RAMS Evaluation Sheet

Project Name DX3.1 DATA CENTRE, DUBAI Project No DX3.1


Activity Duct Installation
Subcontractor OHL CONTRACTING LLC Anticipated start date 01/02/2023
Document Number M1544-MCL-OHL-MSS-0001 Issue/Revision number P00

Status Comment

A Accepted

B Approved with Comments. Please incorporate comments and resend.

C Not accepted for implementation. Resubmission required.


Please note – ALL comments MUST be incorporated within the RAMS before it will be accepted for implementation.
Once Status A achieved, it does not relieve the contractor of their contractual and legal obligations or ownership of
the RAMS.

Signatories Name Signature Date


PROJECTS MANAGER
Gamal El Sayed 26-01-2023
OHL

For MCL Use ONLY

Appraisal Signatories Name Signature Date


Project Manager Vivek AllenQuadros
Site Manager Edwin Rebello
MEP Manager Rob Heard
HSE Officer Sukhjinder Singh
QA/QC Engineer Lester Ramos 
Others

The RAMS documentation submitted by the subcontractor should include the following
RISK ASSESSMENTS Yes No PERSONAL PROTECTIVE EQUIPMENT Yes No
COSHH Yes No EMERGENCY ARRANGEMENTS Yes No
FULL DESCRIPTION OF METHODOLOGY AND MATERIALS, WASTE REMOVAL
Yes No Yes No
SEQUENCE OF WORK HOUSEKEEPING AND STORAGE
ACCESS / EGRESS Yes No ENVIRONMENTAL Yes No
OCCUPATIONAL HEALTH Yes No LOGISTICS Yes No
WORK AT HEIGHT Yes No TECHNICAL INFORMATION Yes No
COMMUNICATION/MANAGEMENT/
PLANT / EQUIPMENT/TOOLS Yes No Yes No
TRAINING
PERMITS Yes No Yes No
Please note – referring to the RAMS Pro Forma (SAF 072) will assist in what information is needed

SAF009 (UAE) 08/20 Rev E Page 1 of 2 RAMS EVALUATION SHEET


Comments Initials

Continuation Sheets Used Yes No

SAF009 (UAE) 08/20 Rev E Page 2 of 2 RAMS EVALUATION SHEET