g TERMINATION POINTS
Turbine Boiler Feed Pump-TD HPT200-330/6S These nozzle location please TP No. SERVICE DESCIPTION CONNECTION MATERIAL
g
40LAC21AP001 / 40LAC22AP001 TP1 BOILER FEED PUMP SUCTION Φ323.8x17.45 E7018 EBL
see detail B comments.
TP2 BOILER FEED PUMP DELIVERY Φ323.8x33.3 TENACITO 65 EBL
TP3 NTERMEDIATE TAKE OFF Φ114.3x17.15 E7018 EBL
g
Removal space: ~3400mm
View A TP4 BOILER FEED PUMP VENT DN40(1.5"),RF,600#,WN A105
weight :~4050 Kg TP5 BFP BALANCE DRUM OUTLET DN65(2.5"),RF,600#,WN A105
2665 700 700
Note : this is pump cartridge (Sulzer Scope)
DBSE It is part of the pump body, here only for TP6 FEED PUMP SEAL COOLING MEDIUM SUPPLY DN50(2"),RF,150#,SW A105
350 730 741 ~1194 the image to signal it
TP7 FEED PUMP SEAL COOLING MEDIUM RETURN DN50(2"),RF,150#,SW A105
(Recommendation)
TP3 45° TP10 FEED PUMP LUBE OIL RETURN DN100(4"),RF,150#,WN 304 SS
45°
A BRANC ES DISPLACEMENT
FEED PUMP (D t t o )
Nozzles on down-down
g g (Turbine driven BFP) FEED
DT= 160 ℃
~742
655
DX DY D
Turbine Shaft End Z
235
235
Mx
X ITO-B +1.69 +0.84 +0.84
755
755
ALLOWABLE FORCES ON BRANC ES N,N
860
Second Grouting
+tbam 1235
765 765
150
C tt or e Vert or e F ex o o e t Tor o o e t
20
Fx=Fy Fz Mx=My Mz
20
100
TP1
70
70
SUCTION 20600 38400 7500 15500
TP2 Grounding
Grounding
Grounding
DISC ARGE 65500 122000 21500 44800
475 Grounding
842
3 MAXIMUM LOAD PER BOLT (kN) 3
Rx Ry Rz
1.MASS(Dry) -11.38
2.MASS(Wet) -11.72
3.TORQUE ±2.02
300
300
2450 g Rx Ry Rz
Boiler Feed Pump Suction Boiler Feed Pump Discharge Boiler Feed Pump ITO WEIGHT(DRY) WEIGHT(WET)CARTRIDGE WEIGHT
M
R
m
925 925 MOMENT INERTIA
NO LE ±14.62 ±14.42 ±48.19
KG KG KG ² KG. ²
E7018 Electrode list of pull spaces and weight for required maintenance
Butter Layer FEED PUMP 6850 7150 4050 2.84 Cartridge weight Cartridge removal spaces
Ø129.5 Pump 4050 Kg ~3400 mm
BASE PLATE 3550 - - -
CIVIL
Ø114.3 CONTRACTOR DOCUMENT REVIEW
2 AUXILIARIES 1200 1250 - -
R MECH 2
Ø80 E
LOG DATE : V ELECT
1.6 I
E
BFP Discharge
IN COMM NO : I&C
BFP Suction
+tbam
60
TOTAL 11600 11950 - - W
60
10°
°
3 7 .5
A APPROVED SUPPORT
°
550
°
37.5
3 7 .5
B APPROVED AS NOTED CONTRACTOR
14.07
10°
°
°
60
°
Detail B C NOT APPROVED RECORD
9.13
D
1.6
8.79
I
Y 1.6 TDPA: TDPB:
I INFORMATION
S
WORKING DOCUMENT
Ø257.2 T
Ø288.9 Left side from pump to turbine view Right side from pump to turbine view APPROVAL DOES NOT RELIEVE CONTRACTOR R
Ø295.2 Sulzer WBS:100241334-0010 Sulzer WBS:100241334-0010 FROM RESPONSIBILITY FOR ERROR OR I
B
1730(Baseplate Width)
I
BY DATE : O
E7018 Electrode TENACITO 65 N
+0.000m Butter Layer Electrode Butter Layer LOG DATE :
2230
600
530
X OUT COMM NO :
00 0 0 Attention :
R3 The reducers connected pump suction /discharge/ ITO are not Sulzer's scope.
63
8
8
63
Suggest: Before the water pump unit is installed to the foundation, the suction, discharge
1 01-JULY-2017 UPDATED FOR OWNER APPROVAL V.ZHANG L.FU D.ZOU
and ITO reducers need to be welded to the pump. 0 C 12-MAY-2017 ISSUED FOR OWNER APPROVAL V.ZHANG L.FU D.ZOU
1
Earth grounding schematic
(without scale) General Note: LONTAR EXTENSION
02/2012
Bolt M10×50 COAL FIRED STEAM POWER PLANT (1X315MW)
(Copper) 1, All dimensions unit showed are mm ;
Nut M10 2, Minimum maintenance service spaces is more than 1.5m to nearest obstacles;
525 741 (Copper)
1 3, The Pump center elevation need according to the centerline height of turbine ; 1
Earth Boss SPEC TITLE Boiler Feed Water Pump
(SS304) 4, The revised parts see the mark symbol;
841x1189
Modification-According to owner's Victor Zhang Fu Lihua Daniel Zou SPEC N O. 189963.67.9271
g
5, This figure signal way of lifting are only for reference, comments(2017.06.06) 2017.07.01 2017.07.01 2017.07.01 Modify according to BV 2016.11.17 2016.11.17 2016.11.17
final selection should be accord with local existing lifting equipment ; Change Language(delete chinese) Victor Zhang Fu Lihua Daniel Zou a comments(2016.11.15)
Victor Zhang Fu Lihua Daniel Zou
1950(Baseplate Length) f
Pump Base plate 6, Lifting gear are not in Sulzer scope of supply 2017.05.05 2017.05.05 2017.05.05 REV. MODIFICATION MODIFIED CHECKED APPROVED
Modification-According to BV''s Victor Zhang Fu Lihua Daniel Zou SEP. PARTS LIST: - FORMAT A0 DESIGN GROUP
SULZER PUMPS SUZHOU LTD FIRST ANGLE PROJECTION
MAIN PUMP e comments(2017.01.09) REPLACED BY: - SUBSTITUTE FOR: - ORIGINAL SCALE: 1:1
2017.02.03 2017.02.03 2017.02.03
742
655
4 TP9 FEED PUMP LUBE OIL SUPPLY DN50(2"),RF,150#,WN 304 SS 4
8
63
TP9
255
255
525
525
555
555
555
Please provide part list related to this drawing.
720
755
775
775
660
TP9
860
2.3°
TP10 TP5
TP10
TP7 TP6
TP5
TP1 TP2 TP8 TP8
554
1174
1000 920
1208 1100
3 3
TP7
TP6
TP8
1208
CIVIL
CONTRACTOR DOCUMENT REVIEW
2 R 2
1000
MECH
E
LOG DATE : V ELECT
I
IN COMM NO : E I&C
W
A APPROVED SUPPORT
605
OUT COMM NO :
915
920
CONTRACT NO : 0436.PJ/DAN.02.01/DIR/2015
TP10 TP5
LONTAR EXTENSION
1250 COAL FIRED STEAM POWER PLANT (1X315MW)
1 1
1690 SPEC T ITL E Boiler Feed Water Pump
Modification-According to owner's Victor Zhang Fu Lihua Daniel Zou 189963.67.9271
g SPEC N O.
comments(2017.06.06) 2017.07.01 2017.07.01 2017.07.01 Modify according to BV 2016.11.17 2016.11.17 2016.11.17
Change Language(delete chinese) Victor Zhang Fu Lihua Daniel Zou a comments(2016.11.15)
Victor Zhang Fu Lihua Daniel Zou
f
2017.05.05 2017.05.05 2017.05.05 REV. MODIFICATION MODIFIED CHECKED APPROVED
Modification-According to BV''s Victor Zhang Fu Lihua Daniel Zou SEP. PARTS LIST: - FORMAT A0 DESIGN GROUP
SULZER PUMPS SUZHOU LTD FIRST ANGLE PROJECTION
e comments(2017.01.09) REPLACED BY: - SUBSTITUTE FOR: - ORIGINAL SCALE: 1:1
2017.02.03 2017.02.03 2017.02.03
DRAWN: 2016.10.20
Modification-According to BV''s Victor Zhang Fu lihua Daniel Zou HPT OUTLINE DRAWING VICTOR ZHANG
d comments(2016.12.08
CERTIFIED FINAL DO NOT SCALE. DIMENSIONS ARE IN MM UNLESS OTHERWISE SPECIFIED. 2016.12.15 2016.12.15 2016.12.15 200-330-6s HPT-TD Pump CHECKED: 2016.10.20
Update Revision Victor Zhang Fu Lihua Daniel Zou Fu Lihua
Lontar Extension FEED WATER PUMP
CERTIFIED FOR NOZZLE & UNLESS OTHERWISE SPECIFIED TOLERANCES c APPROVED: 2016.10.20
2016.12.01 2016.12.01 2016.12.01
FOUNDATION ONLY ANCHOR HOLES LOCATION DIMENSIONS `5 100241334 - Daniel Zou
NOZZLES LOCATION DIMENSIONS `5 Modification Victor Zhang Fu Lihua Daniel Zou
PART NO.
PRELIMINARY ONLY b
OUTLINE&AUX CONNECTION DIMENSIONS `25 2016.11.22 2016.11.22 2016.11.22 890 ZH PGA1002413340010-01 2 / 2
F E D C B A