PROJECT: PROPOSED BUILDING RESIDENTIAL+HOTEL+OFFICES B+G+P+7

MECHANICAL WORKS

No. Description Unit Qty Material Cost Labour Cost+10%

Air Conditioning

Supply and Installation of VRV Outdoor


1 units and FCU's complete as specified LS 1 378,000.00 94,500.00
and shown in drawings

2 Supply and Installation of Copper piping LS 1 25000 5000


interconnecting Outdoor and FCU

3 Supply and Installation of Intelligent LS 1 10500 2500


Touch Manager

Supply and Installation of FAHU(Supply


4 1300 cfm & exhaust- 1000) with heat lot 1 39000 10000
recovery wheel and DX condensing
units

Supply and installation of


6 Ductworkcomplete with all related LOT 1 144000
accessories

12 Supply and installation of Grilles, LOT 1


Diffusers and Registers
13 Supply and installation of Louvers LOT 1
Total

Water Supply:

Supply and installation of PPR Hot &


1 Cold water supply pipes with fittings LOT 1
and all other accessories

Supply and installation of PEX pipes(for


2 final drops)fittingsand all other LOT 1
accessories complete
3 EWH Nos 300
4 Float Valves Nos 2
5 Booster pump (1D+1S) Set 1
6 Transfer pump (1D+1S) Set 1
7 GRP O.H tank Nos 1
Total
Drainage:

1 Supply and installation of Sanitary LOT 1


drainage, Waste ,Vent pipe work and
fittings, with all other accessories
2 Rain water pipe LOT 1
3 Condensate drain LOT 1
4 Floor drains Nos 266
5 Floor Traps Nos 266
6 Clean out Nos 293
7 Floor clean out Nos 20
8 Catch Basins Nos 42
9 Gully trap Nos 14
10 Sand trap. Nos 8
11 RWO Nos 5
12 Grating m 6
13 Manhole covers 1 LOT
14 Sump pumps (1D+1S) SET 2
Total
Summary
Air Conditioning
Water supply
Drainage
Total Summary

Exclusions:

1.Supply and installation of BMS Works


2.Any fee to be paid to authorities(DEWA, Etisalat,Civil defense etc)
3.All works related to Sump pits, Manhole and water filtration
4.All type of civil works such as excavation, backfilling, cutting,Fire stopping sealant, grouting for sanitary fixtures, wall and be
5.Foundations for A/C Units, Water tanks and Pumps
6.Scaffoldings required for installtion works,
7.Water and power required for erection, testing and commissioning
8.Crane facility to lift A/C Units, pumps and all other equipments
9.Supply & Installation of Sanitary fixtures and accessories
Amount

472,500.00

30,000.00

13,000.00

49,000.00

144,000.00

708,500.00

#VALUE!

#VALUE!

#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
400,365.00

45,200.00
43,050.00
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
36,500.00
#VALUE!
#VALUE!

708,500.00
#VALUE!
#VALUE!
#VALUE!

or sanitary fixtures, wall and beam openings for duct & pipes