CONTRACTOR PROJECT No.

10100.

PO Nº- 10100-2410.

CLIENT PO Nº 10100.

CONTRACTOR CONTRACTOR DOC. No. REV.


Doc. Code
RAS TANURA
ESP – REFINERY CLEAN
0003 FUELS PROJECT-
LUP-08 & 09
VENDOR NAME / LOGO NMR Code………

RAPCO GROUP-EPC N/A

UNIT / EQUIP. No: …….

DOCUMENT TITLE: DESIGN CALCULATION OF PLUMBING SYSTEM

VENDOR DOCUMENT Nº: RAPCO-ESP-GEN-TDS-020 VENDOR REV. A

REVIEW RESPONSE BY CONTRACTOR:

CONTRACTOR review comments do not indicate either responsibility or liability for accuracy and completeness of this Document or alter any
contractual terms and conditions.

A - REJECTED C - REVI EWED WITH COMMENTS F - REVIEWED WITHOUT COMMENTS

B - COMMENTS AS NOTED R - AS BUILT I - FOR INFORMATION

Date;-02.11.2017.

This document is property of UTE TR Naphtha RT and TR Saudia for Services and Contracting Co Ltd.
Its reproduction without previous permission in writing is strictly forbidden.
.
10100-00-082-PD-0002-tmp02
DESIGN CALCULATION OF PLUMBING SYSTEM
TEMPORARY CONSTRUCTION FACILITIES
1.0 LIST OF DRAWINGS
DWG# DRAWING TITLE REV SHTS

FFL-1-LUP08-00-
Potable water line layout A 01 OF 01
A001
SSL-1-LUP08-00-
Sewer Line Layout A 01 OF 01
A001
FFL-1-LUP09-00-
Potable water line layout A 01 OF 01
A001
SSL-1-LUP09-00-
Sewer Line Layout A 01 OF 01
A001

2.0 SCOPE:

The scope of work includes design of the Plumbing System (water supply & drainage) for
Temporary Construction Facilities (TCF) at LUP-08 & LUP-09.

2.1 REGULATIONS, STANDARDS AND CODES:

The design and installation of the utilities will be based on the following governing
standards and codes of practice. The most recent approved edition shall be applied.
Incase of contradiction in the standards the one that provides more safety and reliablity
measures should be applied.

UPC Uniform Plumbing Code


IPC Internernational Plumbing Code
ASHRAE American Society Of Heating Ventilation and Air Conditioning Engineers
3.0 DESIGN BASIS / PARAMETERS:

3.1 INTRODUCTION:
This report is intend to define, discuss and conclude the design of plumbing system i.e,
drainage and potable water system for Temporary Construction Facilities (TCF)
The basic aim of this report is to present the startegy for the building services designed by
the following means,
- Define essential guidelines codes and standards that will be followed.
- Load analysis and demand estimation
- Design Drawings.

3.2 SYSTEM DESCRIPTION


The plumbing system is divided into the following sub-System
a. Sanitary Sewer and Drainage System for toilets
b. Cold / Hot water supply for toilets

3.3 POTABLE WATER SYSTEM


3.3.1 Water Source Truck filling (alternate days)
3.3.2 Location of Water Tank Ground Level
3.3.3 Booster pump Proposed to meet the pressure requirement of all fixtures

3.4 SANITARY SEWER AMD DRAINAGE SYSTEM

3.4.1 SANITARY DRAINAGE SYSTEM DESCRIPTION

All foul drainage from toilets and waste water from toilets, lavatories will drain by gravity
to the underground main sanitary drainage pipe lines and the main drainage line is connected
to holding tank.

According to the International, Uniform plumbing codes, an estimation of different


branches and mains of the drainage piping system will be carried out based on it space activity
and occupants estimated numbers.

The sanitary drainage system consists of piping system for collecting soil drainage from toilets,
piping system for collecting waste water from toilets, lavatories, manholes and connection with
holding tank.
4 CALCULATIONS
4.1 TOILET DRAINAGE SYSTEM:
Drainage Fixture Unit values are picked and based on the international plumbing codes,
please see attached reference codes.

Location Room Ref. Provided Fixtures QTY F.U Total


Water closets (Eastern / Western) 7 6 42
Lavatory 6 1 6
LUP-08 Toilet-1 Urinal 2 4 8
Kitchen Sink 1 2 2
Floor Drain 9 2 18
Total Fixtures 76

Location Room Ref. Provided Fixtures QTY F.U Total


Water closets (Eastern / Western) 4 6 24
Lavatory 2 1 2
LUP-09 Toilet-1
Urinal 2 4 8
Floor Drain 2 2 4
Total Fixtures for Toilet-1 38

Water closets (Eastern / Western) 3 6 18


Lavatory 4 1 4
LUP-09 Toilet-2 Urinal 3 4 12
Kitchen Sink 4 2 8
Floor Drain 5 2 10
Total Fixtures for Toilet-2 52
Water closets (Eastern / Western) 8 6 48
Lavatory 4 1 4
LUP-09 Toilet-3
Urinal 4 4 16
Floor Drain 10 2 20
Total Fixtures for Toilet-3 88
Water closets (Eastern / Western) 2 6 12
LUP-09 Toilet-4 Lavatory 1 1 1
Floor Drain 3 2 6
Total Fixtures for Toilet-4 19
Water closets (Eastern / Western) 8 6 48
Lavatory 5 1 5
LUP-09 Toilet-5 Urinal 2 4 8
Kitchen Sink 1 2 2
Floor Drain 6 2 12
Total Fixtures for Toilet-5 75
Water closets (Eastern / Western) 9 6 54
Lavatory 7 1 7
LUP-09 Toilet-6
Kitchen Sink 1 2 2
Floor Drain 10 2 20
Total Fixtures for Toilet-1 83
Water closets (Eastern / Western) 6 6 36
LUP-09 Toilet-7 Lavatory 8 1 8
Floor Drain 7 2 14
Total Fixtures for Toilet-1 58
Grand Total Fixtures 413
For LUP-08 TCF
The selected main drain pipe size, according to the code and suitable for a total
of 76 fixture units is Dia 4 inch.

For LUP-09 TCF


The selected main drain pipe size, according to the code and suitable for a total
of 413 fixture units is Dia 6 inch. The material shall be PVC-Sch-40.
4.2 COLD WATER SUPPLY SYSTEM

4.2.1 SERVICE WATER DEMAND, MAIN PIPE & PRINCIPLE BRANCH SIZING:
TOTAL SERVICE WATER DEMAND & MAIN PIPE SIZING:
Based on the demand weight of the fixture units presented in table 13 & A-2 of the
international plumbing code-2012 the following shall be obtained.

Location Room Ref. Provided Fixtures QTY F.U Total


Water closets (flush tank) 7 5 35
Lavatory 6 2 12
LUP-08 Toilet-1
Kitchen Sink 1 4 4

TOTAL (Fixture Units) 47

Location Room Ref. Provided Fixtures QTY F.U Total


Water closets (Eastern / Western) 4 5 20
LUP-09 Toilet-1 Lavatory 2 2 4
Urinal 2 5 10
Total Fixtures for Toilet-1 34

Water closets (Eastern / Western) 3 5 15


Lavatory 4 2 8
LUP-09 Toilet-2
Urinal 3 5 15
Kitchen Sink 4 4 16
Total Fixtures for Toilet-2 54

Water closets (Eastern / Western) 8 5 40


LUP-09 Toilet-3 Lavatory 4 2 8
Urinal 4 5 20
Total Fixtures for Toilet-3 68

Water closets (Eastern / Western) 2 5 10


LUP-09 Toilet-4
Lavatory 1 2 2
Total Fixtures for Toilet-4 12

Water closets (Eastern / Western) 8 5 40


Lavatory 5 2 10
LUP-09 Toilet-5
Urinal 2 5 10
Kitchen Sink 1 4 4
Total Fixtures for Toilet-5 64

Water closets (Eastern / Western) 9 5 45


LUP-09 Toilet-6 Lavatory 7 2 14
Kitchen Sink 1 4 4
Total Fixtures for Toilet-1 63

Water closets (Eastern / Western) 6 5 30


LUP-09 Toilet-7
Lavatory 8 2 16
Total Fixtures for Toilet-1 46
Grand Total Fixtures 341
For LUP-08 TCF
Total number of fixture units connected are 47
From table E103.3(3) of IPC,at 47 fixture units water demand is 29 gpm

WATER PIPE SELECTION


Option-1 Option-2
Shedule 80 Steel Shedule 80 PVC
Water Flow 29 gpm Water Flow 29 gpm
Main Pipe size 2 inch Main Pipe size 2 inch
Water Velocity 3.15 ft/s Water Velocity 3.15 ft/s
Friction rate 2.29 ft/100 ft Friction rate 2.15 ft/100 ft
For LUP-09 TCF
Total number of fixture units connected are 341
From table E103.3(3) of IPC,at 273 fixture units water demand is 80 gpm

WATER PIPE SELECTION


Option-1 Option-2
Shedule 80 Steel Shedule 80 PVC
Water Flow 93 gpm Water Flow 93 gpm
Main Pipe size 3 inch Main Pipe size 3 inch
Water Velocity 4.52 ft/s Water Velocity 4.52 ft/s
Friction rate 2.81 ft/100 ft Friction rate 2.5 ft/100 ft

5. WATER TANK CAPACITY


For LUP-08 TCF
No of People 40 ( 11 hours per day)

For urinal, Considered number of usages per person = 2 , so total number of uses per day = 80
For W.C, Considered number of usages per person = 2 , so total number of uses per day = 80
For Lavotary, Considered number of usages per person = 2 , so total number of uses per day = 80
For kitchen sink, Considered number of usages per person = 2 , so total number of uses per day = 80
For shower head, Considered number of usages per person = 1 , so total number of uses per day = 10

As per IPC Table 604.4 water usage for fixtures are

1 Water Closet 1.6 gallon per flushing cycle Total Demand for 80 uses 128
2 Urinal 1 gallon per flushing cycle Total Demand for 80 uses 80
3 Lavoratory 0.5 gallon per minute Total Demand for 80 uses 40
4 kitchen sink 2.2 gallon per minute Total Demand for 80 uses 176
5 shower head 2.5 gallon per minute Total Demand for 10 uses 25
Total Water Demand 449
Safety Factor 10% 44.9
Grand Total 493.9

Considering alternate day of truck filling, the water tank capacity is 987.8 gallons
(1 gallon =3.78 liters) 3734 Liters

WATER TANK CAPACITY


For LUP-09 TCF
No of People 250+10 ( 11 hours per day)

For urinal, Considered number of usages per person = 2 , so total number of uses per day = 500
For W.C, Considered number of usages per person = 2 , so total number of uses per day = 520
For Lavotary, Considered number of usages per person = 2 , so total number of uses per day = 500
For kitchen sink, Considered number of usages per person = 2 , so total number of uses per day = 500
For shower head, Considered number of usages per person = 2 , so total number of uses per day = 20

As per IPC Table 604.4 water usage for fixtures are

1 Water Closet 1.6 gallon per flushing cycle Total Demand for 500 uses 800
2 Urinal 1 gallon per flushing cycle Total Demand for 520 uses 520
3 Lavoratory 0.5 gallon per minute Total Demand for 500 uses 250
4 kitchen sink 2.2 gallon per minute Total Demand for 500 uses 1100
5 shower head 2.5 gallon per minute Total Demand for 20 uses 50
Total Water Demand 2720
Safety Factor 10% 272
Grand Total 2992

Considering alternate day truck filling, the water tank capacity is 5984 gallons
(1 gallon =3.78 liters) 22620 Liters
6. SEEWAGE HOLDING TANK CAPACITY
For LUP-08 TCF

No of People 40 ( 11 hours per day)


As per IPC Table 802.7.2, waste water production per person for employees of all shifts is 20 gallon
So total sewage formation per day = 20* 40 = 800 gallon per day
Holding time of sewage 1 day

Considering alternate day of truck loading, the sewage holding tank capacity is 1600 gallon

For LUP-09 TCF

No of People 250 ( 11 hours per day)

As per IPC Table 802.7.2, waste water production per person for employees of all shifts is 20 gallon

So total sewage formation per day = 20* 250 = 5000 gallon per day
Holding time of sewage 1 day

Considering alternate day of truck loading, the sewage holding tank capacity is 10000 gallon

7 BOOSTER PUMP: AT LUP-08


7.1 DATA
Pump capacity = 29.00 gpm (Ref. to demand estimation)
Pump is vertical, multi stage.

7.2 FORMULAE

Friction loss (Head) hf = f LV²


Di 2g
Where
hf Loss in head due to pipe friction in psi
L Length of pipe in ft
f Friction factor
Di Inside Diameter of the pipe in ft
V Velocity of fluid in feet per second
g Acceleration due to gravity
V = Q/A
Where
V Mean velocity of fluid in fps
Q Fluid flow in CFM
A Cross sectional Area in ft²
A = p/4(Di²)

7.3 CALCULATION

VELOCITY IN SUCTION PIPE


(for the sake of calculation GS shedule 80 pipe is considered)
The Diameter of GS pipe is 2" (or ) (θ 50 mm) dia

From the pipe manufacturer's catalogue the dimension of GS pipe is as follows

Inside Dia (Di) = 2.07 in


Outside Dia (Do) = 2.38 in
Pipe wall thickness = 0.15 in
Cross sectional area of the pipe = 2.067 x 2.067 x PI/4
Cross sectional area of the pipe = 3.35 in² = 0.0233 ft²
Flow through the pipe = 29/448.831
= 0.06 ft³/sec

Velocity in suction pipe = 2.77 fps


7.4 VELOCITY IN DISCHARGE PIPE (Vd)

The Diameter of GS pipe is 2" (or ) 50 mm dia


From the pipe manufacturer's catalogue the dimension of GS pipe is as follows
Inside Dia (Di) = 2.067 in
Outside Dia (Do) = 2.375 in
Pipe wall thickness = 0.154 in
Cross sectional area of the pipe = 2.067 x 2.067 x pi/4
Cross sectional area of the pipe = 3.3539 in²
0.0233 ft²
Flow through the pipe = 29 / 448.831 = 0.06 ft³/sec
Velocity in discharge pipe = 2.7741 fps

7.5 HEAD LOSS DUE TO FRICTION IN SUCTION SIDE (Hfs)


From IPC of Fairly rough pipe sizing chart for GS pipe
corresponding to pipe size & suction velocity = 0.9 psi/100ft

Length of suction pipe is = 3 ft

Head loss due to fittings in suction pipe


Equivalent Length of
Pipe Type of fitting Quandity Total length
Pipe
2 908 Elbow 1 7 7
2 Tee 1 10 10
2 Union 2 2 4
2 Gate valve 2 1.3 2.6
2 Strainer 1 28 28
51.6
Total length of pipe is = 54.6 ft
Head loss due to friction in suction side (Hfs) 0.49 psi
Due to pressure from the water tank suction loss will be negleted.

7.6 HEAD LOSS DUE TO FRICTION IN DISCHARGE SIDE (Hfd)


Since the pressure requirement of water closet is higher than lavatory and shower head, farthest water
closet will be used for pressure calculation.

FRICTION LOSS COMPUTATION (Hfd)


Velocity
Size (in)
Pipe Mtl

psi/100f

Node
Fittings

Fittings
Len (ft)
Dmd in

Length

Qty of
(gpm)

Equv.

Total
(fps)
Pipe

Pipe

Pipe

Pipe

(psi)
loss

loss
(ft)
o

To
m
Fr

Pump 1 29 Steel 2 2.77 144 0.9 Union 2 1 1.317


SH40 0.9 GV 1.3 2 0.023
0.9 CV 22.4 1 0.202
0.9 Tee 10 6 0.540
0.9 Tee 2 1 0.018
0.9 Elbow 7 6 0.378

TOTAL FRICTION LOSS 2.478

Total friction loss at higest point (hfd) = 2.478 psi


7.7 THE HEAD DUE TO DIFFERENCE IN ELEVATION AT SUCTION SIDE (hs)

Center line elevation of pump = 0.3 m (approx)


Center line of suction point = 0.3 m (approx)
(center line of the point of tapping at tank)
Difference in Elevation = 0 m
hs = 0 psi

7.8 THE HEAD DUE TO DIFFERENCE IN ELEVATION AT DISCHARGE SIDE (hd)

Center line elevation of pump = 0.3 m (approx)


Elevation of water closet = 0.8 m
Difference in Elevation = 0.5 m

hd = 0.71 psi

7.9 CONSTANT PRESSURE REQUIRED AT FOLLOWING FIXTURES (Pc)


For Water closet = 20.00 psi (As per IPC Table 604.3)
For Lavatory = 8 psi (As per IPC Table 604.3)
Shower Head = 8 psi (As per IPC Table 604.3)
so the highest is considered Pc = 20 psi

7.10 TOTAL DYNAMIC HEAD ON THE PUMP (TDH)


THD = Hfs+Hfd+hs+hd+Pr
Where,
Pc constant press.required @ remotest fixture = 20 psi

Hfs- frictional loss at suction side = 0 psi


Hfd- frictional loss at discharge side = 2.48 psi
hs- head due to difference in elevation@ suction side = 0 psi
hd- head due to diff in elevation @ discharge side = 0.71 psi
Booster pump located on roof top
Total dynamic head on the pump (TDH) = Pc+Hfs+Hfd+Hs+Hd
23.2
Adding 2 psi, as allowance for sudden pressure drop = 2 psi
Safety Factor 10% = 2.32 psi
Total dynamic head on the pump (TDH) = 27.5 psi
= 19.4 m
= 63.5 ft

TOTAL DYNAMIC HEAD FOR BOOSTER PUMP OF LUP-08 = 63.5 ft

7.11 PUMP CUT IN PRESSURE (Pci)

Pci = Pc+Hfd+hd = 23.2 PSI


Pci = = 16.3 m
7.12 PUMP CUT OUT PRESSURE (Pco)

Pco = Pci+Constant = 36.3 PSI


25.6 m

10.13 BOOSTER PUMP DETAILS


Flow = 29 gpm
Total dynamic Head = 19.4 m 63.5 ft
Pump Type = Vertical multistage centrifugal pump
8 BOOSTER PUMP: AT LUP-09
8.1 DATA
Pump capacity = 93.00 gpm (Ref. to demand estimation)
Pump is vertical, multi stage.

8.2 FORMULAE

Friction loss (Head) hf = f LV²


Di 2g
Where
hf Loss in head due to pipe friction in psi
L Length of pipe in ft
f Friction factor
Di Inside Diameter of the pipe in ft
V Velocity of fluid in feet per second
g Acceleration due to gravity

V = Q/A
Where
V Mean velocity of fluid in fps
Q Fluid flow in CFM
A Cross sectional Area in ft²

A = p/4(Di²)

8.3 CALCULATION

VELOCITY IN SUCTION PIPE


(for the sake of calculation GS shedule 80 pipe is considered)
The Diameter of GS pipe is 3" (or ) (θ 75 mm) dia

From the pipe manufacturer's catalogue the dimension of GS pipe is as follows

Inside Dia (Di) = 3.07 in


Outside Dia (Do) = 3.5 in
Pipe wall thickness = 0.22 in
Cross sectional area of the pipe = 3.068 x 3.068 x PI/4
Cross sectional area of the pipe = 7.39 in² = 0.0513 ft²
Flow through the pipe = 93/448.831
= 0.21 ft³/sec
Velocity in suction pipe = 4.04 fps

8.4 VELOCITY IN DISCHARGE PIPE (Vd)

The Diameter of GS pipe is 3" (or ) (θ 75 mm) dia


From the pipe manufacturer's catalogue the dimension of GS pipe is as follows
Inside Dia (Di) = 3.068 in
Outside Dia (Do) = 3.500 in
Pipe wall thickness = 0.216 in
Cross sectional area of the pipe = 3.068 x 3.068 x PI/4
Cross sectional area of the pipe = 7.3889 in²
0.0513 ft²
Flow through the pipe = 93/ 448.831 = 0.21 ft³/sec
Velocity in discharge pipe = 4.0381 fps

The Diameter of GS pipe is 21/2" (or ) (θ 62.5 mm) dia


Inside Dia (Di) = 2.469 in 2.47
Outside Dia (Do) = 2.875 in 2.88
Pipe wall thickness = 0.203 in 0.2
Cross sectional area of the pipe = 2.469 x 2.469 x PI/4
Cross sectional area of the pipe = 4.7853 in² = 0.0332 ft²
Flow through the pipe = 48/448.831
= 0.1069 ft³/sec
Velocity in suction pipe = 3.2182 fps
The Diameter of GS pipe is 2" (or ) (θ 50 mm) dia
Inside Dia (Di) = 2.07 in
Outside Dia (Do) = 2.38 in
Pipe wall thickness = 0.15 in
Cross sectional area of the pipe = 2.067 x 2.067 x PI/4
Cross sectional area of the pipe = 3.35 in² = 0.0233 ft²
Flow through the pipe = 35/448.831
= 0.08 ft³/sec

Velocity in suction pipe = 3.35 fps

7.5 HEAD LOSS DUE TO FRICTION IN SUCTION SIDE (Hfs)


Due to pressure from the water tank, head loss due to friction in suction side will be negleted.

7.6 HEAD LOSS DUE TO FRICTION IN DISCHARGE SIDE (Hfd)


Since the pressure requirement of water closet is higher than lavatory and shower head, farthest water
closet will be used for pressure calculation.

From IPC of Fairly rough pipe sizing chart for GS pipe


corresponding to pipe size & suction velocity = 1.6 psi/100ft for 3" pipe
1.2 psi/100ft for 21/2" pipe
1.4 psi/100ft for 2" pipe

FRICTION LOSS COMPUTATION (Hfd)


Velocity
Size (in)
Pipe Mtl

psi/100f

Node
Fittings

Fittings
Len (ft)
Dmd in

Length

Qty of
(gpm)

Equv.

Total
(fps)
Pipe

Pipe

Pipe

Pipe

(psi)
loss

loss
(ft)
o

To
m
Fr

Pump 1 93 Steel 3 4.04 16.5 1.6 Union 3 1 0.312


SH80 1.6 GV 2 2 0.064
1.6 CV 33.6 1 0.538
1.6 Tee 15 1 0.240

1 2 59 Steel 3 4.04 146 1.6 Union 3 1 2.384


SH80 1.6 GV 2 2 0.064
1.6 CV 33.6 1 0.538
1.6 Tee 15 1 0.240
1.6 Elbow 10 1 0.160

1 2 59 Steel 21/2 4.04 19 1.2 Union 3 2 0.300


SH80 1.2 Tee 15 1 0.180

2 3 35 Steel 2 3.28 8.36 1.4 Union 2 1 0.145


1.4 Tee (BR) 10 1 0.140

3 4 29 Steel 2 204 1.3 Union 2 1 2.678


SH80 1.3 Tee (BR) 10 2 0.260
1.3 Elbow 7 5 0.455
1.3 Tee (BR) 2 3 0.078

TOTAL FRICTION LOSS 7.622

Total friction loss at higest point (hfd) = 7.622 psi


7.7 THE HEAD DUE TO DIFFERENCE IN ELEVATION AT SUCTION SIDE (hs)

Center line elevation of pump = 0.3 m (approx)


Center line of suction point = 0.3 m (approx)
(center line of the point of tapping at tank)
Difference in Elevation = 0 m
hs = 0 psi

7.8 THE HEAD DUE TO DIFFERENCE IN ELEVATION AT DISCHARGE SIDE (hd)

Center line elevation of pump = 0.3 m (approx)


Elevation of water closet = 0.8 m
Difference in Elevation = 0.5 m

hd = 0.71 psi

7.9 CONSTANT PRESSURE REQUIRED AT FOLLOWING FIXTURES (Pc)


For Water closet = 20.00 psi (As per IPC Table 604.3)
For Lavatory = 8 psi (As per IPC Table 604.3)
Shower Head = 8 psi (As per IPC Table 604.3)
so the highest is considered Pc = 20 psi

7.10 TOTAL DYNAMIC HEAD ON THE PUMP (TDH)


THD = Hfs+Hfd+hs+hd+Pr
Where,
Pc constant press.required @ remotest fixture = 20 psi

Hfs- frictional loss at suction side = 0 psi


Hfd- frictional loss at discharge side = 7.62 psi
hs- head due to difference in elevation@ suction side = 0 psi
hd- head due to diff in elevation @ discharge side = 0.71 psi
Booster pump located on roof top
Total dynamic head on the pump (TDH) = Pc+Hfs+Hfd+Hs+Hd
28.3
Adding 2 psi, as allowance for sudden pressure drop = 2 psi
Safety Factor 10% = 2.83 psi
Total dynamic head on the pump (TDH) = 33.2 psi
= 23.4 m
= 76.6 ft

TOTAL DYNAMIC HEAD FOR BOOSTER PUMP OF LUP-09 = 76.6 ft

7.11 PUMP CUT IN PRESSURE (Pci)

Pci = Pc+Hfd+hd = 28.3 PSI


Pci = = 20 m
7.12 PUMP CUT OUT PRESSURE (Pco)

Pco = Pci+Constant = 40 PSI


28.1 m

10.13 BOOSTER PUMP DETAILS


Flow = 93 gpm
Total dynamic Head = 23.4 m 76.8 ft
Pump Type = Vertical multistage centrifugal pump