Some equipment and machine should be repaired for smooth running of

“Electrical Machine Laboratory”

1. Mechanical coupling of 3 phase slip ring induction motor should be

changed.

2. Coil and insulation of 3 phase transformer set up (transformer B and C)


should be repaired
3. 3. Variac of a variable DC supply for motor armature field and excitation

control should be properly fixed to get the output voltage variation as per