Concrete

Ticket Dosage Qte Slump Test Time Area Pipe Rack


N°014281 HRS 250 10 m3 12 cm 9:00 9:15 Hot Oil System PR02(D15-D16-D17)
N°014282 HRS 250 10 m3 14,5cm 9:40 9:50 Storage Area and Flare Area PR15(D71-E71)
N°014283 HRS 250 10 m3 15 cm 10:20 10:30 Storage Area and Flare Area PR17(H81-I81)
Storage Area and Flare Area PR17(H80-I80)
N°014284 HRS 250 10 m3 14,5cm 10:55 11:10
Instrument &Service Air System PR21(A1-A2)
N°014285 HRS 250 10 m3 12,5 cm 11:45 12:00 Instrument &Service Air System PR21(A3-A4-B1-B2)
N°014286 HRS 250 10 m3 13,5 cm 12:30 12:45 Instrument &Service Air System P21(A5-A6-B3-B4)
N°014287 HRS 250 10 m3 14 cm 13:15 13:30 Instrument &Service Air System PR21(A7-B5-B6)
N°014288 HRS 250 10 m3 14 cm 13:50 14:00 Instrument &Service Air System PR21(A8-B7)