The document categorizes common reasons for non-completion of projects under general headings to enable subsequent analysis. These reasons include a lack of necessary permits, insufficient labor, unmet prerequisites, unavailable drawings or specifications, missing materials, unprepared sites, occupied plant equipment, inclement weather, and unforeseeable events that can prevent work.
The document categorizes common reasons for non-completion of projects under general headings to enable subsequent analysis. These reasons include a lack of necessary permits, insufficient labor, unmet prerequisites, unavailable drawings or specifications, missing materials, unprepared sites, occupied plant equipment, inclement weather, and unforeseeable events that can prevent work.
The document categorizes common reasons for non-completion of projects under general headings to enable subsequent analysis. These reasons include a lack of necessary permits, insufficient labor, unmet prerequisites, unavailable drawings or specifications, missing materials, unprepared sites, occupied plant equipment, inclement weather, and unforeseeable events that can prevent work.
To enable subsequent analysis reasons for non completion are categorised under a relatively small number of generalised headings. Typically these may include:-
Directive - For example a required permit is not in place
Labour - Insufficient labour was available
Prerequisite - Something that needed to be in place wasn’t
Information - Drawings or specifications were not available
Material - The necessary material was not available
Site Access - The site was not ready
Plant - The necessary plant was being used elsewhere
Weather - The weather made work impossible
Unforeseen - An unforeseeable event prevented work