10100.
PO Nº- 10100-2410.
CLIENT PO Nº 10100.
CONTRACTOR review comments do not indicate either responsibility or liability for accuracy and completeness of this Document or alter any
contractual terms and conditions.
Date;-02.11.2017.
This document is property of UTE TR Naphtha RT and TR Saudia for Services and Contracting Co Ltd.
Its reproduction without previous permission in writing is strictly forbidden.
.
10100-00-082-PD-0002-tmp02
DESIGN CALCULATION OF PLUMBING SYSTEM
TEMPORARY CONSTRUCTION FACILITIES
1.0 LIST OF DRAWINGS
DWG# DRAWING TITLE REV SHTS
FFL-1-LUP08-00-
Potable water line layout A 01 OF 01
A001
SSL-1-LUP08-00-
Sewer Line Layout A 01 OF 01
A001
FFL-1-LUP09-00-
Potable water line layout A 01 OF 01
A001
SSL-1-LUP09-00-
Sewer Line Layout A 01 OF 01
A001
2.0 SCOPE:
The scope of work includes design of the Plumbing System (water supply & drainage) for
Temporary Construction Facilities (TCF) at LUP-08 & LUP-09.
The design and installation of the utilities will be based on the following governing
standards and codes of practice. The most recent approved edition shall be applied.
Incase of contradiction in the standards the one that provides more safety and reliablity
measures should be applied.
3.1 INTRODUCTION:
This report is intend to define, discuss and conclude the design of plumbing system i.e,
drainage and potable water system for Temporary Construction Facilities (TCF)
The basic aim of this report is to present the startegy for the building services designed by
the following means,
- Define essential guidelines codes and standards that will be followed.
- Load analysis and demand estimation
- Design Drawings.
All foul drainage from toilets and waste water from toilets, lavatories will drain by gravity
to the underground main sanitary drainage pipe lines and the main drainage line is connected
to holding tank.
The sanitary drainage system consists of piping system for collecting soil drainage from toilets,
piping system for collecting waste water from toilets, lavatories, manholes and connection with
holding tank.
4 CALCULATIONS
4.1 TOILET DRAINAGE SYSTEM:
Drainage Fixture Unit values are picked and based on the international plumbing codes,
please see attached reference codes.
4.2.1 SERVICE WATER DEMAND, MAIN PIPE & PRINCIPLE BRANCH SIZING:
TOTAL SERVICE WATER DEMAND & MAIN PIPE SIZING:
Based on the demand weight of the fixture units presented in table 13 & A-2 of the
international plumbing code-2012 the following shall be obtained.
For urinal, Considered number of usages per person = 2 , so total number of uses per day = 80
For W.C, Considered number of usages per person = 2 , so total number of uses per day = 80
For Lavotary, Considered number of usages per person = 2 , so total number of uses per day = 80
For kitchen sink, Considered number of usages per person = 2 , so total number of uses per day = 80
For shower head, Considered number of usages per person = 1 , so total number of uses per day = 10
1 Water Closet 1.6 gallon per flushing cycle Total Demand for 80 uses 128
2 Urinal 1 gallon per flushing cycle Total Demand for 80 uses 80
3 Lavoratory 0.5 gallon per minute Total Demand for 80 uses 40
4 kitchen sink 2.2 gallon per minute Total Demand for 80 uses 176
5 shower head 2.5 gallon per minute Total Demand for 10 uses 25
Total Water Demand 449
Safety Factor 10% 44.9
Grand Total 493.9
Considering alternate day of truck filling, the water tank capacity is 987.8 gallons
(1 gallon =3.78 liters) 3734 Liters
For urinal, Considered number of usages per person = 2 , so total number of uses per day = 500
For W.C, Considered number of usages per person = 2 , so total number of uses per day = 520
For Lavotary, Considered number of usages per person = 2 , so total number of uses per day = 500
For kitchen sink, Considered number of usages per person = 2 , so total number of uses per day = 500
For shower head, Considered number of usages per person = 2 , so total number of uses per day = 20
1 Water Closet 1.6 gallon per flushing cycle Total Demand for 500 uses 800
2 Urinal 1 gallon per flushing cycle Total Demand for 520 uses 520
3 Lavoratory 0.5 gallon per minute Total Demand for 500 uses 250
4 kitchen sink 2.2 gallon per minute Total Demand for 500 uses 1100
5 shower head 2.5 gallon per minute Total Demand for 20 uses 50
Total Water Demand 2720
Safety Factor 10% 272
Grand Total 2992
Considering alternate day truck filling, the water tank capacity is 5984 gallons
(1 gallon =3.78 liters) 22620 Liters
6. SEEWAGE HOLDING TANK CAPACITY
For LUP-08 TCF
Considering alternate day of truck loading, the sewage holding tank capacity is 1600 gallon
As per IPC Table 802.7.2, waste water production per person for employees of all shifts is 20 gallon
So total sewage formation per day = 20* 250 = 5000 gallon per day
Holding time of sewage 1 day
Considering alternate day of truck loading, the sewage holding tank capacity is 10000 gallon
7.2 FORMULAE
7.3 CALCULATION
psi/100f
Node
Fittings
Fittings
Len (ft)
Dmd in
Length
Qty of
(gpm)
Equv.
Total
(fps)
Pipe
Pipe
Pipe
Pipe
(psi)
loss
loss
(ft)
o
To
m
Fr
hd = 0.71 psi
8.2 FORMULAE
V = Q/A
Where
V Mean velocity of fluid in fps
Q Fluid flow in CFM
A Cross sectional Area in ft²
A = p/4(Di²)
8.3 CALCULATION
psi/100f
Node
Fittings
Fittings
Len (ft)
Dmd in
Length
Qty of
(gpm)
Equv.
Total
(fps)
Pipe
Pipe
Pipe
Pipe
(psi)
loss
loss
(ft)
o
To
m
Fr
hd = 0.71 psi