Professional Documents
Culture Documents
SPC-PTSI-HSE-001-E
SPECIFICATION
Summary of Revisions
A. Spingardi
16/02/2016 01 HSE
HSES
A. Spingardi
02/09/2016 02 HSE
QHSES
Description of Revision 02
This document is the property of PT. Saipem Indonesia. All rights reserved.
Doc. no. SPC-PTSI-HSE-001-E
SPECIFICATION
TABLE OF CONTENTS
1. INTRODUCTION 4
1.1 OBJECTIVES OF THE DOCUMENT 4
1.2 AREA OF APPLICATION 4
1.3 REFERENCE DOCUMENTS 4
1.3.1 Internal references 4
1.3.2 External references 4
2. DEFINITION, ABBREVIATIONS AND ACRONYMS 4
2.1 DEFINITION 4
2.2 ABBREVIATIONS 5
3. HEALTH SAFETY AND ENVIRONMENTAL REQUIREMENTS 5
3.1 HSE GENERAL REQUIREMENTS 5
4. REQUIRED DOCUMENTS 6
4.1 COMPANY HSE REQUIREMENTS DOCUMENTS 6
4.2 HSE DOCUMENT T O BE PROVIDED DURING BIDDING STAGE 6
4.2.1 HSE Governance 6
4.2.2 Health and Safety Management 6
4.2.3 Health and Safety Past Performance 7
4.3 HSE DOCUMENT T O BE PROVIDED UPON CONTRACT AWARD 7
5. SPECIFIC HSE REQUIREMENTS DURING CONTRACT EXECUTION PHASE 7
5.1 LEADERSHIP 7
5.2 HSE ORGANISATION 7
5.3 ENTRY REQUIREMENT TO CONTRACTOR PREMISES 8
5.4 COMMENCEMENT OF THE WORK 8
6. APPENDIX A – KARIMUN YARD ENTRY HSE REQUIREMENTS 9
This document is the property of PT. Saipem Indonesia. All rights reserved.
Doc. no. SPC-PTSI-HSE-001-E
SPECIFICATION
1. INTRODUCTION
1.1 OBJECTIVES OF THE DOCUMENT
Purpose of this document is to define the minimum Health, Safety and Environmental (HSE) requirements to
be followed and applied by VENDOR and SUBCONTRACTOR (herein after SUBCON) during the execution
of their scope of work within PT. Saipem Indonesia Karimun Yard premises.
This document collects the main HSE requirements for SUBCON, while details are addressed within
Company HSE Management System (specific procedure/specification to provide upon request). This shall
not release SUBCON from its obligation to comply with the HSE requirements established within the contract
provisions.
Remains as obligation for SUBCON to ensure that adequate safety levels are maintained and environmental
impacts are monitored throughout the PROJECT execution.
SUBCON General abbreviation used to identify either Vendor and/or Subcontractor working
within Karimun Yard.
Subcontractor General term to define other companies providing services Saipem within
Karimun Yard on the basis of a contract, where Company has the responsibility to
set the HSE standards or to ensure that the Subcontractor’s HSE Management
System is in line with the Company’s HSE Management System.
This document is the property of PT. Saipem Indonesia. All rights reserved.
Doc. no. SPC-PTSI-HSE-001-E
SPECIFICATION
Vendor General term to define the vendors of good and/or package on the basis of a
contract, where Company doesn’t have the responsibility to set the HSE
standards, nor directly supervising the activities. The Vendor applies its own HSE
Management System. Whenever the Vendor requires to perform part of the
activities foreseen by the contract within Karimun Yard, it shall be considered as
Subcontractor.
2.2 ABBREVIATIONS
This document is the property of PT. Saipem Indonesia. All rights reserved.
Doc. no. SPC-PTSI-HSE-001-E
SPECIFICATION
k) The SUBCON shall immediately report every incident involving its personnel and/or equipment to
Saipem Representative. Then, the official event notification shall be issued not later than 24 hours after
the incident. The investigation shall be then carried out involving Saipem personnel.
l) The SUBCON working within Karimun Yard must attend Company induction program, which includes
instructions given to each new employee, regardless of prior experience.
m) SUBCON employees have to be trained to those subjects pertaining to local realities / threats / HSE risk
factors, in compliance with their professional position, and scheduled so as to provide a sufficient
number of First Aid trained personnel continuously available on site.
4. REQUIRED DOCUMENTS
4.1 COMPANY HSE REQUIREMENTS DOCUMENTS
The SUBCON is required to comply with the relevant HSE requirements documents submitted along to this
Specification, within the Scope of Work package. Here below the summary of Company HSE Specifications
which might be sent to the SUBCON based on its Scope of Work:
• HSE Requirements for Subcontractors – Low HSE Risk (Doc. No. SPC-COR-HSE-001-E)
• HSE Requirements for Subcontractors – High HSE Risk (Doc. No. SPC-COR-HSE-002-E)
• HSE Requirements for NDT Radiographic Activities (Doc. No. SPC-COR-HSE-006-E)
• HSE Requirements for Subcontractors for Fabrication Works (Doc. No. SPC-COR-HSE-007-E)
• Project HSE Requirements documents (Project based document list)
As per Company Work Instruction ‘HSE in Procurement’ (Doc. No. WI-PTSI-HSE-025-E), SUBCON
proposals shall be assessed during tendering stage, by compiling the HSE Bid Evaluation FORM (Doc. No.
FORM-PTSI-HSE-028-E).
This document is the property of PT. Saipem Indonesia. All rights reserved.
Doc. no. SPC-PTSI-HSE-001-E
SPECIFICATION
This document is the property of PT. Saipem Indonesia. All rights reserved.
Doc. no. SPC-PTSI-HSE-001-E
SPECIFICATION
This document is the property of PT. Saipem Indonesia. All rights reserved.
Doc. no. SPC-PTSI-HSE-001-E
SPECIFICATION
Name of Vendor :
Scope of Work :
Package Reference :
Working Duration :
Total of Manpower :
Email Submission
Detail Scope of Work Describing vendor sequence activities and scope of
3 Preferable to COMPANY
and Method Statement work to be performed in COMPANY premises.
HSE Dept.
This document is the property of PT. Saipem Indonesia. All rights reserved.
Doc. no. SPC-PTSI-HSE-001-E
SPECIFICATION
Full HSE Induction by entry point entity/Company. First day on site/on board.
Induction Training at
1 Only for those having Medical Fitness Conformance Assistances will be
Entry Point area
from COMPANY Doctor provided by COMPANY
C. PPE Requirement
Mandatory Standard PPE
EN 166 – EN 167 – EN 168 – EN 170 or ANSI/ISEA to be provided by
1 Eye Protection
Z87.1 SUBCON for any type of
activities
Mandatory Standard PPE
Safety shoes/boots with EN 20344 and EN 20345 to be provided by
2 Foot Protection
standard, Anti-Static Footwear for electrical works SUBCON for any type of
activities
Mandatory Standard PPE
3 Head Protection SUBCON Company logo and name shall be attached to be provided by
on the helmet. Requirement to be followed is SUBCON for any type of
This document is the property of PT. Saipem Indonesia. All rights reserved.
Doc. no. SPC-PTSI-HSE-001-E
SPECIFICATION
This document is the property of PT. Saipem Indonesia. All rights reserved.