Date : 27-Oct-22
Participants : 1. Wu Yanli (Management) 6. Bangun Pane ( I&C ) 11. Eko Susanto ( CHS) 16. M. Hafizh Alkautsar (HSE)
2. Awaluddin L. (Management) 7. Haris M.W ( Electrical ) 12. M. Fazlur Rahman (HSE)
3. Mulkan (Production) 8. Tang Yue Wei 13. Nopri (Translator)
4. M. Irvan S. (HSE) 9. Avic K. (Production) 14. Candra Turnip (I&C)
5. Agus. H. (Technical) 10. Sucipto (Mechanical) 15. Redam Pribadi ( HSE )
Picture Target
No Date / Time Description Specific location Action Plan PIC Status
Before After
8 5-Jan-23 The light was broken 5rd floor of boiler unit Replace with a new light Electrical 21-Jan-23 Done
Pile of clamp
16 5-Jan-23 5rd floor of boiler unit Do House Keeping Mechanical
scaffolding on the floor
22 5-Jan-23 pile of garbage on floor 1st floor of Turbine unit 1 Do House Keeping Mechanical
Gas cylinder was not Base Floor of Turbine Unit Tie the gas cylinder in
27 5-Jan-23 Mechanical Close
tied 1 the safe place
31 5-Jan-23 Nothing lighting 1,5 floor of Boiler unit 1 Replace With a new light Electrical 5-Jan-23 Done
32 5-Jan-23 Nothing lighting 1,5 floor of Boiler unit 1 Replace With a new light Electrical 5-Jan-23 Done
35 5-Jan-23 the greating is broken 1,5 floor of Boiler unit 1 repair of the greating Mechanical