You are on page 1of 9

ESCON KEJURUTERAAN ESCON SDN. BHD.

(222506-M)

FINAL REPORT

RFET INSPECTION OF
UNIT 1E-E1426
AT
MALAYSIA LNG SDN.BHD.

2nd & 12th AUGUST 2015

Report Reference : KESB/MLNG/1E-E1426/FR/15


Date : 28th AUGUST 2015

REPORT PREPARED BY: M.SYAFIQ AZFAR


REPORT REVIEWED BY: K.S. VIVEKANAND

SIGNATURE :

1E-E1426 Leakage Steam Condenser Final Report Page i


ESCON KEJURUTERAAN ESCON SDN. BHD.
(222506-M)

1.0 UNIT / INSPECTION DETAILS

Organization : Malaysia LNG Sdn. Bhd.

Plant : Module 1

Unit : 1E-E1426 Leakage Steam Condenser

Orientation : Horizontal

Tube Material : SA179

Tube Details : 19.05 mm O.D /2.03 mm W. Thk / 1434 mm L

Total Tubes : 182 Tubes

Tubes Inspected : 182 Tubes

Inspection Period : 2 & 12 August 2015

Inspection Technique : Remote Field Electromagnetic Technique

Equipment : Eddyfi Ectane Series

Probe : 13mm Dia.

Row 1 E1446
Scanning Direction

E1437A
1E-E1426

Row 14

Numbering Direction

1E-E1426 Leakage Steam Condenser Final Report Page ii


ESCON KEJURUTERAAN ESCON SDN. BHD.
(222506-M)

2.0 INSPECTION RESULTS

All the 182 tubes present in the unit # 1E-E1426 were inspected.

1. Severe localized wall thinning/pitting corrosion was observed in most of the tubes inspected
especially on the top rows of the unit resulting in >60% wall loss. The wall thinning was
predominantly observed between the far end side tube sheet (far end of inspection) and the
first baffle from the far end. RFET cannot distinguish between the ID & OD side defects.

2. Some tubes had scale/deposits hampering the probe movement and hence the signal quality,
but the analysis has been done with the best of our abilities under such scenarios.

3. RFET is insensitive in picking up the small diameter pits (≤4.5mm) and defects under the
baffle plates, only large areas of corrosion (if present) can be detected.

4. The summary of findings of the tubes inspected is presented in Table 1, followed by a


pictorial representation of the tube sheet diagram.

1E-E1426 Leakage Steam Condenser Final Report Page iii


ESCON KEJURUTERAAN ESCON SDN. BHD.
(222506-M)

Table 1: Summary of findings of RFET inspection on 1E-E1426

1E-E1426 Leakage Steam Condenser Final Report Page iv


ESCON KEJURUTERAAN ESCON SDN. BHD.
(222506-M)

Table 1: Summary of findings of RFET inspection on 1E-E1426

1E-E1426 Leakage Steam Condenser Final Report Page v


ESCON KEJURUTERAAN ESCON SDN. BHD.
(222506-M)

RFET inspection on 1E-E1426

1E-E1426 Leakage Steam Condenser Final Report Page vi


ESCON KEJURUTERAAN ESCON SDN. BHD.
(222506-M)

3.0 SELECTED WAVEFORMS

Row 1 – Tube 4

Row 1 Tube 4 exhibited localized wall thinning in the region marked above resulting in > 60%
wall loss.

1E-E1426 Leakage Steam Condenser Final Report Page vii


ESCON KEJURUTERAAN ESCON SDN. BHD.
(222506-M)

3.0 SELECTED WAVEFORMS

Row 2 – Tube 1

Row 2 Tube 1 exhibited localized wall thinning in the region marked above resulting in 51-60%
wall loss.

1E-E1426 Leakage Steam Condenser Final Report Page viii


ESCON KEJURUTERAAN ESCON SDN. BHD.
(222506-M)

3.0 SELECTED WAVEFORMS

Row 3 – Tube 5

Row 3 Tube 5 exhibited localized wall thinning in the region marked above resulting in 41-50%
wall loss.

1E-E1426 Leakage Steam Condenser Final Report Page ix