Appendix B: Reasons for Non-completion


To enable subsequent analysis reasons for non completion are categorised under
a relatively small number of generalised headings. Typically these may include:-

Directive - For example a required permit is not in place

Labour - Insufficient labour was available

Prerequisite - Something that needed to be in place wasn’t

Information - Drawings or specifications were not available

Material - The necessary material was not available

Site Access - The site was not ready

Plant - The necessary plant was being used elsewhere

Weather - The weather made work impossible

Unforeseen - An unforeseeable event prevented work