During Neeru-Chettu, review meeting by the District Collector, West Godavari District in his chamber on
14.11.2018. The Collector have instructed the Superintending Engineer, Irrigation Circle, Eluru to submit the
estimates of the essential structural repairs of the sluices, weirs and breach closings etc., pertaining to the
P.R tanks in the district, inorder to conserve the water in the P.R tanks. The list of essential structural
repairs of the sluices, weirs and breach closings etc., tanks in P.R tanks were verified and communicated
by the PD, DWMA to the Superintending Engineer, Irrigation Circle, Eluru on 15.11.2018 for the purpose of
preparation of estimates. Hence, the estimates for carrying out essential structural repairs of the sluices,
weirs and breach closings etc., tanks in P.R tanks are now proposed under the “Neeru-Chettu“ Programme
with the following provisions.
1 Excavation for Structures- Earth work in excavation in all kinds of soils of foundation of structures
2 Filling foundation wells with sand in layers of 25 to 30 cm
3 Providing and laying insitu vibrated M-15 using 40 mm down aggregates for Foundation
4 Providing and laying insitu vibrated M-15 using 20 mm down aggregates for Sub/Super Structure
5 Providing and laying insitu vibrated M-20 using 20 mm down aggregates for Wearing Coat
6 Manufacture, Supply and Delivery of R.C.C Socket and Spigot pipes
7 Laying and jointing 300 mm dia. NP- 2 class or IRC standard hume pipes in CM 1 : 2
Other LS provisions made in the estimate:
8 Provision for GST @ 12.00 %
9 Provision for Labour CESS @ 1%
10 Provisionfor NAC @ 0.1%
11 Provision towards Seigniorage charges as per statement enclosed
12 Provision towards shuttering arrangements
13 Provision towards photographic charges
14 Provision towards rounding off
The Estimate is prepared based on the current standard schedule rates of 2018-19.Therefore, the Estimate
for according Administrative sanction is now submitted to the Executive Engineer, Irrigation Division, Eluru.
Lakhs
hume pipes in CM 1 : 2
er Executive Engineer
Irrigation Division, Eluru
Check slip Accompanying Neeru CHETTU Estimate
a Neeru-Chettu/MGNRGSW/others
1 KM
r filling
Executive Engineer
Irrigation Division, Eluru
Page 9 Gen abs
GENERAL ABSTRACT
NEERU-CHETTU, Improvements to Dirusula Gunta Tank of Unguturu Village in Unguturu Mandal of W
Godavari District
Da
Sl.
ta Description Unit Rate S/w or Total Qty
No OT
no CD
1 2 3 4 5 6 7 9
Excavation for Structures- Earth work in
excavation in all kinds of soils of foundation
of structures as per drawing and technical
specification, including setting out,
CCDW-1-2
435777208.xlsx
Page 10 Gen abs
Total
8 Provision towards GST charges @ 12%
9 Provision towards labour cess @ 1%
10 Provision towards NAC @ 0.1%
11 Provision towards Seigniorage charges as per statement enclosed
12 Provision towards shuttering arrangements
13 Provision towards photographic charges
14 Provision towards rounding off
Grand Total
or say Rs Lakhs
435777208.xlsx
Page 11 Gen abs
GENERAL ABSTRACT
sula Gunta Tank of Unguturu Village in Unguturu Mandal of West
Godavari District
Amt
10
28126
87075
1150609
867278
435777208.xlsx
Page 12 Gen abs
153082
2286170
274340
22862
2286
46419
0
10000
7923
2650000
26.50
Executive Engineer
Irrigation Division
435777208.xlsx
DETAILED ESTIMATE
ITEM Measurements
S.NO COD DESCRIPTION OF ITEM NO
E Length Breadth
1 X 1 2.85 (0.3+2.2/2)
1 X 1 5.00 2.50
Total
Laying and jointing 300 mm dia. NP- 2
class or IRC standard hume pipes in CM
1 : 2 proportion by volume including cost of
all materials ( excluding pipes and collars ),
IRR-CCDW-6-1
1 X 1 4.00
Total
Measurements
Contents
Depth
3.00 29.16
1.50 7.29
3.65 28.18
1.50 14.96
Total 79.59
Say 0.00
0.30 2.92
0.30 1.46
0.30 2.32
0.30 2.99
Total 9.69
Say 0.00
0.45 4.37
0.45 2.19
0.20 1.54
0.45 4.49
Total 12.59
Say 0.00
3.00 8.10
3.00 4.86
1.50 2.36
(0.50+2.4/2) 2.45
0.45 2.77
0.08 -1.00
Total 19.54
Say 0.00
0.10 0.36
Say 0.00
12.50
0.00
4.00
0.00
Executive Engineer
Irrigation Division
ELURU
Page 19 det sweir
DETAILED ESTIMATE.SURPLUS WEIR
NEERU-CHETTU, Improvements to Dirusula Gunta Tank of Unguturu Village in Unguturu Mandal of Wes
District
Sl.
Data
No Description Unit No L B
No
.
1 2 3 4 5 6 7
Excavation for Structures- Earth work in excavation in
IRR-CCDW-1-2
435777208.xlsx
Page 20 det sweir
Providing and laying insitu vibrated M-15 ( 28 days
cube compressive strength not less than 15 N /sq mm )
grade cement concrete using 40 mm down size
approved, clean, hard, graded aggregates for
IRR-CCDW-2-3 foundation filling including cost of all materials,
machinery, labour, formwork, cleaning, batching,
mixing, placing in position, levelling, vibrating, finishing,
3 Cum
curing etc., complete with initial lead upto 50 m and all
lifts. (Cement content: 260 kg / cum with use of super
plasticiser(0.4% by wt. of cement),CA : 0.90cum,
Blending Ratio of CA--50:30:20, FA : 0.40 cum)
435777208.xlsx
Page 21 det sweir
Providing and laying insitu vibrated M-15 ( 28 days
cube compressive strength not less than 15 N / sq
mm ) grade cement concrete using 20 mm down size
IRR-CCDW-2-10
approved, clean, hard, graded aggregates for sub-
structure / super- structure works including cost of all
4 materials, machinery, labour, formwork, scaffolding, Cum
cleaning, batching, mixing, placing in position, levelling,
vibrating, finishing, curing etc., complete with initial
lead upto 50 m and all lifts.
435777208.xlsx
Page 22 det sweir
LED ESTIMATE.SURPLUS WEIR
a Gunta Tank of Unguturu Village in Unguturu Mandal of West Godavari
District
D Qty.
8 9
0.85 15.30
0.85 15.24
0.85 27.81
0.85 12.85
0.50 5.20
0.75 13.86
0.90 110.57
0.75 68.11
1.65 21.44
2.35 51.54
0.09
342.00
0.30 5.40
0.30 5.38
0.30 9.82
0.30 4.54
0.30 3.12
0.30 15.19
0.30 36.86
0.30 27.24
0.30 3.90
0.30 6.58
0.09
118.10
435777208.xlsx
Page 23 det sweir
0.55 9.90
0.55 9.86
0.55 18.00
0.55 8.32
0.55 5.72
0.25 12.66
0.50 92.14
0.25 41.18
1.35 17.54
2.05 44.96
0.03
260.30
435777208.xlsx
Page 24 det sweir
3.30 28.22
(3.3+3.6)/
29.21
2
(3.3+2.1)/
41.32
2
3.60 25.52
2.10 9.92
1.20 48.33
0.56 -2.53
0.01
180.00
0.10 18.43
0.10 16.47
0.10
35.00
Executive Engineer
Irrigation Division
ELURU
435777208.xlsx
Page 25 dim sweir
NEERU-CHETTU, Improvements to Dirusula Gunta Tank of Unguturu Village in Unguturu Mandal of West Godavari District
435777208.xlsx
Page 26 dim sweir
435777208.xlsx
NEERU-CHETTU, Improvements to Dirusula Gunta Tank of Unguturu Village in Unguturu Mand
NIL
B. Machinery:
Sl No Description Unit
C. Labour:
Sl No Description Unit
Abstract
a) Material
b) Machinery
c) Labour
Total
D. Add for contractor's profit and overheads on (A+B+C)
Total cost for 240.00
Rate per cum (A+B+C+D)/240.0
Net Amount after deducting Contractor's profit @ 13.615%
IRR-CAW-5-3-A Providing and laying sand blanket below embankment including cost of all
(New Item3- 2011--
12) materials, machinery, labour, spreading to specified thickness etc., complete with initial lead
upto 50 m and all lifts.
DATA RATE ANALYSIS
A. MATERIALS:
Sl No particulars Unit
B. MACHINERY:
Sl No Description Unit
1 Nil
C. LABOUR:
Sl No Description Unit
1 mazdoor Day
Total cost of Labour
labour component/unit qty
Add contractor's profit and overhead charges 13.615%
labour component/unit qty (including contractor's profit)
ABSTRACT:
A. Cost of Materials
B. Hire charges of Machinery
C. Cost of Labour
CONVEYANCE CHARGES
Sl No Particulars Unit
1 Sand for Filling cum
Conveyance R
Total Rate (Incud
Net Amount after deducting Contractor's profit @ 13.615%
IRR-CCDW-2-3 Providing and laying insitu vibrated M-15 ( 28 days cube compressive strength not less than
15 N /sq mm ) grade cement concrete using 40 mm down size approved, clean, hard, graded
aggregates for foundation filling including cost of all materials, machinery, labour, formwork,
cleaning, batching, mixing, placing in position, levelling, vibrating, finishing, curing etc.,
complete with initial lead upto 50 m and all lifts.
(Cement content: 260 kg / cum with use of super plasticiser(0.4% by wt. of cement),
CA : 0.90cum, Blending Ratio of CA--50:30:20, FA : 0.40 cum)
Data RATE ANALYSIS
A. MATERIALS:
Sl No Particulars Unit
1 Cement for mix kg
Cement for incidentals @ 3 kg / cum kg
2 Coarse aggregate 40-20 mm cum
Coarse aggregate 20-10 mm cum
Coarse aggregate 10 mm below cum
3 Fine aggregate (Un-Screened) cum
4 Super Plasticizer kg
5 Use rate of shuttering for 40 uses sqm
Scaffolding @ of shuttering 10%
6 Sundries LS
Total cost of Materials
B. MACHINERY:
Sl No Description Unit
C. LABOUR:
Sl No Description Unit
ABSTRACT:
A. Cost of Materials
B. Hire charges of Machinery
C. Cost of Labour
CONVEYANCE CHARGES
Sl No Particulars Unit
1 Coarse aggregate 40-20 mm cum
2 Coarse aggregate 20-10 mm cum
3 Coarse aggregate 10 mm below cum
4 Fine aggregate (Un-Screened) cum
Conveyance R
Total Rate (Incud
Net Amount after deducting Contractor's profit @ 13.615%
IRR-CCDW-2-10 Providing and laying insitu vibrated M-15 ( 28 days cube compressive strength not less than
15 N / sq mm ) grade cement concrete using 20 mm down size approved, clean, hard, graded
aggregates for sub-structure / super- structure works including cost of all materials,
machinery, labour, formwork, scaffolding, cleaning, batching, mixing, placing in position,
levelling, vibrating, finishing, curing etc., complete with initial lead upto 50 m and all lifts.
(Cement content: 280 kg / cum with use of super plasticiser(0.4% by wt. of cement),
CA : 0.80cum, Blending Ratio of CA--65:35, FA : 0.45 cum)
DATA: RATE ANALYSIS
A. MATERIALS:
Sl No Particulars Unit
B. MACHINERY:
Sl No Description Unit
C. LABOUR:
Sl No Description Unit
ABSTRACT:
A. Cost of Materials
B. Hire charges of Machinery
C. Cost of Labour
CONVEYANCE CHARGES
Sl No Particulars Unit
1 Coarse aggregate 20-10 mm cum
2 Coarse aggregate 10 mm below cum
3 Fine aggregate (Un-Screened) cum
IRR-CCDW-2-26 Providing and laying insitu M- 20 ( 28 days cube compressive strength not less than 20 N /
sqmm ) grade cement concrete using 20 mm down size approved, clean, hard, graded
aggregates for wearing coat including cost of all materials, machinery, labour, formwork,
cleaning, batching, mixing, placing in position in alternate panels, levelling, compacting,
finishing, curing, packing joints with asphalt mortar etc., complete with initial lead upto 50 m
and all lifts.
DATA: RATE ANALYSIS
A. MATERIALS:
Sl No Particulars Unit
B. MACHINERY:
Sl No Description Unit
C. LABOUR:
Sl No Description Unit
ABSTRACT:
A. Cost of Materials
B. Hire charges of Machinery
C. Cost of Labour
CONVEYANCE CHARGES
Sl No Particulars Unit
1 Coarse aggregate 20-10 mm cum
2 Coarse aggregate 10 mm below cum
3 Fine aggregate (Un-Screened) cum
IRR-CCDW-6-1 Laying and jointing 300 mm dia. NP- 2 class or IRC standard hume pipes in CM 1 : 2
proportion by volume including cost of all materials ( excluding pipes and collars ), machinery,
labour, aligning, packing joints with hemp, finishing, curing etc., complete with initial lead upto
50 m and all lifts.
(Cement content: 9.9 kg / joint, FA : 0.01cum/joint, Hemp Yarn : 0.091kg/joint)
DATA: RATE ANALYSIS
A. MATERIALS:
Sl No Particulars Unit
1 Cement kg
2 Sand (Screened) cum
3 Hemp yarn kg
Total cost of Materials
B. MACHINERY:
Sl No Description Unit
1 Nill
( Manual mixing )
Total hire charges of Machinery
C. LABOUR:
Sl No Description Unit
ABSTRACT:
A. Cost of Materials
B. Hire charges of Machinery
C. Cost of Labour
CONVEYANCE CHARGES
Sl No Particulars Unit
1 Sand (Screened) cum
Conveyance R
Total Rate (In
240.00 cum
Rs 0.00
Rs 15205.20
Rs 4904.40
Rs 20109.60
13.615% Rs: 2737.92
cum Rs: 22847.52
+D)/240.0 Rs. 95.20
Rs. 82.24
tial lead
Rs: 10000.00
Rs: 0.00
Rs: 8000.00
Total Rs: 18000.00
13.615% Rs: 2450.7
cum Rs: 20450.70
+D)/100 Rs. 204.50
t less than
rd, graded
mwork,
ment),
Rs: 36023.42
Rs: 2225.75
Rs: 19993.48
Total Rs: 58242.65
13.615% Rs: 7929.74
cum Rs: 66172.39
+D)/15.38 Rs. 4302.50
t less than
ard, graded
all lifts.
ment),
Rs: 41287.38
Rs: 2225.75
Rs: 22752.24
Total Rs: 66265.37
13.615% Rs: 9022.03
cum Rs: 75287.401954
+D)/15.71 Rs. 4792.30
n 20 N /
work,
pto 50 m
Rs: 37539.26
Rs: 1473.05
Rs: 20327.20
Total Rs: 59339.51
13.615% Rs: 8079.07
cum Rs: 67418.58
+D)/15.76 Rs. 4277.80
1:2
machinery,
lead upto
Rs: 458.03
Rs: 0.00
Rs: 2580.00
Total Rs: 3038.03
13.615% Rs: 413.63
Joints Rs: 3451.658
+D)/10.0 Rs. 345.20
Executive Engineer
Irrigation Division
ELURU
LEAD STATEMENT
NEERU-CHETTU, Improvements to Dirusula Gunta Tank of Unguturu Village in Unguturu Mandal of West Godavari District
SSR 2018-19
LEAD CHARGES
Total
Initial
lead
cost as Rate Rate per
S. Lead Total charges
Description of Material Source Unit per Upto 5 per Km 30 Amoun
No. in Amount lead (Without
basic Km Km 5 and t
km charges deductin
data to 30 above
g Initial
Lead)
Total
lead duly
deducting
initial lead
585.10
616.60
GENERAL ABSTRACT