CB(4)15/2023(02)
Panel on Transport
List of follow-up actions
(position as at 16 January 2023)
2. Replacement of the 25 November 2022 The Administration was requested to provide Response is awaited.
traffic signal controllers more detailed information on the following:
and ancillary equipment (a) how the features and functions of the
of Hong Kong Area traffic signal controllers replacement
Traffic Control System project form the basis for the
implementation of the smart traffic
management system;
(b) cost effectiveness of the new
equipment; and
(c) savings in repair and maintenance.
- 2 -
Date of meeting Latest position/
Subject Follow-up action required Administration's
response
3. 6891TH-1 Tsing Yi- 6 December 2022 The Administration was requested to provide Response is awaited.
Lantau Link – the following information:
Investigation and
Detailed Design (a) a list of consultants who have been
engaged from 2018 to end of 2022 to carry
out studies on public projects, including
891TH-1 Tsing Yi-Lantau Link; and