Professional Documents
Culture Documents
PERSONAL INFORMATIONS
Name: TALBI
Surname: Khaled
Date & place of birth: 03-10-1985 at Tataouine
Civil Status: Single
Nationality: Tunisian
Address: 3251 Gssar Mourabtinne Ghomrassen Tataouine
Tel: (+216) 97 693 327
Mail: khaledttalbi@gmail.com
PROFESSIONAL EXPERIENCE
HIGHLIGHTS
o Welding Projects Supervising
o Welding Inspector
o Welders Qualification
o Quality Control
o Painting Inspector
o NDT Inspector
TRAINING COURSES
CERTIFICATS
MISSION PERFORMED
Witnessed and qualification of welders & welding operators according to (ASME IX,
EN ISO 9606-1, API 1104& AWS D1.1….)
Witnessed and qualification of PQR according to (ASME IX, EN15614-1, API1104 & AWS D1.1)
Welding inspector during welding construction works according to (ASME IV, B31.1& B31.3, & API
1104…)
Witness of mechanical tests (Tensile test, bend test, impact test…)
Assistance for PWHT
Inspection of pressure vessels, piping & atmospheric storage tanks according to (API 653, API 653, API 1104,
CODAP 2005…)
Painting inspector :Witness of the cleaning and painting works (Verification of the climatic condition and
Check the thicknesses of each coat and verify that satisfy the specification requirements)
Galvanizing control (structural steel, bolted tanks, structure ...) according to the standards (ASTM 123, ASTM
780. EN ISO 1461 ...)
Control by Positive materiel identification PMI according to (ASTM A 312, A 335…)
Assistance of Leak test
Hardness measurement
Control by Holiday detector
Determination of ferrite rate
Thickness measurement
MISSIONS
o RETEL
Project : TATAOUINE Branch line
Mean Project : QA/QC
Site : Tataouine
Period: from 10/12/2018 to 01/12/2019
Tasks:
o Client : STIR
Period: from 04/08/2015 to 03/09/2015
Site: Bizerte
Tasks:
Welder’s performance qualification.
Visual inspection of Storage tanks according to API 650& API 653
Supervision of repairs of tank
o Client : MEDCO
Period: from 06/03/2015 to 16/03/2015
Site: Bir Ben Tartar
Tasks:
Pipe reception
Visual inspection
Dimensional control.
o Client : CERI
Project: Sousse Project Combined Cycle Gas Power Plant (sousse D)
Period: from 27/05/2014 to 03/07/2014 & from 24/08/2014 to 04/09/2014 & from04/04/2015 to
04/05/2015
Mean Project: QA/QC Inspector
Site: Sousse
Tasks:
Visual inspection of welding
Check weld and welder numbering. Ensure joint is thermal wrapped.
Inspect and record pre-welding operation.
Inspect and control of inter-pass by dye penetrant
Review and approve WPS and supporting PQR and repair welding
Tasks:
Assist witness coupon of 06 spheres according CODAP 2005
Wetness of Procedure Qualification Record
Witness of mechanical tests
Thickness measurement
Hardness testing
Site: Sousse
Tasks:
Check structure galvanized
Verification and approval of specifications relative to repartion
Supervisor for all reparation
Wall Thickness measurement for galvanized layers
o Client : ETELEC
Project: Sousse Project Combined Cycle Gas Power Plant (sousse C)
Period: 27/08/2013 and 01/11/2013
Mean Project: Painting Inspector
Site: Sousse
Tasks:
Control of paint to according customer specification.
- Control of surface roughness
- Measurement of ambient temperature as well as support
- Checking the dew point
o Client : STIR
Period: 29/06/2013 & 04/08/2015 to 07/08/2015
Site: Bizerte
Tasks:
Welder’s performance qualification (WPQ).
Wetness of Procedure Qualification Record
Holiday detector inspection of coated layers of polyethylene.
o Client : HALWANI
Period: From 03/12/2012 to 31/12/2012 & from 13/01/2013 to 06/02/2013
Site: Dkhila
Tasks:
Control of paint to according customer specification.
Control thickness of different layers of painting
Preparation of P.V control paint
LANGUAGES