Management Walkdown at All Area 12 January 2023 Electrical
Management Walkdown at All Area 12 January 2023 Electrical
Date : 12-Jan-23
Participants : 1. Awaluddin L. (Management) 6. Jaenudin A ( Production ) 11. Eko Susanto ( CHS) 16. M. Hafizh Alkautsar (HSE)
2. Chong Chee Shang. (Head. Plant) 7. Erwin yuliandri( Technical ) 12. Reza Zulfahmi (I&C)
3. Budy Kurniawan (DDPI) 8. Charles R. (Procurement) 13. Agus H (Technical)
4. M. Irvan S. (HSE) 9. Avic K. (Production) 14. Hadi W (BOP)
5. Mangasih (CHS&HE) 10. Andri Y (HRGA) 15. Ade. A ( Electrical )
Picture Target
No Date / Time Description Specific location Action Plan PIC Status
Before After
The building is
16 12-Jan-23 Fuel Station Need cleaning Warehouse 31-Jan-23
overgrown with grass
29 12-Jan-23 the tree almost died Pre-Treatment Area Do treatment for the tree HSE 31-Jan-23
Beside workshop
34 12-Jan-23 Out of place materials Move it into place Warehouse 31-Jan-23
maintenance
35 12-Jan-23 Pile of rubbish PAC & PAM Do house keeping BOP 31-Jan-23
39 12-Jan-23 Sign "STOP" is broken Road admin Building Need repair HSE 31-Jan-23
49 12-Jan-23 The ditch is dirty Main Gate Do House Keeping HRGA 31-Jan-23
50 12-Jan-23 Grass inside ditch Security Post 1 Do House Keeping GA 31-Jan-23
51 12-Jan-23 Pile of bamboo Behind of security post Do House Keeping HRGA 31-Jan-23
54 12-Jan-23 Broken plant pot Canteen Replace with new pot HRGA 31-Jan-23
56 12-Jan-23 Hydrant box is broken Paddle feeder Repair the hydrant box HSE 31-Jan-23