03.02.18 ARDABIL REGIONAL WATER AUTHORITY 132/20 KV SUBSTATION SH.NO.

CHECKED F.GHAZI 03.02.18 CONSULTING ENGINEERS: DWG. NO. 4301


FULMEN REF.: APPROVED A.HASANI 03.02.18 ANACO 132KV BUS COUPLER GE30OMR=ZOOG CONT.

E/2344 STANDARD: - CONTRACT NO.: - 4302


ANNOUNC. SCADA IND. LAMP
No. DESCRIPTION(SOURCE PANEL) E.R F.R REMARK
N.URG. URG. IND. ALARM CONT. LOCATION COLOR

36
37
38
39
40 DS/MARSHALING BOX HEATING SUPPLY FAIL (+SV) X X X
41 DS/QB5 D.S CLOSE POS (+W) X X
42 DS/QB5 D.S OPEN POS (+W) X X
43
44
45 QB5 D.S OPEN COMMAND FROM SCADA (+YV) X TO(+W)
46 QB5 D.S CLOSE COMMAND FROM SCADA (+YV) X TO(+W)
47
48
49
50 BB.1 FREQUENCY LOAD SHEDDING ST.1 (+R) X X X X
51 BB.1 FREQUENCY LOAD SHEDDING ST.2 (+R) X X X X
52 BB.1 FREQUENCY LOAD SHEDDING ST.3 (+R) X X X X
53 BB.1 FREQUENCY LOAD SHEDDING ST.4 (+R) X X X X
54
55
56 BB.2 FREQUENCY LOAD SHEDDING ST.1 (+R) X X X X
57 BB.2 FREQUENCY LOAD SHEDDING ST.2 (+R) X X X X
58 BB.2 FREQUENCY LOAD SHEDDING ST.3 (+R) X X X X
59 BB.2 FREQUENCY LOAD SHEDDING ST.4 (+R) X X X X
60
61
62
63
64 BB.1 UNDER FREQUENCY TRIP (+R)
65 BB.2 UNDER FREQUENCY TRIP 9+R)
66 BB.1&BB.2 UNDER FREQUENCY TRIP (+R) X X X X
67
68
69
70

REV DRAWN APPR. DATE MODIFICATION BY AT TITLE: TITLE:

0 A.TAEFI A.HASANI 03.02.18 ORIGINAL ISSUE DESIGNED A.TAEFI 03.02.18 A.R.W.A SIGNALING LIST OMRANI 4 ZONE
1 A.TAEFI A.HASANI 12.03.18 DUE TO ANACO COMMENTS DRAWN A.TAEFI 03.02.18 ARDABIL REGIONAL WATER AUTHORITY 132/20 KV SUBSTATION SH.NO.

CHECKED F.GHAZI 03.02.18 CONSULTING ENGINEERS: DWG. NO. 4302


FULMEN REF.: APPROVED A.HASANI 03.02.18 ANACO 132KV BUS COUPLER GE30OMR=ZOOG CONT.

E/2344 STANDARD: - CONTRACT NO.: - 6100


PROTECTION DC
SUPPLY FAIL/RELAY O/C AND E/F
FAULTY PROTECTION TRIP

T.C.S RELAY OV/UV


OPERATED PROTECTION TRIP

LOCKOUT RELAY
PT MCB FAIL FAIL
OPERATED

CB SPRING CHARGE CONTROL DC


FAIL SUPPLY FAIL

CB MOTOR SUPPLY URGENT


SPARE
FAIL
NON URGENT

BLACK

REV DRAWN APPR. DATE MODIFICATION BY AT TITLE: TITLE:

0 A.TAEFI A.HASANI 03.02.18 ORIGINAL ISSUE DESIGNED A.TAEFI 03.02.18 A.R.W.A SIGNALING LIST OMRANI 4 ZONE
1 A.TAEFI A.HASANI 12.03.18 DUE TO ANACO COMMENTS DRAWN A.TAEFI 03.02.18 ARDABIL REGIONAL WATER AUTHORITY 132/20 KV SUBSTATION SH.NO.

CHECKED F.GHAZI 03.02.18 CONSULTING ENGINEERS: ALARM WINDOWS DWG. NO. 6100
FULMEN REF.: APPROVED A.HASANI 03.02.18 ANACO 20KV INCOMING GE30OMR=ZOOG CONT.

E/2344 STANDARD: - CONTRACT NO.: - 6101


ANNOUNC. SCADA IND. LAMP
No. DESCRIPTION(SOURCE PANEL) E.R F.R REMARK
N.URG. URG. IND. ALARM CONT. LOCATION COLOR

1 PROTECTION DC SUPPLY FAIL (+R)


2 OV/UV RELAY FAULTY (+R)
3 O/C E/F RELAY FAULTY (+R)
4 PROTECTION DC SUPPLY FAIL/RELAY FAULTY (+R) X X X
5 T.C.S RELAY OPERATED (+R) X X X
6
7 PT MCB FAIL FAIL (+R) X X X
8
9 CB SPRING CHARGE FAIL (+SWG) X X X
10 CB MOTOR SUPPLY FAIL (+SWG) X X X
11
12
13 CB-QA1 IN SERVICE (+SWG) X X (+W)
14 CB-QA1 OUT OF SERVICE (+SWG) X X (+W)
15
16
17 CB-QA1 OPEN POS (+W) X X
18 CB-QA1 CLOSE POS (+W) X X
19
20 ES-QC9 OPEN POS (+W) X X
21 ES-QC9 CLOSE POS (+W) X X
22
23
24
25
26
27 CB-QA1 CLOSE COMMAND FROM SCADA (+YV) X TO(+SWG)
28 CB-QA1 OPEN COMMAND FROM SCADA (+YV) X TO(+SWG)
29
30
31
32 C.B-QA1 IN LOCAL X
33 C.B-QA1 LOCKOUT RESET FROM SCADA (+YV) X TO(+R)
34
35

REV DRAWN APPR. DATE MODIFICATION BY AT TITLE: TITLE:

0 A.TAEFI A.HASANI 03.02.18 ORIGINAL ISSUE DESIGNED A.TAEFI 03.02.18 A.R.W.A SIGNALING LIST OMRANI 4 ZONE
1 A.TAEFI A.HASANI 12.03.18 DUE TO ANACO COMMENTS DRAWN A.TAEFI 03.02.18 ARDABIL REGIONAL WATER AUTHORITY 132/20 KV SUBSTATION SH.NO.

CHECKED F.GHAZI 03.02.18 CONSULTING ENGINEERS: DWG. NO. 6101


FULMEN REF.: APPROVED A.HASANI 03.02.18 ANACO 20KV INCOMING GE30OMR=ZOOG 9905

E/2344 STANDARD: - CONTRACT NO.: - 6102


ANNOUNC. SCADA IND. LAMP
No. DESCRIPTION(SOURCE PANEL) E.R F.R REMARK
N.URG. URG. IND. ALARM CONT. LOCATION COLOR

36 O/C AND E/F (LV) PROTECTION TRIP (R) X X X X


37
38 OV/UV PROTECTION TRIP (R) X X X X
39
40
41
42
43
44 LOCKOUT RELAY OPERATED (+R) X X X
45
46 CONTROL DC SUPPLY FAIL (+W) X X X
47
48
49 LOCAL/REMOTE S/SW IN LOCAL MODE (+SWG) X
50 LOCAL/REMOTE S/SW IN REMOTE MODE (+SWG) X
51
52 INCOMING CURRENT PH.A (+R) X
53 INCOMING CURRENT PH.B (+R) X
54 INCOMING CURRENT PH.C (+R) X
55 NETRUAL CURRENT (+R) X
56
57
58
59
60 INCOMING VOLTAGE (PH.A)(+R) X
61 INCOMING VOLTAGE (PH.B)(+R) X
62 INCOMING VOLTAGE (PH.C)(+R) X
63
64
65
66
67
68
69
70

REV DRAWN APPR. DATE MODIFICATION BY AT TITLE: TITLE:

0 A.TAEFI A.HASANI 03.02.18 ORIGINAL ISSUE DESIGNED A.TAEFI 03.02.18 A.R.W.A SIGNALING LIST OMRANI 4 ZONE
1 A.TAEFI A.HASANI 12.03.18 DUE TO ANACO COMMENTS DRAWN A.TAEFI 03.02.18 ARDABIL REGIONAL WATER AUTHORITY 132/20 KV SUBSTATION SH.NO.

CHECKED F.GHAZI 03.02.18 CONSULTING ENGINEERS: DWG. NO. 6102


FULMEN REF.: APPROVED A.HASANI 03.02.18 ANACO 20KV INCOMING GE30OMR=ZOOG CONT

E/2344 STANDARD: - CONTRACT NO.: - 6200


O.C , E.F RELAY T.C.S RELAY
FAULTY OPERATED

LOCKOUT RELAY
O/C , E/F TRIP
OPERATED

CB SPRING CHARGE CB MOTOR SUPPLY


FAIL FAIL

20KV BB.1 PT
SPARE
MCB/FUSE FAIL

20KV BB.2 PT
MCB/FUSE FAIL URGENT

NON URGENT

BLANK

REV DRAWN APPR. DATE MODIFICATION BY AT TITLE: TITLE:

0 A.TAEFI A.HASANI 03.02.18 ORIGINAL ISSUE DESIGNED A.TAEFI 03.02.18 A.R.W.A SIGNALING LIST OMRANI 4 ZONE
1 A.TAEFI A.HASANI 12.03.18 DUE TO ANACO COMMENTS DRAWN A.TAEFI 03.02.18 ARDABIL REGIONAL WATER AUTHORITY 132/20 KV SUBSTATION SH.NO.

CHECKED F.GHAZI 03.02.18 CONSULTING ENGINEERS: ALARM WINDOWS DWG. NO. 6200
FULMEN REF.: APPROVED A.HASANI 03.02.18 ANACO 20KV BUS COUPLER GE30OMR=ZOOG CONT.

E/2344 STANDARD: - CONTRACT NO.: - 6201


ANNOUNC. SCADA IND. LAMP
No. DESCRIPTION(SOURCE PANEL) E.R F.R REMARK
N.URG. URG. IND. ALARM CONT. LOCATION COLOR

1
2
3 O.C , E.F RELAY FAULTY (+R) X X X
4
5
6
7
8
9
10 INST.& INV. TIME O/C TRIP (+R)
11 INST.& INV. TIME E/F TRIP (+R)
12 O/C , E/F TRIP (+R) X X X X
13
14
15
16
17
18
19
20
21
22 CB SPRING CHARGE FAIL (+SWG) X X X
23
24 20KV BB.1 PT MCB/FUSE FAIL (+SWG) X X X
25 20KV BB.2 PT MCB/FUSE FAIL (+SWG) X X X
26
27 T.C.S RELAY OPERATED (+R) X X X
28
29 LOCK OUT RELAY OPERATED (+R) X X X
30
31 CB MOTOR SUPPLY FAIL (+SWG) X X X
32
33
34
35

REV DRAWN APPR. DATE MODIFICATION BY AT TITLE: TITLE:

0 A.TAEFI A.HASANI 03.02.18 ORIGINAL ISSUE DESIGNED A.TAEFI 03.02.18 A.R.W.A SIGNALING LIST OMRANI 4 ZONE
1 A.TAEFI A.HASANI 12.03.18 DUE TO ANACO COMMENTS DRAWN A.TAEFI 03.02.18 ARDABIL REGIONAL WATER AUTHORITY 132/20 KV SUBSTATION SH.NO.

CHECKED F.GHAZI 03.02.18 CONSULTING ENGINEERS: DWG. NO. 6201


FULMEN REF.: APPROVED A.HASANI 03.02.18 ANACO 20KV BUS COUPLER GE30OMR=ZOOG CONT.

E/2344 STANDARD: - CONTRACT NO.: - 6202


ANNOUNC. SCADA IND. LAMP
No. DESCRIPTION(SOURCE PANEL) E.R F.R REMARK
N.URG. URG. IND. ALARM CONT. LOCATION COLOR

36
37
38 CB-QA1 OPEN POS (+W) X X
39 CB-QA1 CLOSE POS (+W) X X
40
41
42 CB-QA1 CLOSE COMMAND FROM SCADA(+YV) X TO(+W)
43 CB-QA1 OPEN COMMAND FROM SCADA (+YV) X TO(+W)
44
45
46
47 C.B-QA1 IN LOCAL (+W) X
48 C.B-QA1 LOCKOUT RESET (+YV) X
49
50
51
52 CB-QA1 IN SERVICE X X
53 CB-QA1 OUT OF SERVICE X X
54
55 20KV COUPLER CURRENT PH.A(+R) X
56 20KV COUPLER CURRENT PH.B(+R) X
57 20KV COUPLER CURRENT PH.C(+R) X
58 20KV NEUTRAL CURRENT (+R) X
59
60 20KV BB.1 COUPLER VOLTAGE PH.A(+SWG) X
61 20KV BB.1 COUPLER VOLTAGE PH.B(+SWG) X
62 20KV BB.1 COUPLER VOLTAGE PH.C(+SWG) X
63
64 20KV BB.2 COUPLER VOLTAGE PH.A(+SWG) X
65 20KV BB.2 COUPLER VOLTAGE PH.B(+SWG) X
66 20KV BB.2 COUPLER VOLTAGE PH.C(+SWG) X
67
68
69
70

REV DRAWN APPR. DATE MODIFICATION BY AT TITLE: TITLE:

0 A.TAEFI A.HASANI 03.02.18 ORIGINAL ISSUE DESIGNED A.TAEFI 03.02.18 A.R.W.A SIGNALING LIST OMRANI 4 ZONE
1 A.TAEFI A.HASANI 12.03.18 DUE TO ANACO COMMENTS DRAWN A.TAEFI 03.02.18 ARDABIL REGIONAL WATER AUTHORITY 132/20 KV SUBSTATION SH.NO.

CHECKED F.GHAZI 03.02.18 CONSULTING ENGINEERS: DWG. NO. 6202


FULMEN REF.: APPROVED A.HASANI 03.02.18 ANACO 20KV BUS COUPLER GE30OMR=ZOOG CONT.

E/2344 STANDARD: - CONTRACT NO.: - 6300


PROTECTION DC
OC,E/F TRIP FAIL/RELAYS
FAULTY

SENSITIVE E/F TRIP A/R OPERATED

CB SPRING CHARGE A/R


FAIL UNSUCCESSFUL

CB MOTOR SUPPLY LOCK OUT RELAY


FAIL OPERATED

T.C.S RELAY URGENT


SPARE
OPERATED
NON URGENT

BLANK

REV DRAWN APPR. DATE MODIFICATION BY AT TITLE: TITLE:

0 A.TAEFI A.HASANI 03.02.18 ORIGINAL ISSUE DESIGNED A.TAEFI 03.02.18 A.R.W.A SIGNALING LIST OMRANI 4 ZONE
1 A.TAEFI A.HASANI 12.03.18 DUE TO ANACO COMMENTS DRAWN A.TAEFI 03.02.18 ARDABIL REGIONAL WATER AUTHORITY 132/20 KV SUBSTATION SH.NO.

CHECKED F.GHAZI 03.02.18 CONSULTING ENGINEERS: ALARM WINDOWS DWG. NO. 6300
FULMEN REF.: APPROVED A.HASANI 03.02.18 ANACO 20KV OUTGOING GE30OMR=ZOOG CONT.

E/2344 STANDARD: - CONTRACT NO.: - 6301


ANNOUNC. SCADA IND. LAMP
No. DESCRIPTION(SOURCE PANEL) E.R F.R REMARK
N.URG. URG. IND. ALARM CONT. LOCATION COLOR

1
2 O/C , E/F TRIP (+R) X X X X
3
4 SENSITIVE E/F TRIP (+R) X X X X
5
6 CB SPRING CHARGE FAIL (+SWG) X X X
7
8
9
10
11 AUTO RECLOSER IN PROGRESS (+R) X X +W Y
12
13
14 CB MOTOR SUPPLY FAIL (+SWG) X X X
15 T.C.S RELAY OPERATED (+R) X X X
16
17 PROTECTION DC FAIL/RELAY FAULTY (+R) X X X
18
19 CB-QA2 OPEN POS (+W) X
20 CB-QA2 CLOSE POS (+W) X
21
22 ES-QC9 OPEN POS (+W) X
23 ES-QC9 CLOSE POS (+W) X
24
25
26 C.B-QA2 IN LOCAL (+W) X
27 C.B-QA2 LOCKOUT RESET FROM SCADA (+YV) X TO(+R)
28
29
30
31 CB-QA2 CLOSE COMMAND (+YV) X TO(+W)
32 CB-QA2 OPEN COMMAND FROM SCADA (+YV) X TO(+W)
33
34
35

REV DRAWN APPR. DATE MODIFICATION BY AT TITLE: TITLE:

0 A.TAEFI A.HASANI 03.02.18 ORIGINAL ISSUE DESIGNED A.TAEFI 03.02.18 A.R.W.A SIGNALING LIST OMRANI 4 ZONE
1 A.TAEFI A.HASANI 12.03.18 DUE TO ANACO COMMENTS DRAWN A.TAEFI 03.02.18 ARDABIL REGIONAL WATER AUTHORITY 132/20 KV SUBSTATION SH.NO.

CHECKED F.GHAZI 03.02.18 CONSULTING ENGINEERS: DWG. NO. 6301


FULMEN REF.: APPROVED A.HASANI 03.02.18 ANACO 20KV OUTGOING GE30OMR=ZOOG CONT.

E/2344 STANDARD: - CONTRACT NO.: - 6302


ANNOUNC. SCADA IND. LAMP
No. DESCRIPTION(SOURCE PANEL) E.R F.R REMARK
N.URG. URG. IND. ALARM CONT. LOCATION COLOR

36
37
38
39
40 A/R OPERATED(+R) X X X
41 A/R UNSUCCESSFUL(+R) X X X
42 A/R ON/OFF S.SW IN ON POSITION (+W) X X
43 A/R ON/OFF S.SW IN OFF POSITION (+W) X X
44
45
46 CB-QA2 IN SERVICE (+SWG) X X
47 CB-QA2 OUT OF SERVICE (+SWG) X X
48
49
50
51
52 LOCK OUT RELAY OPERATED (+R) X X X
53
54
55
56 CURRENT PH.A (+R) X
57 CURRENT PH.B (+R) X
58 CURRENT PH.C (+R) X
59 NEUTRAL CURRENT (+R) X
60
61
62
63
64
65
66
67
68
69
70

REV DRAWN APPR. DATE MODIFICATION BY AT TITLE: TITLE:

0 A.TAEFI A.HASANI 03.02.18 ORIGINAL ISSUE DESIGNED A.TAEFI 03.02.18 A.R.W.A SIGNALING LIST OMRANI 4 ZONE
1 A.TAEFI A.HASANI 12.03.18 DUE TO ANACO COMMENTS DRAWN A.TAEFI 03.02.18 ARDABIL REGIONAL WATER AUTHORITY 132/20 KV SUBSTATION SH.NO.

CHECKED F.GHAZI 03.02.18 CONSULTING ENGINEERS: DWG. NO. 6302


FULMEN REF.: APPROVED A.HASANI 03.02.18 ANACO 20KV OUTGOING GE30OMR=ZOOG CONT.

E/2344 STANDARD: - CONTRACT NO.: - 9900


110V DC BATTERY LOSS OF SYNCHRO
20KV SWITCHGEAR LVAC INCOMING
CHARGER FAILURE SUPPLY/SYNCHRO
AC SUPPLY FAILURE CBs TRIP
RELAY FAULTY

110V DC 110VDC
EVENT RECORDER ALARM DC SUPPLY
INCOMING PANEL VOLTAGE
TROUBLE FAIL
MCCB FAIL FAULT

OUTDOOR
48V DC BATTERY FAUL RECORDER INDOOR PANELS
PANELS AC
CHARGER FAILURE TROUBLE AC SUPPLY FAIL
SUPPLY FAIL

LVAC OUTGOING LVDC


48V DC INCOMING LVAC INCOMING UV
FEEDERS OUTGOING MCB
MCCB FAIL OPERATED
MCB/MCCB TRIP TRIP

URGENT
SDH TELECOM LVAC DC SUPPLY
SYSTEM FAULTY FAIL NON URGENT

BLACK

REV DRAWN APPR. DATE MODIFICATION BY AT TITLE: TITLE:

0 A.TAEFI A.HASANI 03.02.18 ORIGINAL ISSUE DESIGNED A.TAEFI 03.02.18 A.R.W.A SIGNALING LIST OMRANI 4 ZONE
1 A.TAEFI A.HASANI 12.03.18 DUE TO ANACO COMMENTS DRAWN A.TAEFI 03.02.18 ARDABIL REGIONAL WATER AUTHORITY 132/20 KV SUBSTATION SH.NO.

CHECKED F.GHAZI 03.02.18 CONSULTING ENGINEERS: ALARM WINDOWS DWG. NO. 9900
FULMEN REF.: APPROVED A.HASANI 03.02.18 ANACO GENERAL / COMMON GE30OMR=ZOOG CONT.

E/2344 STANDARD: - CONTRACT NO.: - 9901


ANNOUNC. SCADA IND. LAMP
No. DESCRIPTION(SOURCE PANEL) E.R F.R REMARK
N.URG. URG. IND. ALARM CONT. LOCATION COLOR

1
2 110V DC BATTERY CHARGER FAILURE (+NK) X X X X
3
4
5
6
7 110V DC INCOMING MCCB FAIL (+NK) X X X X
8
9
10 48V DC BATTERY CHARGER FAILURE (+NQ) X X X X
11
12
13
14
15 48V DC INCOMING MCCB FAIL (+NQ) X X X X
16
17
18
19
20
21 FIRE DETECTION ALARM (FIRE ALARM PANEL)
22 FIRE FIGHTING ALARM (FIRE ALARM PANEL)
23 FIRE ALARM (FIRE ALARM PANEL) X X
24
25 SDH TELECOM SYSTEM FAULTY (+SDH) X X X
26
27
28
29 AC SUPPLY OF SWITCHGEAR FAULTY (+SWG)
30 AC ALARM SUPERVISION VOLTAGE FAULTY (+SWG)
31 20 KV SWITCHGEAR AC SUPPLY FAILURE (+SWG) X X X
32
33
34
35

REV DRAWN APPR. DATE MODIFICATION BY AT TITLE: TITLE:

0 A.TAEFI A.HASANI 03.02.18 ORIGINAL ISSUE DESIGNED A.TAEFI 03.02.18 A.R.W.A SIGNALING LIST OMRANI 4 ZONE
1 A.TAEFI A.HASANI 12.03.18 DUE TO ANACO COMMENTS DRAWN A.TAEFI 03.02.18 ARDABIL REGIONAL WATER AUTHORITY 132/20 KV SUBSTATION SH.NO.

CHECKED F.GHAZI 03.02.18 CONSULTING ENGINEERS: DWG. NO. 9901


FULMEN REF.: APPROVED A.HASANI 03.02.18 ANACO GENERAL / COMMON GE30OMR=ZOOG CONT.

E/2344 STANDARD: - CONTRACT NO.: - 9902


ANNOUNC. SCADA IND. LAMP
No. DESCRIPTION(SOURCE PANEL) E.R F.R REMARK
N.URG. URG. IND. ALARM CONT. LOCATION COLOR

36
37 110VDC PANEL VOLTAGE FAULT X X X
38
39
40 EVENT RECORDER TROUBLE (+XP21) X X X
41
42 FAUL RECORDER TROUBLE (+XP11) X X X
43
44
45 LVAC INCOMMING 1 U/V OPERATED (+NE)
46 LVAC INCOMMING 2 U/V OPERATED (+NE)
47 LVAC INCOMMING UV OPERATED (+NE) X X X
48
49 LOSS OF CONTROL SUPPLY-CBs (+NE)
50 LOSS OF MOTOR SUPPLY-CBs (+NE)
51 LVAC DC SUPPLY FAIL (+NE) X X X
52
53
54 LVAC INCOMMING CB-Q01 TRIP (+NE)
55 LVAC INCOMMING CB-Q02 TRIP (+NE)
56 LVAC INCOMMING CB-Q03 TRIP (+NE)
57 LVAC INCOMMING CBs TRIP (+NE) X X X
58
59 ALARM DC SUPPLY FAIL +W) X X X
60
61 INDOOR PANELS AC SUPPLY FAIL (+R) X X X
62 OUTDOOR PANELS AC SUPPLY FAIL (+R) X X X
63
64
65 LVAC OUTGOING FEEDRES MCB/MCCB TRIP (+R) X X X
66
67 LVDC OUTGOING MCB TRIP (+R) X X X
68
69
70 LOSS OF SYNCH SUPPLY/SYNCH. RELAY FAULTY (+W) X X X

REV DRAWN APPR. DATE MODIFICATION BY AT TITLE: TITLE:

0 A.TAEFI A.HASANI 03.02.18 ORIGINAL ISSUE DESIGNED A.TAEFI 03.02.18 A.R.W.A SIGNALING LIST OMRANI 4 ZONE
1 A.TAEFI A.HASANI 12.03.18 DUE TO ANACO COMMENTS DRAWN A.TAEFI 03.02.18 ARDABIL REGIONAL WATER AUTHORITY 132/20 KV SUBSTATION SH.NO.

CHECKED F.GHAZI 03.02.18 CONSULTING ENGINEERS: DWG. NO. 9902


FULMEN REF.: APPROVED A.HASANI 03.02.18 ANACO GENERAL / COMMON GE30OMR=ZOOG CONT.

E/2344 STANDARD: - CONTRACT NO.: - 9903


ANNOUNC. SCADA IND. LAMP
No. DESCRIPTION(SOURCE PANEL) E.R F.R REMARK
N.URG. URG. IND. ALARM CONT. LOCATION COLOR

71
72
73 LVDC CB/Q1 OPEN POS (+NK) X
74 LVDC CB/Q1 CLOSE POS (+NK) X
75
76 LVAC CB/Q01 OPEN POS (+NE) X
77 LVAC CB/Q01 CLOSE POS (+NE) X
78
79 LVAC CB/Q02 OPEN POS (+NE) X
80 LVAC CB/Q02 CLOSE POS (+NE) X
81
82 LVAC CB/Q03 OPEN POS (+NE) X
83 LVAC CB/Q03 CLOSE POS (+NE) X
84
85 SYNCHRONIZER SELECTOR SWITCH IN ON POSSITION (+W) X
86 SYNCHRONIZER SELECTOR SWITCH IN MANUAL POSITION (+W) X
87 SYNCHRONIZER SELECTOR SWITCH IN BYPASS POSSITION (+W) X
88
89
90
91 SYNCHRONIZER SELECTOR SWITCH ON COMMAND FROM SCADA (+YV) X TO(+W)
92 SYNCHRONIZER SELECTOR SWITCH OFF COMMAND FROM SCADA (+YV) X TO(+W)
93
94
95
96 LVAC AUTO/MANUAL SELECTOR SWITCH IN AUTO POSITION X
97 LVAC AUTO/MANUAL SELECTOR SWITCH IN MANUAL POSITION X
98
99 LVAC PRIORITY SELECTOR SWITCH IN T1 POSITION X X
100 LVAC PRIORITY SELECTOR SWITCH IN T2 POSITION X X
101
102
103
104
105

REV DRAWN APPR. DATE MODIFICATION BY AT TITLE: TITLE:

0 A.TAEFI A.HASANI 03.02.18 ORIGINAL ISSUE DESIGNED A.TAEFI 03.02.18 A.R.W.A SIGNALING LIST OMRANI 4 ZONE
1 A.TAEFI A.HASANI 12.03.18 DUE TO ANACO COMMENTS DRAWN A.TAEFI 03.02.18 ARDABIL REGIONAL WATER AUTHORITY 132/20 KV SUBSTATION SH.NO.
CHECKED F.GHAZI 03.02.18 CONSULTING ENGINEERS: DWG. NO. 9903
FULMEN REF.: APPROVED A.HASANI 03.02.18 ANACO GENERAL / COMMON GE30OMR=ZOOG CONT.

E/2344 STANDARD: - CONTRACT NO.: - 9910


AVR1 BLOCKED AVR2RELAY AVR2 BLOCKED
AVR1 RELAY FAULTY
FAULTY

AVR1 DC SUPPLY AVR1 OC/UV/OV AVR2 DC SUPPLY AVR2 OC/UV/OV


FAIL DETECTION FAIL DETECTION

OLTC 1 MOTOR OLTC 2 MOTOR OLTC2 OUT OF


OLTC1 OUT OF STEP
SUPPLY FAIL SUPPLY FAIL STEP

AVR PANEL AC
SPARE SPARE SPARE
SUPPLY FAIL

URGENT NON URGENT BLANK

REV DRAWN APPR. DATE MODIFICATION BY AT CLIENT: TITLE:

0 A.TAEFI A.HASANI 03.02.18 ORIGINAL ISSUE DESIGNED A.TAEFI 03.02.18 A.R.W.A SIGNALING LIST OMRANI 4 ZONE
1 A.TAEFI A.HASANI 12.03.18 DUE TO ANACO COMMENTS DRAWN A.TAEFI 03.02.18 ARDABIL REGIONAL WATER AUTHORITY 132/20 KV SUBSTATION SH.NO.

CHECKED F.GHAZI 03.02.18 CONSULTING ENGINEERS: ALARM WINDOWS DWG. NO. 9910
FULMEN REF.: APPROVED A.HASANI 03.02.18 ANACO AVR GE30OMR=ZOOG CONT.

E/2344 STANDARD: - CONTRACT NO.: - 9911


ANNOUNC. SCADA IND. LAMP
No. DESCRIPTION(SOURCE PANEL) E.R F.R REMARK
N.URG. URG. IND. ALARM CONT. LOCATION COLOR

1 AVR1 RELAY FAULTY (+AVR) X X X


2 AVR2 RELAY FAULTY (+AVR) X X X
3
4 AVR1 BLOCKED (+AVR) X X X
5 AVR2 BLOCKED (+AVR) X X X
6
7 AVR1 DC SUPPLY FAIL (+AVR) X X X +AVR R
8 AVR2 DC SUPPLY FAIL (+AVR) X X X +AVR R
9
10 AVR1 OC/UV/OV DETECTION (+AVR) X X X
11 AVR2 OC/UV/OV DETECTION (+AVR) X X X
12
13 OLTC 1 MOTOR SUPPLY FAIL (+AVR) X X X
14 OLTC 2 MOTOR SUPPLY FAIL (+AVR) X X X
15
16 OLTC1 OUT OF STEP (+AVR) X X X
17 OLTC2 OUT OF STEP (+AVR) X X X
18
19 AVR PANEL AC SUPPLY FAIL (+AVR) X X X
20
21
22 OLTC1 IN PROGRESS (+AVR) X X +AVR Y
23 OLTC1 IN LOCAL CONTROL (+AVR) X X +AVR R
24
25
26 OLTC2 IN PROGRESS (+AVR) X X +AVR Y
27 OLTC2 IN LOCAL CONTROL (+AVR) X X +AVR R
28
29 AVR1 CONTROL IN AUTO MODE (+AVR) X X +AVR B
30 AVR1 CONTROL IN MANUAL MODE (+AVR) X X +AVR G
31
32
33

REV DRAWN APPR. DATE MODIFICATION BY AT CLIENT: TITLE:

0 A.TAEFI A.HASANI 03.02.18 ORIGINAL ISSUE DESIGNED M.HAMIDI 04.11.13 M.R.E.C SIGNALING LIST OMRANI 4 ZONE
1 A.TAEFI A.HASANI 12.03.18 DUE TO ANACO COMMENTS DRAWN M.HAMIDI 04.11.13 MAZANDARAN REGIONAL ELECTRIC CO. 132/20 KV SUBSTATION SH.NO.

CHECKED F.GHAZI 04.11.16 CONSULTING ENGINEERS: AVR DWG. NO. 9911


FULMEN REF.: APPROVED A.HASANI 04.11.16 TADBIR NIROO GE30OMR=ZOOG CONT.

E/2344 STANDARD: - CONTRACT NO.: - 9912


ANNOUNC. SCADA IND. LAMP
No. DESCRIPTION(SOURCE PANEL) E.R F.R REMARK
N.URG. URG. IND. ALARM CONT. LOCATION COLOR

34
35
36 AVR2 CONTROL IN AUTO MODE (+AVR) X X +AVR B
37 AVR2 CONTROL IN MANUAL MODE (+AVR) X X +AVR G
38
39
40 AVR OPERATION MODE IN INDIVIDUAL (+AVR) X X
41
42 AVR1 OPERATION MODE IN MASTER (+AVR) X X
43 AVR2 OPERATION MODE IN MASTER (+AVR) X X
44
45
46 RAISE COMMAND TO OLTC 1 FROM SCADA (+AVR) X X TO(+AVR)
47 LOWER COMMAND TO OLTC 1 FROM SCADA (+AVR) X X TO(+AVR)
48 OLTC1 EMERGENCY STOP FROM SCADA (+AVR) X X TO(+AVR)
49
50
51
52 RAISE COMMAND TO OLTC 2 SCADA (+AVR) X X TO(+AVR)
53 LOWER COMMAND TO OLTC 2 SCADA (+AVR) X X TO(+AVR)
54 OLTC2 EMERGENCY STOP SCADA (+AVR) X X TO(+AVR)
55
56
57
58
59
60
61
62
63
64
65
66
67

REV DRAWN APPR. DATE MODIFICATION BY AT CLIENT: TITLE:

0 A.TAEFI A.HASANI 03.02.18 ORIGINAL ISSUE DESIGNED M.HAMIDI 04.11.13 M.R.E.C SIGNALING LIST OMRANI 4 ZONE
1 A.TAEFI A.HASANI 12.03.18 DUE TO ANACO COMMENTS DRAWN M.HAMIDI 04.11.13 MAZANDARAN REGIONAL ELECTRIC CO. 132/20 KV SUBSTATION SH.NO.

CHECKED F.GHAZI 04.11.16 CONSULTING ENGINEERS: AVR DWG. NO. 9912


FULMEN REF.: APPROVED A.HASANI 04.11.16 TADBIR NIROO GE30OMR=ZOOG CONT.

E/2344 STANDARD: - CONTRACT NO.: - 9913


ANNOUNC. SCADA IND. LAMP
No. DESCRIPTION(SOURCE PANEL) E.R F.R REMARK
N.URG. URG. IND. ALARM CONT. LOCATION COLOR

68
69
70 AVR1 IN MASTER POSITION FROM SCADA X X
71 AVR1 IN SLAVE POSITION FROM SCADA X X
72
73
74 AVR2 IN MASTER POSITION FROM SCADA X X
75 AVR2 IN SLAVE POSITION FROM SCADA X X
76
77
78 AVR1 IN PARALLEL POSITION FROM SCADA X X
79 AVR1 IN INDIVITUAL POSITION FROM SCADA X X
80
81
82 AVR2 IN PARALLEL POSITION FROM SCADA X X
83 AVR2 IN INDIVITUAL POSITION FROM SCADA X X
84
85
86 AVR1 IN AUTO POSITION FROM SCADA X X
87 AVR1 IN MANUAL POSITION FROM SCADA X X
88
89
90 AVR2 IN AUTO POSITION FROM SCADA X X
91 AVR2 IN MANUAL POSITION FROM SCADA X X
92
93
94
95
96
97
98
99
100
101

REV DRAWN APPR. DATE MODIFICATION BY AT CLIENT: TITLE:

0 A.TAEFI A.HASANI 03.02.18 ORIGINAL ISSUE DESIGNED M.HAMIDI 04.11.13 M.R.E.C SIGNALING LIST OMRANI 4 ZONE
1 A.TAEFI A.HASANI 12.03.18 DUE TO ANACO COMMENTS DRAWN M.HAMIDI 04.11.13 MAZANDARAN REGIONAL ELECTRIC CO. 132/20 KV SUBSTATION SH.NO.

CHECKED F.GHAZI 04.11.16 CONSULTING ENGINEERS: AVR DWG. NO. 9913


FULMEN REF.: APPROVED A.HASANI 04.11.16 TADBIR NIROO GE30OMR=ZOOG CONT.

E/2344 STANDARD: - CONTRACT NO.: - - --