You are on page 1of 13

BOQ-Lot 1

Bill of Well # ZP1


Item
Description Unit Qty. Unit Price (US$) Total (US$)
NO.
General Notes:
1.The price includes Supplying, deliver, testing, installing, and commissioning Submersible pumps units (bowel assembly, Motors, Cables, Control panel,
riser pipes ,..etc.) complete with all required connections and accessories including all works and material to connet the well discharge pipe to the public
network pipeline.

2. For well head chamber and piping works to network pipline :a). All fittings, valves and specials rated for PN 16.
b.) pipes,valves and fittings shall include all gaskets ,bolts and any materials and works to complete the job according to technical specifications and
drawings and the engineer's direction.

Dismantling: The contractor has to carefully dismantle and remove all the existing equipment inside the well
hole (pump,motor,riser pipes,cables,valves,water meters,fittings,...etc) and any parts on well site and inside
control room have to be removed and delivered as instructed by the suppervised engineer . The work shall also
include all needed equipment ( crane, trucks,tools ... etc.) to complete the work as required.The contractor will
1
be required to replace any item which will get damaged during the work process by an equal one at no extra LS 1
cost to the owner or UNOPS. The rate includes delivery of dismantled material to client (HWSLC) storage area
or disposal to an approved dumping location . All works should be done in close coordination with
client(HWSLC) and the engineer.

Submersible Motor Pump Set: Supply, install and operate a new submersible pump with all the accessories it
needs to get a working system. The submersible pump have to be with non-return flow valve , pump efficiency
> 70% at design point, driven by a heavy duty submersible three phase induction motor with at least 30%
2
rated output power above the maximum required power of the pump, input voltage 380-400volts,50Hz, Set 1
PF > 0.84 and motor efficiency>82%,with thermal sensors –PT 100. The pump have to deliver 17 l/s at Total
Head =240m. Pump sitting =126m,Well casing diameter = 10” and water temperature up to 50 oC.

supply and install Stainless steel Cooling sleeve of 203mm for submersible motor with all accessories if
3
required. set 1
Electric Power Control, Switch and Distribution Board:
Supply, Install, Connect and complete in place and perfect operational manner a 400V,50Hz main power
control switch and distribution board , factory made with Auto-transformer starter , Electronic Monitoring
and Protection Unit , including dry running protection relaty ,and all classic protections and measurements as
4 shown in technical specification.• The Minimum output of the Switchboard shall be rated at least 10% above Set 1
the maximum required power of the motor.

Power cable (all copper wires) :Submersible feeding cable, single core size 50 mm2 with termination kits and
5 bonds ,Cable joint (shrink type). . m 420

6 Dry running electrodes with submersible monitoring cable of suitable size and 140 m length. Set 1
UPVC Riser Pipe (Column Pipe): Supply and install square threaded riser Pipe DN 4” ,3m length with ,pump
7 guard set, pipe lifting and tightenings tools and all required accessories. PC 42
8 UPVC Couplers/Joints for above item with o rings (riser pipes) PC 42
9 4" stainless steel top adaptor to be used for connecting the riser pipes with bend fittings No. 1
10 4" stainless steel bottom adaptor to be used for connecting the riser pipes with the pump outlet No. 1
Heavy duty galvanized Surface Plate (well Head Cap) with 4" vertical connection and 4" horizontal
11 connection No. 1
Coated carbon -steel or galvanized steel Water hammer pressure obsorber tank (surge tank) size: 750-1000 L
12 with all required connections,fittings ,pressure indicator and accessories set 1
13 4" double flanged water flowmeter set 1
14 4" flanged Non-return Valve set 1
15 4" flanged gate valve set 1
Supply and install a common analog pressure gauge (0- 20 bar) with all needed fittings and valves ,on the
16
discharge pipe directly near the well opening.
set 1
17 Repair kit for the pump set 1
18 Repair kit for the motor set 1
19 All necessary special tools for pump and motor set 1
Total of Bill of Well # ZP1 – US$
Bill of Well # ZW1
Item
NO.
General Notes:
1.The price includes Supplying, deliver, testing, installing, and commissioning Submersible pumps units (bowel assembly, Motors, Cables, Control panel, riser pipes ,..etc.) complete with all required
connections and accessories including all works and material to connet the well discharge pipe to the public network pipeline.

2. For well head chamber and piping works to network pipline :a). All fittings, valves and specials rated for PN 16.
b.) pipes,valves and fittings shall include all gaskets ,bolts and any materials and works to complete the job according to technical specifications and drawings and the engineer's direction.

8
9
10
11

12

13
14
15

16

17
18
19
Total of Bill of Well # ZW1 – US$
BOQ-Lot 2
Bill of Well # ZW1
Description Unit Qty. Unit Price (US$)

General Notes:
1.The price includes Supplying, deliver, testing, installing, and commissioning Submersible pumps units (bowel assembly, Motors, Cables, Control panel, riser pipes ,..etc.) complete with all required
connections and accessories including all works and material to connet the well discharge pipe to the public network pipeline.

2. For well head chamber and piping works to network pipline :a). All fittings, valves and specials rated for PN 16.
b.) pipes,valves and fittings shall include all gaskets ,bolts and any materials and works to complete the job according to technical specifications and drawings and the engineer's direction.
Dismantling: The contractor has to carefully dismantle and remove all the existing equipment inside the well hole (pump,motor,riser
pipes,cables,valves,water meters,fittings,...etc) and any parts on well site and inside control room have to be removed and delivered as instructed by the
suppervised engineer . The work shall also include all needed equipment ( crane, trucks,tools ... etc.) to complete the work as required.The contractor will
be required to replace any item which will get damaged during the work process by an equal one at no extra cost to the owner or UNOPS. The rate includes LS 1
delivery of dismantled material to client (HWSLC) storage area or disposal to an approved dumping location . All works should be done in close
coordination with client(HWSLC) and the engineer.

Submersible Motor Pump Set: Supply, install and operate a new submersible pump with all the accessories it needs to get a working system. The
submersible pump have to be with non-return flow valve , pump efficiency > 70% at design point, driven by a heavy duty hi-temp submersible three phase
induction motor with at least 60% rated output power above the maximum required power of the pump , input voltage 380-400volts,50Hz, PF > 0.84 Set 1
and motor efficiency>82%,with thermal sensors –PT 100. The pump have to deliver 17 l/s at Total Head =240m. Pump sitting =132m,Well casing
diameter = 10” and water temperature up to 70 oC .

supply and install Stainless steel Cooling sleeve of 203mm for submersible motor with all accessories if required. set 1
Electric Power Control, Switch and Distribution Board:
Supply, Install, Connect and complete in place and perfect operational manner a 400V,50Hz main power control switch and distribution board , factory
made with Auto-transformer starter , Electronic Monitoring and Protection Unit , including dry running protection relaty ,and all classic protections
and measurements as shown in technical specification.• The Minimum output of the Switchboard shall be rated at least 10% above the maximum Set 1
required power of the motor.

Power cable (all copper wires) :Submersible feeding cable, single core size 50 mm2 with termination kits and bonds ,Cable joint (shrink type).
. m 450
Dry running electrodes with submersible monitoring cable of suitable size and 150 m length. Set 1
UPVC Riser Pipe (Column Pipe): Supply and install square threaded riser Pipe DN 4” ,3m length with ,pump guard set, pipe lifting and tightenings tools
and all required accessories. PC 44
UPVC Couplers/Joints for above item with o rings (riser pipes) PC 44
4" stainless steel top adaptor to be used for connecting the riser pipes with bend fittings No. 1
4" stainless steel bottom adaptor to be used for connecting the riser pipes with the pump outlet No. 1
Heavy duty galvanized Surface Plate (well Head Cap) with 4" vertical connection and 4" horizontal connection Pc 1
Coated carbon -steel or galvanized steel Water hammer pressure obsorber tank (surge tank) size: 750-1000 L with all required connections,fittings ,pressure
indicator and accessories set 1
4" double flanged water flowmeter set 1
4" flanged Non-return Valve set 1
4" flanged gate valve set 1
Supply and install a common analog pressure gauge (0- 20 bar) with all needed fittings and valves ,on the discharge pipe directly near the well opening. Set 1
Repair kit for the pump set 1
Repair kit for the motor Set 1
All necessary special tools for pump and motor set 1
Total of Bill of Well # ZW1 – US$
Total (US$)

complete with all required

eer's direction.
BOQ-Lot 3
Bill of Well # 3 Thulla Well field
Item
Description Unit Qty. Unit Price (US$) Total (US$)
NO.
General Notes:
1.The price includes Supplying, deliver, testing, installing, and commissioning Submersible pumps units (bowel assembly, Motors, Cables, Control panel,
riser pipes ,..etc.) complete with all required connections and accessories including all works and material to connet the well discharge pipe to the public
network pipeline.
2. For well head chamber and piping works to network pipline :a). All fittings, valves and specials rated for PN 16.
b.) pipes,valves and fittings shall include all gaskets ,bolts and any materials and works to complete the job according to technical specifications and
drawings and the engineer's direction.
Dismantling: The contractor has to carefully dismantle and remove all the existing equipment inside the well
hole (pump,motor,riser pipes,cables,valves,water meters,fittings,...etc) and any parts on well site and inside
control room have to be removed and delivered as instructed by the suppervised engineer . The work shall also
include all needed equipment ( crane, trucks,tools ... etc.) to complete the work as required.The contractor will
1
be required to replace any item which will get damaged during the work process by an equal one at no extra LS 1
cost to the owner or UNOPS. The rate includes delivery of dismantled material to client (HWSLC) storage area
or disposal to an approved dumping location . All works should be done in close coordination with
client(HWSLC) and the engineer.

Submersible Motor Pump Set: Supply, install and operate a new submersible pump with all the accessories it
needs to get a working system. The submersible pump have to be with non-return flow valve , pump efficiency
> 70% at design point, driven by a heavy duty submersible three phase induction motor with at least 30%
2
rated output power above the maximum required power of the pump, input voltage 380-400volts,50Hz, Set 1
PF > 0.84 and motor efficiency>82%,with thermal sensors –PT 100. The pump have to deliver 17 l/s at Total
Head =195m. Pump sitting =114m,Well casing diameter = 10” and water temperature up to 50 oC.

supply and install Stainless steel Cooling sleeve of 203mm for submersible motor with all accessories if
3
required. set 1
Electric Power Control, Switch and Distribution Board:
Supply, Install, Connect and complete in place and perfect operational manner a 400V,50Hz main power
control switch and distribution board , factory made with Auto-transformer starter , Electronic Monitoring
and Protection Unit , including dry running protection relaty ,and all classic protections and measurements as
4
shown in technical specification.• The Minimum output of the Switchboard shall be rated at least 10% above Set 1
the maximum required power of the motor.

Power cable (all copper wires) :Submersible feeding cable, size 3x 35 mm2 with termination kits and
5 bonds ,Cable joint (shrink type). . m 130
6 Dry running electrodes with submersible monitoring cable of suitable size and 130 m length. Set 1
UPVC Riser Pipe (Column Pipe): Supply and install square threaded riser Pipe DN 4” ,3m length with ,pump
7 guard set, pipe lifting and tightenings tools and all required accessories. PC 38
8 UPVC Couplers/Joints for above item with o rings (riser pipes) PC 38
9 4" stainless steel top adaptor to be used for connecting the riser pipes with bend fittings No. 1
10 4" stainless steel bottom adaptor to be used for connecting the riser pipes with the pump outlet No. 1
Heavy duty galvanized Surface Plate (well Head Cap) with 4" vertical connection and 4" horizontal
11 connection Pc 1
Coated carbon -steel or galvanized steel Water hammer pressure obsorber tank (surge tank) size: 750-1000 L
12 with all required connections,fittings ,pressure indicator and accessories set 1
13 4" double flanged water flowmeter set 1
14 4" flanged Non-return Valve set 1
15 4" flanged gate valve set 1
Supply and install a common analog pressure gauge (0- 20 bar) with all needed fittings and valves ,on the
16
discharge pipe directly near the well opening.
set 1
17 Repair kit for the pump set 1
18 Repair kit for the motor set 1
19 All necessary special tools for pump and motor set 1
Total of Bill of Well # 3 – US$
BOQ-Lot 4
Bill of Well # FW3
Item
Description Unit Qty. Unit Price (US$) Total (US$)
NO.
General Notes:
1.The price includes Supplying, deliver, testing, installing, and commissioning Submersible pumps units (bowel assembly, Motors, Cables, Control panel,
riser pipes ,..etc.) complete with all required connections and accessories including all works and material to connet the well discharge pipe to the public
network pipeline.
2. For well head chamber and piping works to network pipline :a). All fittings, valves and specials rated for PN 16.
b.) pipes,valves and fittings shall include all gaskets ,bolts and any materials and works to complete the job according to technical specifications and
drawings and the engineer's direction.
Dismantling: The contractor has to carefully dismantle and remove all the existing equipment inside the well
hole (pump,motor,riser pipes,cables,valves,water meters,fittings,...etc) and any parts on well site and inside
control room have to be removed and delivered as instructed by the suppervised engineer . The work shall also
include all needed equipment ( crane, trucks,tools ... etc.) to complete the work as required.The contractor will
1
be required to replace any item which will get damaged during the work process by an equal one at no extra LS 1
cost to the owner or UNOPS. The rate includes delivery of dismantled material to client (HWSLC) storage area
or disposal to an approved dumping location . All works should be done in close coordination with
client(HWSLC) and the engineer.

Submersible Motor Pump Set: Supply, install and operate a new submersible pump with all the accessories it
needs to get a working system. The submersible pump have to be with non-return flow valve , pump efficiency
> 70% at design point, driven by a heavy duty submersible three phase induction motor with at least 60%
2
rated output power above the maximum required power of the pump, input voltage 380-400volts,50Hz, Set 1
PF > 0.84 and motor efficiency>82%,with thermal sensors –PT 100. The pump have to deliver 17 l/s at Total
Head =195m. Pump sitting =78m,Well casing diameter = 10” and water temperature up to 70 oC .

supply and install Stainless steel Cooling sleeve of 203mm for submersible motor with all accessories if
3
required. set 1
Electric Power Control, Switch and Distribution Board:
Supply, Install, Connect and complete in place and perfect operational manner a 400V,50Hz main power
control switch and distribution board , factory made with Auto-transformer starter , Electronic Monitoring
and Protection Unit , including dry running protection relaty ,and all classic protections and measurements as
4
shown in technical specification.• The Minimum output of the Switchboard shall be rated at least 10% above Set 1
the maximum required power of the motor.

Power cable (all copper wires) :Submersible feeding cable, single core size 50 mm2 with termination kits and
5 bonds ,Cable joint (shrink type). . m 279
6 Dry running electrodes with submersible monitoring cable of suitable size and 93 m length. Set 1
UPVC Riser Pipe (Column Pipe): Supply and install square threaded riser Pipe DN 4” ,3m length with ,pump
7 guard set, pipe lifting and tightenings tools and all required accessories. PC 26
8 UPVC Couplers/Joints for above item with o rings (riser pipes) PC 26
9 4" stainless steel top adaptor to be used for connecting the riser pipes with bend fittings No. 1
10 4" stainless steel bottom adaptor to be used for connecting the riser pipes with the pump outlet No. 1
Heavy duty galvanized Surface Plate (well Head Cap) with 4" vertical connection and 4" horizontal
11 connection Pc 1
Coated carbon -steel or galvanized steel Water hammer pressure obsorber tank (surge tank) size: 750-1000 L
12 with all required connections,fittings ,pressure indicator and accessories set 1
13 4" double flanged water flowmeter set 1
14 4" flanged Non-return Valve set 1
15 4" flanged gate valve set 1
Supply and install a common analog pressure gauge (0- 20 bar) with all needed fittings and valves ,on the
16
discharge pipe directly near the well opening.
set 1
17 Repair kit for the pump set 1
18 Repair kit for the motor set 1
19 All necessary special tools for pump and motor set 1
Total of Bill of Well # FW3 – US$
BOQ-Lot 5
Bill of Well # 1 , Muharram Well field (H‫لمحرم‬HH‫)حقلا‬
Item
Description Unit Qty. Unit Price (US$) Total (US$)
NO.
General Notes:
1.The price includes Supplying, deliver, testing, installing, and commissioning Submersible pumps units (bowel assembly, Motors, Cables, Control panel,
riser pipes ,..etc.) complete with all required connections and accessories including all works and material to connet the well discharge pipe to the public
network pipeline.
2. For well head chamber and piping works to network pipline :a). All fittings, valves and specials rated for PN 16.
b.) pipes,valves and fittings shall include all gaskets ,bolts and any materials and works to complete the job according to technical specifications and
drawings and the engineer's direction.
Dismantling: The contractor has to carefully dismantle and remove all the existing equipment inside the well
hole (pump,motor,riser pipes,cables,valves,water meters,fittings,...etc) and any parts on well site and inside
control room have to be removed and delivered as instructed by the suppervised engineer . The work shall also
include all needed equipment ( crane, trucks,tools ... etc.) to complete the work as required.The contractor will
1
be required to replace any item which will get damaged during the work process by an equal one at no extra LS 1
cost to the owner or UNOPS. The rate includes delivery of dismantled material to client (HWSLC) storage area
or disposal to an approved dumping location . All works should be done in close coordination with
client(HWSLC) and the engineer.

supply and install Stainless steel Cooling sleeve of 203mm for submersible motor with all accessories if
2
required. set 1

Submersible Motor Pump Set: Supply, install and operate a new submersible pump with all the accessories it
needs to get a working system. The submersible pump have to be with non-return flow valve , pump efficiency
> 70% at design point, driven by a heavy duty submersible three phase induction motor with at least 30%
3
rated output power above the maximum required power of the pump, input voltage 380-400volts,50Hz, Set 1
PF > 0.84 and motor efficiency>82%,with thermal sensors –PT 100. The pump have to deliver 17 l/s at Total
Head =165m. Pump sitting =50m,Well casing diameter = 10” and water temperature up to 50 oC .

Electric Power Control, Switch and Distribution Board:


Supply, Install, Connect and complete in place and perfect operational manner a 400V,50Hz main power
control switch and distribution board , factory made with Auto-transformer starter , Electronic Monitoring
and Protection Unit , including dry running protection relaty ,and all classic protections and measurements as
4
shown in technical specification.• The Minimum output of the Switchboard shall be rated at least 10% above Set 1
the maximum required power of the motor.

Power cable (all copper wires) :Submersible feeding cable, size 3x16 mm2 with termination kits and bonds
5 ,Cable joint (shrink type). . m 65
6 Dry running electrodes with submersible monitoring cable of suitable size and 65 m length. Set 1
UPVC Riser Pipe (Column Pipe): Supply and install square threaded riser Pipe DN 4” ,3m length with ,pump
7 guard set, pipe lifting and tightenings tools and all required accessories. PC 17
8 UPVC Couplers/Joints for above item with o rings (riser pipes) PC 17
9 4" stainless steel top adaptor to be used for connecting the riser pipes with bend fittings No. 1
10 4" stainless steel bottom adaptor to be used for connecting the riser pipes with the pump outlet No. 1
Heavy duty galvanized Surface Plate (well Head Cap) with 4" vertical connection and 4" horizontal
11 connection Pc 1
Coated carbon -steel or galvanized steel Water hammer pressure obsorber tank (surge tank) size: 750-1000 L
12 with all required connections,fittings ,pressure indicator and accessories set 1
13 4" double flanged water flowmeter set 1
14 4" flanged Non-return Valve set 1
15 4" flanged gate valve set 1
Supply and install a common analog pressure gauge (0- 20 bar) with all needed fittings and valves ,on the
16
discharge pipe directly near the well opening.
set 1
17 Repair kit for the pump set 1
18 Repair kit for the motor set 1
19 All necessary special tools for pump and motor set 1
Total of Bill of Well # 1 (‫ – ) حـقلمحرم‬US$
BOQ-Lot 6
Bill of Well # 2 ( Muharram Well field )H‫)حقلمحرم‬
Item
Description Unit Qty. Unit Price (US$) Total (US$)
NO.
General Notes:
1.The price includes Supplying, deliver, testing, installing, and commissioning Submersible pumps units (bowel assembly, Motors, Cables, Control panel,
riser pipes ,..etc.) complete with all required connections and accessories including all works and material to connet the well discharge pipe to the public
network pipeline.
2. For well head chamber and piping works to network pipline :a). All fittings, valves and specials rated for PN 16.
b.) pipes,valves and fittings shall include all gaskets ,bolts and any materials and works to complete the job according to technical specifications and
drawings and the engineer's direction.
Dismantling: The contractor has to carefully dismantle and remove all the existing equipment inside the well
hole (pump,motor,riser pipes,cables,valves,water meters,fittings,...etc) and any parts on well site and inside
control room have to be removed and delivered as instructed by the suppervised engineer . The work shall also
include all needed equipment ( crane, trucks,tools ... etc.) to complete the work as required.The contractor will
1
be required to replace any item which will get damaged during the work process by an equal one at no extra LS 1
cost to the owner or UNOPS. The rate includes delivery of dismantled material to client (HWSLC) storage area
or disposal to an approved dumping location . All works should be done in close coordination with
client(HWSLC) and the engineer.

Submersible Motor Pump Set: Supply, install and operate a new submersible pump with all the accessories it
needs to get a working system. The submersible pump have to be with non-return flow valve , pump efficiency
> 70% at design point, driven by a heavy duty submersible three phase induction motor with at least 60%
2
rated output power above the maximum required power of the pump, input voltage 380-400volts,50Hz, Set 1
PF > 0.84 and motor efficiency>82%,with thermal sensors –PT 100. The pump have to deliver 17 l/s at Total
Head =165m. Pump sitting =108m,Well casing diameter = 10” and water temperature up to 70 oC .

supply and install Stainless steel Cooling sleeve of 203mm for submersible motor with all accessories if
3
required. set 1
Electric Power Control, Switch and Distribution Board:
Supply, Install, Connect and complete in place and perfect operational manner a 400V,50Hz main power
control switch and distribution board , factory made with Auto-transformer starter , Electronic Monitoring
and Protection Unit , including dry running protection relaty ,and all classic protections and measurements as
4
shown in technical specification.• The Minimum output of the Switchboard shall be rated at least 10% above Set 1
the maximum required power of the motor.

Power cable (all copper wires) :Submersible feeding cable, single core size 50 mm2 with termination kits and
5 bonds ,Cable joint (shrink type). . m 369
6 Dry running electrodes with submersible monitoring cable of suitable size and 123 m length. Set 1
UPVC Riser Pipe (Column Pipe): Supply and install square threaded riser Pipe DN 4” ,3m length with ,pump
7 guard set, pipe lifting and tightenings tools and all required accessories. PC 36
8 UPVC Couplers/Joints for above item with o rings (riser pipes) PC 36
9 4" stainless steel top adaptor to be used for connecting the riser pipes with bend fittings No. 1
10 4" stainless steel bottom adaptor to be used for connecting the riser pipes with the pump outlet No. 1
Heavy duty galvanized Surface Plate (well Head Cap) with 4" vertical connection and 4" horizontal
11 connection Pc 1
Coated carbon -steel or galvanized steel Water hammer pressure obsorber tank (surge tank) size: 750-1000 L
12 with all required connections,fittings ,pressure indicator and accessories set 1
13 4" double flanged water flowmeter set 1
14 4" flanged Non-return Valve set 1
15 4" flanged gate valve set 1
Supply and install a common analog pressure gauge (0- 20 bar) with all needed fittings and valves ,on the
16
discharge pipe directly near the well opening.
set 1
17 Repair kit for the pump set 1
18 Repair kit for the motor set 1
19 All necessary special tools for pump and motor set 1
Total of Bill of Well # 2 (‫ – ) حـقلمحرم‬US$
BOQ-Lot 7
Bill of Well # FW10
Item
Description Unit Qty. Unit Price (US$) Total (US$)
NO.
General Notes:
1.The price includes Supplying, deliver, testing, installing, and commissioning Submersible pumps units (bowel assembly, Motors, Cables, Control panel,
riser pipes ,..etc.) complete with all required connections and accessories including all works and material to connet the well discharge pipe to the public
network pipeline.
2. For well head chamber and piping works to network pipline :a). All fittings, valves and specials rated for PN 16.
b.) pipes,valves and fittings shall include all gaskets ,bolts and any materials and works to complete the job according to technical specifications and
drawings and the engineer's direction.
Dismantling: The contractor has to carefully dismantle and remove all the existing equipment inside the well
hole (pump,motor,riser pipes,cables,valves,water meters,fittings,...etc) and any parts on well site and inside
control room have to be removed and delivered as instructed by the suppervised engineer . The work shall also
include all needed equipment ( crane, trucks,tools ... etc.) to complete the work as required.The contractor will
1
be required to replace any item which will get damaged during the work process by an equal one at no extra LS 1
cost to the owner or UNOPS. The rate includes delivery of dismantled material to client (HWSLC) storage area
or disposal to an approved dumping location . All works should be done in close coordination with
client(HWSLC) and the engineer.

Submersible Motor Pump Set: Supply, install and operate a new submersible pump with all the accessories it
needs to get a working system. The submersible pump have to be with non-return flow valve , pump efficiency
> 70% at design point, driven by a heavy duty submersible three phase induction motor with at least 30%
2
rated output power above the maximum required power of the pump, input voltage 380-400volts,50Hz, Set 1
PF > 0.84 and motor efficiency>82%,with thermal sensors –PT 100. The pump have to deliver 13 l/s at Total
Head =200m. Pump sitting =114m,Well casing diameter = 10” and water temperature up to 50 oC .

supply and install Stainless steel Cooling sleeve of 203mm for submersible motor with all accessories if
3
required. set 1
Electric Power Control, Switch and Distribution Board:
Supply, Install, Connect and complete in place and perfect operational manner a 400V,50Hz main power
control switch and distribution board , factory made with Auto-transformer starter , Electronic Monitoring
and Protection Unit , including dry running protection relaty ,and all classic protections and measurements as
4
shown in technical specification.• The Minimum output of the Switchboard shall be rated at least 10% above Set 1
the maximum required power of the motor.

Power cable (all copper wires) :Submersible feeding cable, size 3X25 mm2 with termination kits and
5 bonds ,Cable joint (shrink type). . m 130
6 Dry running electrodes with submersible monitoring cable of suitable size and 130 m length. Set 1
UPVC Riser Pipe (Column Pipe): Supply and install square threaded riser Pipe DN 4” ,3m length with ,pump
7 guard set, pipe lifting and tightenings tools and all required accessories. PC 38
8 UPVC Couplers/Joints for above item with o rings (riser pipes) PC 38
9 4" stainless steel top adaptor to be used for connecting the riser pipes with bend fittings No. 1
10 4" stainless steel bottom adaptor to be used for connecting the riser pipes with the pump outlet No. 1
Heavy duty galvanized Surface Plate (well Head Cap) with 4" vertical connection and 4" horizontal
11 connection Pc 1
Coated carbon -steel or galvanized steel Water hammer pressure obsorber tank (surge tank) size: 750-1000 L
12 with all required connections,fittings ,pressure indicator and accessories set 1
13 4" double flanged water flowmeter set 1
14 4" flanged Non-return Valve set 1
15 4" flanged gate valve set 1
Supply and install a common analog pressure gauge (0- 20 bar) with all needed fittings and valves ,on the
16
discharge pipe directly near the well opening.
set 1
17 Repair kit for the pump set 1
18 Repair kit for the motor set 1
19 All necessary special tools for pump and motor set 1
Total of Bill of Well # FW10 – US$
BOQ-Lot 8
Bill of Well # ZW6
Item
Description Unit Qty. Unit Price (US$) Total (US$)
NO.
General Notes:
1.The price includes Supplying, deliver, testing, installing, and commissioning Submersible pumps units (bowel assembly, Motors, Cables, Control panel,
riser pipes ,..etc.) complete with all required connections and accessories including all works and material to connet the well discharge pipe to the public
network pipeline.
2. For well head chamber and piping works to network pipline :a). All fittings, valves and specials rated for PN 16.
b.) pipes,valves and fittings shall include all gaskets ,bolts and any materials and works to complete the job according to technical specifications and
drawings and the engineer's direction.
Dismantling: The contractor has to carefully dismantle and remove all the existing equipment inside the well
hole (pump,motor,riser pipes,cables,valves,water meters,fittings,...etc) and any parts on well site and inside
control room have to be removed and delivered as instructed by the suppervised engineer . The work shall also
include all needed equipment ( crane, trucks,tools ... etc.) to complete the work as required.The contractor will
1
be required to replace any item which will get damaged during the work process by an equal one at no extra LS 1
cost to the owner or UNOPS. The rate includes delivery of dismantled material to client (HWSLC) storage area
or disposal to an approved dumping location . All works should be done in close coordination with
client(HWSLC) and the engineer.

Submersible Motor Pump Set: Supply, install and operate a new submersible pump with all the accessories it
needs to get a working system. The submersible pump have to be with non-return flow valve , pump efficiency
> 70% at design point, driven by a heavy duty submersible three phase induction motor with at least 60%
2
rated output power above the maximum required power of the pump, input voltage 380-400volts,50Hz, Set 1
PF > 0.84 and motor efficiency>82%,with thermal sensors –PT 100. The pump have to deliver 13 l/s at Total
Head =200m. Pump sitting =138m,Well casing diameter = 12” and water temperature up to 70 oC .

3 supply and install Stainless steel Cooling sleeve for submersible motor with all accessories No. 1
Electric Power Control, Switch and Distribution Board:
Supply, Install, Connect and complete in place and perfect operational manner a 400V,50Hz main power
control switch and distribution board , factory made with Auto-transformer starter , Electronic Monitoring
and Protection Unit , including dry running protection relaty ,and all classic protections and measurements as
4
shown in technical specification.• The Minimum output of the Switchboard shall be rated at least 10% above Set 1
the maximum required power of the motor.

Power cable (all copper wires) :Submersible feeding cable, single core size 70 mm2 with termination kits and
5 bonds ,Cable joint (shrink type). . m 469
6 Dry running electrodes with submersible monitoring cable of suitable size and 153m length. Set 1
UPVC Riser Pipe (Column Pipe): Supply and install square threaded riser Pipe DN 4” ,3m length with ,pump
7 guard set, pipe lifting and tightenings tools and all required accessories. PC 46
8 UPVC Couplers/Joints for above item with o rings (riser pipes) PC 46
9 4" stainless steel top adaptor to be used for connecting the riser pipes with bend fittings No. 1
10 4" stainless steel bottom adaptor to be used for connecting the riser pipes with the pump outlet No. 1
Heavy duty galvanized Surface Plate (well Head Cap) with 4" vertical connection and 4" horizontal
11 connection Pc 1
Coated carbon -steel or galvanized steel Water hammer pressure obsorber tank (surge tank) size: 750-1000 L
12 with all required connections,fittings ,pressure indicator and accessories set 1
13 4" double flanged water flowmeter set 1
14 4" flanged Non-return Valve set 1
15 4" flanged gate valve set 1
Supply and install a common analog pressure gauge (0- 20 bar) with all needed fittings and valves ,on the
16
discharge pipe directly near the well opening. Set 1
17 Repair kit for the pump set 1
18 Repair kit for the motor Set 1
19 All necessary special tools for pump and motor set 1
Total of Bill of Well # ZW6 – US$
BOQ-Lot 9
Bill of Well # 1 (‫لة‬HHH‫ حقلث‬Thalla well field )
Item
Description Unit Qty. Unit Price (US$) Total (US$)
NO.
General Notes:
1.The price includes Supplying, deliver, testing, installing, and commissioning Submersible pumps units (bowel assembly, Motors, Cables, Control panel,
riser pipes ,..etc.) complete with all required connections and accessories including all works and material to connet the well discharge pipe to the public
network pipeline.
2. For well head chamber and piping works to network pipline :a). All fittings, valves and specials rated for PN 16.
b.) pipes,valves and fittings shall include all gaskets ,bolts and any materials and works to complete the job according to technical specifications and
drawings and the engineer's direction.
Dismantling: The contractor has to carefully dismantle and remove all the existing equipment inside the well
hole (pump,motor,riser pipes,cables,valves,water meters,fittings,...etc) and any parts on well site and inside
control room have to be removed and delivered as instructed by the suppervised engineer . The work shall also
include all needed equipment ( crane, trucks,tools ... etc.) to complete the work as required.The contractor will
1
be required to replace any item which will get damaged during the work process by an equal one at no extra LS 1
cost to the owner or UNOPS. The rate includes delivery of dismantled material to client (HWSLC) storage area
or disposal to an approved dumping location . All works should be done in close coordination with
client(HWSLC) and the engineer.

Submersible Motor Pump Set: Supply, install and operate a new submersible pump with all the accessories it
needs to get a working system. The submersible pump have to be with non-return flow valve , pump efficiency
> 70% at design point, driven by a heavy duty submersible three phase induction motor with at least 30%
2
rated output power above the maximum required power of the pump, input voltage 380-400volts,50Hz, Set 1
PF > 0.84 and motor efficiency>82%,with thermal sensors –PT 100. The pump have to deliver 22 l/s at Total
Head =145m. Pump sitting =108m,Well casing diameter = 10” and water temperature up to 50 oC.

Electric Power Control, Switch and Distribution Board:


Supply, Install, Connect and complete in place and perfect operational manner a 400V,50Hz main power
control switch and distribution board , factory made with Auto-transformer starter , Electronic Monitoring
and Protection Unit , including dry running protection relaty ,and all classic protections and measurements as
3
shown in technical specification.• The Minimum output of the Switchboard shall be rated at least 10% above Set 1
the maximum required power of the motor.

Power cable (all copper wires) :Submersible feeding cable, size 3x35 mm2 with termination kits and bonds
4 ,Cable joint (shrink type). . m 123
5 Dry running electrodes with submersible monitoring cable of suitable size and 123 m length. Set 1
UPVC Riser Pipe (Column Pipe): Supply and install square threaded riser Pipe DN 4” ,3m length with ,pump
6 guard set, pipe lifting and tightenings tools and all required accessories. PC 36
7 UPVC Couplers/Joints for above item with o rings (riser pipes) PC 36
8 4" stainless steel top adaptor to be used for connecting the riser pipes with bend fittings No. 1
9 4" stainless steel bottom adaptor to be used for connecting the riser pipes with the pump outlet No. 1
Heavy duty galvanized Surface Plate (well Head Cap) with 4" vertical connection and 4" horizontal
10 connection Pc 1
Coated carbon -steel or galvanized steel Water hammer pressure obsorber tank (surge tank) size: 750-1000 L
11 with all required connections,fittings ,pressure indicator and accessories set 1
12 4" double flanged water flowmeter set 1
13 4" flanged Non-return Valve set 1
14 4" flanged gate valve set 1
Supply and install a common analog pressure gauge (0- 20 bar) with all needed fittings and valves ,on the
15
discharge pipe directly near the well opening. set 1
16 Repair kit for the pump set 1
17 Repair kit for the motor set 1
18 All necessary special tools for pump and motor set 1
Total of Bill of Well # 1(‫ثــ‬
‫ – ) حـقل لة‬US$
BOQ-Lot 10
Bill of Well # 2 (‫لة‬FF‫قلث‬F‫ ح‬Thalla well field )
Item
Description Unit Qty. Unit Price (US$) Total (US$)
NO.
General Notes:
1.The price includes Supplying, deliver, testing, installing, and commissioning Submersible pumps units (bowel assembly, Motors, Cables, Control panel,
riser pipes ,..etc.) complete with all required connections and accessories including all works and material to connet the well discharge pipe to the public
network pipeline.
2. For well head chamber and piping works to network pipline :a). All fittings, valves and specials rated for PN 16.
b.) pipes,valves and fittings shall include all gaskets ,bolts and any materials and works to complete the job according to technical specifications and
drawings and the engineer's direction.
Dismantling: The contractor has to carefully dismantle and remove all the existing equipment inside the well
hole (pump,motor,riser pipes,cables,valves,water meters,fittings,...etc) and any parts on well site and inside
control room have to be removed and delivered as instructed by the suppervised engineer . The work shall also
include all needed equipment ( crane, trucks,tools ... etc.) to complete the work as required.The contractor will
1
be required to replace any item which will get damaged during the work process by an equal one at no extra LS 1
cost to the owner or UNOPS. The rate includes delivery of dismantled material to client (HWSLC) storage area
or disposal to an approved dumping location . All works should be done in close coordination with
client(HWSLC) and the engineer.

Submersible Motor Pump Set: Supply, install and operate a new submersible pump with all the accessories it
needs to get a working system. The submersible pump have to be with non-return flow valve , pump efficiency
> 70% at design point, driven by a heavy duty submersible three phase induction motor with at least 30%
2
rated output power above the maximum required power of the pump, input voltage 380-400volts,50Hz, Set 1
PF > 0.84 and motor efficiency>82%,with thermal sensors –PT 100. The pump have to deliver 22 l/s at Total
Head =180m. Pump sitting =132m,Well casing diameter = 10” and water temperature up to 50 oC .

Electric Power Control, Switch and Distribution Board:


Supply, Install, Connect and complete in place and perfect operational manner a 400V,50Hz main power
control switch and distribution board , factory made with Auto-transformer starter , Electronic Monitoring
and Protection Unit , including dry running protection relaty ,and all classic protections and measurements as
3
shown in technical specification.• The Minimum output of the Switchboard shall be rated at least 10% above Set 1
the maximum required power of the motor.

Power cable (all copper wires) :Submersible feeding cable, single core size 50 mm2 with termination kits and
4 bonds ,Cable joint (shrink type). . m 450
5 Dry running electrodes with submersible monitoring cable of suitable size and 150 m length. Set 1
UPVC Riser Pipe (Column Pipe): Supply and install square threaded riser Pipe DN 4” ,3m length with ,pump
6 guard set, pipe lifting and tightenings tools and all required accessories. PC 44
7 UPVC Couplers/Joints for above item with o rings (riser pipes) PC 44
8 4" stainless steel top adaptor to be used for connecting the riser pipes with bend fittings No. 1
9 4" stainless steel bottom adaptor to be used for connecting the riser pipes with the pump outlet No. 1
Heavy duty galvanized Surface Plate (well Head Cap) with 4" vertical connection and 4" horizontal
10 connection Pc 1
Coated carbon -steel or galvanized steel Water hammer pressure obsorber tank (surge tank) size: 750-1000 L
11 with all required connections,fittings ,pressure indicator and accessories set 1
12 4" double flanged water flowmeter set 1
13 4" flanged Non-return Valve set 1
14 4" flanged gate valve set 1
Supply and install a common analog pressure gauge (0- 20 bar) with all needed fittings and valves ,on the
15
discharge pipe directly near the well opening. set 1
16 Repair kit for the pump set 1
17 Repair kit for the motor set 1
18 All necessary special tools for pump and motor set 1
Total of Bill of Well # 2 (‫لةـ‬