DPM Safety Observation Report - 19.05.23
DPM Safety Observation Report - 19.05.23
18-05-2023
Location Boiler#2, 57 mtr. RHS rear side Dept/Agency BMD Date 18.05.2023
Description Permanent handrail installation work is done
BEFORE AFTER
Boiler u#1 11th floor front side handrailing installation work is done
BEFORE AFTER
Boiler u#1 11th floor front side handrailing installation work is done
BEFORE AFTER
Boiler u#1 11th floor front side handrailing installation work is done
BEFORE AFTER
Boiler u#1 10th floor handrailing installing work is done
BEFORE AFTER
Boiler u#1 10th floor handrailing installing work is done
BEFORE AFTER
Boiler U#1 10 th floor handrail installed
BEFORE AFTER
Boiler U#1 56 mtr handrail installed
BEFORE AFTER
Boiler U#1 56 mtr handrail installed
BEFORE AFTER
Boiler U#1 8th floor handrail installed
BEFORE AFTER
Boiler U#1 mill-e duct sheet remove
BEFORE AFTER
Boiler u#1 11th floor toe guard installed
BEFORE AFTER
Boiler u#1 air receiver tank gritting removing work is done
BEFORE AFTER
Boiler U#2 2nd floor scarp material remove
BEFORE AFTER
Boiler u#1 56 mtr handrailing installed
BEFORE AFTER
Boiler u#1 2nd floor handrailing installation work is done
BEFORE AFTER
Boiler u#1 4th floor gritting fixed
BEFORE AFTER
Boiler u#1 32 mtr insulation sheet removed
BEFORE AFTER
Location Boiler#2, 65 mtr. LHS Dept/Agency BMD Date 18.05.2023
Description Unwanted wooden material removing work is done
BEFORE AFTER
Location BOP/Workshop building Dept/Agency BMD Date 18.05.2023
Description Empty oil drum and other material needs to be removed from access of monkey type cage ladder.
Low potential (removed)
BEFORE AFTER
Oil drum removed from boiler u#1 near silo areas
BEFORE AFTER
Oil drum removed from near power chimney
BEFORE AFTER
Boiler u#1 2nd floor scaffolding material removing work is done
BEFORE AFTER
Boiler u#1 2nd floor rear side hanging insulation sheet removed
BEFORE AFTER