PT DSSP POWER SUMSEL

REPORT
Document :
MAIN POWER HOUSE UPS, 220VDC CHARGER AND FEEDER PANEL INSPECTION
Doc. No : Functional Location :
DSSP-S05-ELE-PM-0011 Sumsel-5

Revision : SAP Maintenance Order (MO) No :


02

Unit : #2 Date : Type : Monthly Preventive Maintenance

Panel Designation KKS Code Recorded Voltage (Volt) Recorded Ampere Remark
No System
(Amps)

1 UPS AC Bypass Panel BRA01

2 UPS AC Main Panel BRA02

3 UPS AC Distribution Panel BRA03

4 220VDC System DC Charger Panel No.1 BTL01

5 220VDC System DC Charger Panel No.2 BTL02

6 220VDC System DC Feeder Panel No.1 BUA01

7 220VDC System DC Connecting Bus Panel BUA02

8 220VDC System DC Feeder Panel No.2 BUA03


Comment :

Inspected by : Reviewed by : Approved by :


NOPEMBER 2021
No START FINISH THOTAL AREA REASON
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23 17:00 3:00 2 gen 1 liw 1x/GEN phase T low T
24 17:00 24:00:00 7 gen 1 trip gen u1,low rest.phase T
25
26 17:00 22:00 5 SB B5 U1 Brg mtr damage of u1
27
28
29
30
31
01/01/2022/MR RS[OT}
DATE START FINISH THOTAL AREA REMARK
1 ANNUAL LEAVE
2 ANNUAL LEAVE
3 ANNUAL LEAVE
4 ANNUAL LEAVE
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19 PERUNDINGAN PKB
20 PERUNDINGAN PKB
21 PERUNDINGAN PKB
22
23
24
25
26 17:00 20:00 3 U1 Rubber ball changed brg mtor 1A
27
28
29
30
31