KCEI / CAR / 01
Rev. No. 1
G8D No.
Supplier ACE
Problem
D5 Corrective Action(s)
(Select Permanent Corrective Action plan)
Verification--> What evidence do you have that this will resolve the problem at the
root-cause level?
Sl. No. Corrective Action Plan Resp. Target Dt.
1 Fixture made to control block taper welding QA 17-Nov-17
Poka-Yoke
Drawing
PPAP
Horizontal Deployment
Work instruction
Periodic audit is carried out to check the given solution/Corrective action is effective.
Supplier ACE
1)Wrong Color top coat , Observed Blue Green, Required One coat enamel black
Problem
D5 Corrective Action(s)
(Select Permanent Corrective Action plan)
Verification--> What evidence do you have that this will resolve the problem at the
root-cause level?
Sl. No. Corrective Action Plan Resp. Target Dt.
Parts Colour shade displayed @ workstation with colour print outs .Same Point added in
2 Mahesh 28-Oct-17
PDI
D6 Implement & Validate Best Permanent Corrective Action Plan
Develop an action plan for implementation. Discontinue the interim containment action
Sl. No. Corrective Action Implementation Resp. Target Dt.
Control Plan
Poka-Yoke
Drawing
PPAP
Horizontal Deployment
Work instruction Mahesh 28-Oct-17
Periodic audit is carried out to check the given solution/Corrective action is effective.
Supplier ACE
Problem
Root
Cause
Escape
Point
Escape
Point
D5 Corrective Action(s)
(Select Permanent Corrective Action plan)
Verification--> What evidence do you have that this will resolve the problem at the
root-cause level?
Sl. No. Corrective Action Plan Resp. Target Dt.
PFMEA
Control Plan
Poka-Yoke
Drawing
PPAP
Horizontal Deployment
Work instruction
Periodic audit is carried out to check the given solution/Corrective action is effective.
Supplier ACE
Problem
Root
Cause
D5 Corrective Action(s)
(Select Permanent Corrective Action plan)
Verification--> What evidence do you have that this will resolve the problem at the
root-cause level?
Sl. No. Corrective Action Plan Resp. Target Dt.
1 Nut Socket with Threaded Head Implemented Qa 26-Oct-17
1 Given instruction to the operators to use threaded Sockets for All types of Nuts QA 26-Oct-17
PFMEA
Control Plan
Poka-Yoke
Drawing
PPAP
Horizontal Deployment
Periodic audit is carried out to check the given solution/Corrective action is effective.
Supplier ACE
Problem
Root
Cause
D5 Corrective Action(s)
(Select Permanent Corrective Action plan)
Verification--> What evidence do you have that this will resolve the problem at the
root-cause level?
Sl. No. Corrective Action Plan Resp. Target Dt.
Implemented Rubber Plugs to nuts during painting proces & Implemented 100% tapping
Mahesh 16-Nov-17
for All Painted Parts
1 Work instruction provided to the operators to use the Plugs to cover the Nuts Mahesh 16-Nov-17
PFMEA
Control Plan
Poka-Yoke
Drawing
PPAP
Horizontal Deployment
Periodic audit is carried out to check the given solution/Corrective action is effective.
Supplier ACE
Problem
D5 Corrective Action(s)
(Select Permanent Corrective Action plan)
Verification--> What evidence do you have that this will resolve the problem at the
root-cause level?
Sl. No. Corrective Action Plan Resp. Target Dt.
To Avoid the reverse orientation Implemented Engraving Mark on the part to identifiy
1 bending orientation. QA 18-Nov-17
Setup approval Updated.
Poka-Yoke
Drawing
PPAP
Horizontal Deployment
Work instruction
Periodic audit is carried out to check the given solution/Corrective action is effective.
Supplier ACE
Nut not Enter in stud M10X1.5, Poor entry chamfer, thread Damage
Problem
Transit damage
Root
Cause
Escape
Point
D5 Corrective Action(s)
(Select Permanent Corrective Action plan)
Verification--> What evidence do you have that this will resolve the problem at the
root-cause level?
Sl. No. Corrective Action Plan Resp. Target Dt.
1 To over come this Issue Implemented Nut /tightened the nut on the Bolt. QA 28.11.2017
Poka-Yoke
Drawing
PPAP
Horizontal Deployment
Work instruction
Periodic audit is carried out to check the given solution/Corrective action is effective.