The Caticlan Airport Development Project aims to upgrade Caticlan Airport through a Php 2.506 billion budget to improve facilities, extend the runway, and reduce nearby slopes. Phase 1A is complete, providing an improved terminal and facilities, while Phase 1B and 2 are currently 54.19% complete, working to extend the runway further and construct a new terminal building and landslide prevention facilities.
The Caticlan Airport Development Project aims to upgrade Caticlan Airport through a Php 2.506 billion budget to improve facilities, extend the runway, and reduce nearby slopes. Phase 1A is complete, providing an improved terminal and facilities, while Phase 1B and 2 are currently 54.19% complete, working to extend the runway further and construct a new terminal building and landslide prevention facilities.
The Caticlan Airport Development Project aims to upgrade Caticlan Airport through a Php 2.506 billion budget to improve facilities, extend the runway, and reduce nearby slopes. Phase 1A is complete, providing an improved terminal and facilities, while Phase 1B and 2 are currently 54.19% complete, working to extend the runway further and construct a new terminal building and landslide prevention facilities.
Summary Cost of the Amount In Details of the Project
Project Total Budget of the Php.2.506 Billion Implementing Agency Project Civil Aviation Authority of the Philippines (CAAP) Total Cost of the Project Php.1.35 Billion Status of the Project As of October 2021, construction still stands 54.19% complete. Procurement Mode Unsolicited
Phases of the Project
Phase 1A
1. Improvement/ upgrading of existing terminal
2. Upgrading of airport facilities
3. Reducing slope of adjacent hill to 4 degrees
Phase 1B
1. Extension of the runway to 1.95 km
2. Construction of landslide facilities to include new terminal building
3. Installation of navigational and air traffic control aids