The DILL and BWSSIII under the DGWR have a mandate to modernise the Gumbasa Irrigation
Project to improve water management across the full scheme area of 8,148 ha to provide an
irrigation service to resident farmers represented by water user associations (WUAs) also
known as the P3A. The scheme will be provided with an information technological water
management system IT-WMS also called a decision support system (DSS) in a control centre
that will monitor flows around the irrigation system in real time at main canal and secondary
canal control structures. The IT-WMS/DSS to be adopted is the DGWR standard. This system
requires these structures to be equipped with a variety of sensors linked by telemetry to the
IT-WMS system which can monitor and eventually control the system through a SCADA
system.
Direktorat Irigasi dan Rawa bersama Balai Wilayah Sungai Sulawesi-III di bawah Ditjen SDA
diberi mandat untuk melakukan modernisasi Proyek Irigasi Gumbasa guna meningkatkan
pengelolaan air di seluruh daerah irigasi seluas 8.148 ha untuk memberikan layanan irigasi
kepada petani setempat yang tergabung dalam asosiasi pengguna air atau P3A (Perkumpulan
Petani Pemakai Air). Daerah irigasi ini akan dilengkapi dengan sistem manajemen air
berteknologi informasi IT-WMS yang disebut sistem pendukung keputusan (DSS) di pusat
kontrol. Sistem ini akan memantau aliran di seluruh sistem irigasi secara tepat waktu (real
time) di saluran primer dan bangunan bagi saluran sekunder. IT-WMS/DSS yang akan
dipasang adalah standar DitJend SDA Kementerian PU-PR. Sistem ini akan melengkapi
seluruh bangunan tersebut dengan berbagai sensor yang dihubungkan oleh telemetri ke
sistem IT-WMS. Dengan demikian dapat memantau dan mengontrol operasi irigasi melalui
sistem SCADA.
It is recognised that the key management boundary is between BWSSIII, the service provider,
and the farmers, represented by the WUA. Flows at independent tertiary outlets (those not
associated with main canal cross regulators or secondary division structures) will be physically
monitored daily by juru in association with the WUA representative for water management.
The juru will be equipped with smartphones with an app that automatically downloads their
readings into control centres and motorcycles to optimise visits to tertiary outlets.
Seperti diketahui bahwa pengelola utama sistem irigasi adalah BWS-SIII sebagai penyedia
layanan, dan petani yang diwakili oleh P3A. Aliran di pintu tersier bebas (yang tidak terkait
dengan pintu air saluran primer atau sekunder) akan dipantau secara fisik setiap hari oleh juru
bekerja sama dengan perwakilan P3A untuk pengelolaan air. Juru/PPA akan dilengkapi
dengan smartphone dengan aplikasi otomasi yang dapat mengirimkan data/bacaan posisi
pintu tersier ke pusat kendali dan sepeda motor untuk optimalisasi perjalanan ke pintu tersier.
The objective of the system is to provide :
a. operational staff with near real-time data (on a daily basis) to provide knowledge-based
decisions and responses to rebalance flows to be more equitable.
INTERNAL. This information is accessible to ADB Management and staff. It may be shared outside ADB with appropriate permission.
Euroconsult Mott MacDonald Gumbasa Irrigation JV | SCADA and DSS Report
b. large amounts of data to allow more accurate statistical analysis and assessment of
performance management, to highlight problems and prioritise solutions into IT- asset
management planning;
c. a daily service/ client interface with farmer’s water management representatives to
provide trust in a reliable service and hence improved governance;
d. integration of agricultural data to discern the effectiveness of the IT-WMS;
e. installation of groundwater level sensors at several stations to analyze the potential for
liquefaction in the future.
Tujuan dari sistem ini adalah untuk menyediakan:
a. data harian (hampir real-time) untuk staf operasional guna memberikan keputusan
yang dapat dipertanggung-jawabkan untuk pengaturan pembagian (debit) air yang
adil;
b. data dalam jumlah besar untuk mendukung analisis statistik dan penilaian manajemen
kinerja yang lebih akurat, guna memahami masalah-masalah yang ada dan mencari
solusi dalam perencanaan manajemen asset berbasis teknologi informasi;
c. informasi kepada petani pengguna air / P3A yang dapat memberikan kepercayaan
terhadap layanan air yang handal, antara lain dengan peningkatan tata kelolanya;
d. integrasi data pertanian untuk melihat efektivitas IT-WMS;
e. Pemasangan sensor ketinggian air tanah di beberapa stasiun untuk menganalisis
potensi likuifaksi di masa mendatang.
1
The IT-WMS will be the DSS system which is recommended by the DILL.
INTERNAL. This information is accessible to ADB Management and staff. It may be shared outside ADB with appropriate permission.
Euroconsult Mott MacDonald Gumbasa Irrigation JV | SCADA and DSS Report
INTERNAL. This information is accessible to ADB Management and staff. It may be shared outside ADB with appropriate permission.
Euroconsult Mott MacDonald Gumbasa Irrigation JV | SCADA and DSS Report
INTERNAL. This information is accessible to ADB Management and staff. It may be shared outside ADB with appropriate permission.
Euroconsult Mott MacDonald Gumbasa Irrigation JV | SCADA and DSS Report
Appendix A provides:
a. The complex SCADA network shows tertiary units (i) Package 1 Headworks to BGKn6;
(ii) Package 2. BGKN 7 to BGkn 24 (iii) Package 3 BGKN 25 to BGKn 41 and (iv)
Package 4 BGKn 42 to BGkn 54; and (v) Package 5 (for BGkn 54 to BGKn 59).
b. Configuration of SCADA equipment and ancillary equipment at (i) a single gate with an
existing gate actuator requiring groundwater monitoring; (ii) at a single gate needing a
gate actuator; (iii) at a catchment area and a surface water distribution plot (iv) at a
liquefaction area;
c. The locations of observation wells to be brought into the DSS for monitoring (15 maps
observation wells and piezometers to be installed under contract by others);
Lampiran A menjelaskan:
a. jaringan SCADA yang lebih rinci untuk menunjukkan sadap-sadap tersier pada : (i)
Paket 1 : Bendung ke BGKn6; (ii) Paket 2 : BGKN 7 sd BGkn 24; (iii) Paket 3 : BGKN
25 sd BGKN 41; (iv) Paket 4 : BGKN 42 sd BGkn 54; dan (v) Paket 5 : BGkn 54 s/d
BGKN 59.
b. Konfigurasi peralatan SCADA dan peralatan tambahan pada (i) Pintu air dengan
actuator terpasang yang memerlukan sensor air tanah; (ii) pintu air dengan aktuator
baru; (iii) di daerah tangkapan air dan petak distribusi air permukaan (iv) area likuifaksi;
c. lokasi sumur air tanah yang akan dimonitor ke DSS untuk proses pemantauan (15
lokasi sumur air tanah yang telah dipasang berdasarkan kontrak oleh pihak lain dan
akan diapsang sensor level air tanah pada pekerjaan ini);
Appendix B provides:
a. Schematic showing overall SCADA system.
b. Schematic configurations of items also shown in Appendix A, item b;
c. Schematic equipment configurations for (i) Gumbasa weir; (ii) Gumbasa Irrigation Intake
Gauging Station; (iii) Cross regulators, secondary canals and associated tertiary offtakes
at BGKn 3, 5, 6, 9, 13, 19, 24, 32,33, 35, 36, 38, 41, 42, 49, 51 and 53. (iv) catchment
area rainfall station, (v) catchment area rainfall and water level gauging station, (vi)
weather station; (vii) Liquefaction Area Gauging Station; (viii) Master Station: Water
Operation Center (WOC), and (ix) Monitoring Station : BBWS Sulawesi-III.
Lampiran B menjelaskan:
a. Skema keseluruhan sistem SCADA.
b. Skema konfigurasi skema item juga ditunjukkan pada Lampiran A, item b;
c. Konfigurasi peralatan skematis untuk (i) Bendung Gumbasa; (ii) Stasiun Pengukur
Intake Irigasi Gumbasa; (iii) Pengatur silang, saluran sekunder dan penyeberangan
tersier terkait di BGKn 3, 5, 6, 9, 13, 19, 24, 32,33, 35, 36, 38, 41, 42, 49, 51 dan 53.
(iv ) stasiun curah hujan daerah tangkapan air hulu, (v) daerah tangkapan hujan dan
stasiun pengukur ketinggian air, (vi) stasiun cuaca; (vii) Stasiun Pengukur Area
Likuifaksi; (viii) Stasiun Induk: Water Operation Center (WOC), dan (ix) Stasiun
Monitoring : BBWS Sulawesi-III.
The contractor is expected to prepare anticipation if there are various obstacles during the
installation, including how to handle them. It is advised to start installing the SCADA equipment
INTERNAL. This information is accessible to ADB Management and staff. It may be shared outside ADB with appropriate permission.
Euroconsult Mott MacDonald Gumbasa Irrigation JV | SCADA and DSS Report
from the headworks and then work downstream. Once the first package is complete, the
contractor should link to the IT-WMS/DSS and start flow monitoring operations. Any flaw or
incompatibility can then be resolved over a small area so that little time is lost and lessons
learned can be expanded to the following package. An operational map is provided in Figure
2.
Kontraktor diharapkan untuk menyiapkan antisipasi bila dalam pemasangan terdapat berbagai
kendala, termasuk cara penagannya. Disarankan untuk mulai pemasangan peralatan SCADA
dari headwork, dlanjutkan ke arah hilir. Satelah pemasangan di satu lokasi/paket selesai,
harus segera di integrasikan ke IT-WMS / DSS untuk pemantauan aliran / operasi pembagian
air. Setiap ketidak-sesuaian harus segera diatasi untuk catatan/perbaikan pada tahap
selanjutnya. Peta operasional ditunjutkkan pada Gambar 2.
INTERNAL. This information is accessible to ADB Management and staff. It may be shared outside ADB with appropriate permission.
Euroconsult Mott MacDonald Gumbasa Irrigation JV | SCADA and DSS Report
Detail technical specifications for each equipment, works or services are as follow :
RIncian spesifikasi teknis untuk setiap peralatan, pekerjaan/jasa adalah sebagai berikut :
A-01. Smart Datalogger, including GPRS modem /
Penyimpan data cerdas, termasuk modem GPRS
Parameter Technical Specification / Spesifikasi Teknis
Datalogger type Ultra low power, smart and high-end datalogger
Memory, external Micro SD Card, 32GB
Analog input 5 channel, 12-bit ADC
Display LCD 3.5”-inch min, TFT, 320x240 pix, LED-backlight, touchscreen,
On/Off switchable
Communication port 2 serial ports: RS-232/485 (ASCII, ModBus, NMEA-183), USB or
equivalent.
Data format TCP, FTP, email
Input power DC 12/24V or AC 220V
GSM modem/router Built-In, 3G, GSM/GPRS/SMS communication, 900/1800MHz band, open
AT command, type-3 SIM card interface
Enclosure Including outdoor enclosure, non-corrosive, weather-proof
Solar power Including solar-panel, charger-controller and deep-cycle back-up battery
with adequate capacity for datalogger and another connected divices
(sensors, modem, etc). Contractor shall submit solar power calculation to
the user for approval prior procurement.
INTERNAL. This information is accessible to ADB Management and staff. It may be shared outside ADB with appropriate permission.
Euroconsult Mott MacDonald Gumbasa Irrigation JV | SCADA and DSS Report
INTERNAL. This information is accessible to ADB Management and staff. It may be shared outside ADB with appropriate permission.
Euroconsult Mott MacDonald Gumbasa Irrigation JV | SCADA and DSS Report
Resolution 1 degC
Accuracy ± 0,3 degC
Resolution 1 Km/h
Accuracy ± 5%
Transducer type Wind vane with potentiometer
Direction
Resolution 1o
Accuracy ± 3o
Transducer type Silicon photovoltaic detector or equivalent
Radiation
Resolution 1 W/m2
Accuracy ± 5% full-scale
Power source Solar panel with back-up battery, 12/24 VDC
Output data Serial, RJ-11 connector
Enclosure Outdoor type, weather proof, IP-64 minimum
Installation method Flange or clamp-on pipe
Integration / Calibration Bidder may provide individual sensors and combine to a datalogger
or integrated weather stations as a single purchasing unit.
Contractors can quote for approval of such systems as well as
2 It should be noted that some manufacturers provide integrated weather stations as a single purchasing unit.
Contractors can quote for approval of such systems as well as making individual purchases.
INTERNAL. This information is accessible to ADB Management and staff. It may be shared outside ADB with appropriate permission.
Euroconsult Mott MacDonald Gumbasa Irrigation JV | SCADA and DSS Report
A-09. Reduction Gear for Actuator / Gigi Pengurang Kecepatan Pintu Air
INTERNAL. This information is accessible to ADB Management and staff. It may be shared outside ADB with appropriate permission.
Euroconsult Mott MacDonald Gumbasa Irrigation JV | SCADA and DSS Report
A-10. Security Fences Protection, for Motorized Gate and electronic equipment
Pelindung keamanan untuk pintu air dengan motor listrik
INTERNAL. This information is accessible to ADB Management and staff. It may be shared outside ADB with appropriate permission.
Euroconsult Mott MacDonald Gumbasa Irrigation JV | SCADA and DSS Report
INTERNAL. This information is accessible to ADB Management and staff. It may be shared outside ADB with appropriate permission.
Euroconsult Mott MacDonald Gumbasa Irrigation JV | SCADA and DSS Report
A-17 Main Electric Connection, 6.600 watt / Sambungan PLN, 6600 watt
INTERNAL. This information is accessible to ADB Management and staff. It may be shared outside ADB with appropriate permission.
Euroconsult Mott MacDonald Gumbasa Irrigation JV | SCADA and DSS Report
B-03. Computer 19-inch rack, 32-U / Rak komputer 19-inch tinggi 32-U
INTERNAL. This information is accessible to ADB Management and staff. It may be shared outside ADB with appropriate permission.
Euroconsult Mott MacDonald Gumbasa Irrigation JV | SCADA and DSS Report
INTERNAL. This information is accessible to ADB Management and staff. It may be shared outside ADB with appropriate permission.
Euroconsult Mott MacDonald Gumbasa Irrigation JV | SCADA and DSS Report
INTERNAL. This information is accessible to ADB Management and staff. It may be shared outside ADB with appropriate permission.
Euroconsult Mott MacDonald Gumbasa Irrigation JV | SCADA and DSS Report
INTERNAL. This information is accessible to ADB Management and staff. It may be shared outside ADB with appropriate permission.
Euroconsult Mott MacDonald Gumbasa Irrigation JV | SCADA and DSS Report
B-12. Computer for Juru & UPTD / Komputer untuk Juru & Pengamat
Parameter Technical Specification / Spesifikasi Teknis
Computer type Desktop All-in-One PC
Processor Intel Core i3 or AMD A9
Memory, Hard drive 4 GB DDR4, 1 TB SATA
Connectivity Wifi, Bluetooth, LAN
Monitor 21-inch, 1920 x 1080
Operating System MS Windows-10
B-14. Operation & Maintenance (gate operator, etc) / Operasi & pemeliharaan sistem
Parameter Technical Specification / Spesifikasi Teknis
Cost of Gate Operator Contractor provides incentives for gate and system operators and
related staffs up-to to Final Hands Over (FHO).
Cost of System Operation & Contractor provides all O&M cost up-to FHO, includes : data
Maintenance (O&M) hosting for measurement data hosting, online monitoring
application, cellular for gauging stations and master station,
internet connection for all related devices.
INTERNAL. This information is accessible to ADB Management and staff. It may be shared outside ADB with appropriate permission.
Euroconsult Mott MacDonald Gumbasa Irrigation JV | SCADA and DSS Report
INTERNAL. This information is accessible to ADB Management and staff. It may be shared outside ADB with appropriate permission.
Euroconsult Mott MacDonald Gumbasa Irrigation JV | SCADA and DSS Report
B-18 CCTV Camera, PTZ, Outdoor / Kamera CCTV, PTZ, luar ruangan
Parameter Technical Specification / Spesifikasi Teknis
Camera type Network IR Speed Dome PTZ Camera, 20X Optical zoom
Image sensor 1/2.8” progressive scan CMOS
Min Illumination B/W : 0.01 Lux, Colour “ 0.05 Lux, IR : 0 Lux
PTZ Pan : 360o endless, Tilt : -20o to 90o , 300 preset position
Scheduled task Preset/Pattern Scan/Patrol Scan/Auto Scan/Tilt Scan/Random
Scan/Frame Scan/Panorama Scan/Dome Reboot/Dome Adjust/
Aux Output
Resolution 2MP, 1920 x 1080
Simultaneous Stream / Live View minimum 3 stream / up to 20 channels
Video compression H.265, H.264, MJPEG
Audio interface 1-ch input + 1-ch output
Storage Memory card slot, support Micro SD/SDHC/SDXC
Power input PoE, 24VDC
Accessories Including installation pole and bracket
B-20 Network video recorder & software / Piranti lunak perekam jaringan video
Parameter Technical Specification / Spesifikasi Teknis
Processor High performance ARM A9
Storage 4 SATA interface for 4 HDDs, up to 4TB capacity each HDD
Capacity, installed 4TB
Network interface 16x100M Ethernet, 2xRS-232, 4xRS-485
Software Capability to manage stored video, edit and display
INTERNAL. This information is accessible to ADB Management and staff. It may be shared outside ADB with appropriate permission.
Euroconsult Mott MacDonald Gumbasa Irrigation JV | SCADA and DSS Report
INTERNAL. This information is accessible to ADB Management and staff. It may be shared outside ADB with appropriate permission.
Euroconsult Mott MacDonald Gumbasa Irrigation JV | SCADA and DSS Report
Decision Support System (DSS) utilization is to perform effective and efficient water management. DSS
is application software of Water Balance Model for provide model based or scenario based system due
to various parameters of crop type, cropping pattern, irrigation network, soil type, etc.
INTERNAL. This information is accessible to ADB Management and staff. It may be shared outside ADB with appropriate permission.
Euroconsult Mott MacDonald Gumbasa Irrigation JV | SCADA and DSS Report
1. Data Management
Data management organizes data collection and access procedure to database. Historical data is
input to database system in the initial stage. Real time data from AWLR (Automatic Water Level
Recorder), Automatic Rain Recorder (ARR), Automatic Weather Station (AWS) or gate position
sensor are input to enhanced database for further processing or analyzing. Database update will be
done either directly from SCADA sensors or manual input by operator, such as cropping pattern,
irrigation network, etc. Another user can access database at model based or scenario based module.
Following figure shows data management scheme.
INTERNAL. This information is accessible to ADB Management and staff. It may be shared outside ADB with appropriate permission.
Euroconsult Mott MacDonald Gumbasa Irrigation JV | SCADA and DSS Report
The DSS will also comply to existing irrigation operation system using automatically populating
digital operation forms (blanko) as in the following operation flow :
INTERNAL. This information is accessible to ADB Management and staff. It may be shared outside ADB with appropriate permission.
Euroconsult Mott MacDonald Gumbasa Irrigation JV | SCADA and DSS Report
Untuk memenuhi pengaturan pengunaan air yang efektif dan efisien, maka diperlukan Decision Suppor
System (DSS) atau Monitoring & Management System (MMS) berupa aplikasi Model Neraca Air (Water
Balance Modeling) yang dapat melakukan berbagai model dan scenario penggunaan air berdasarkan
berbagai parameter jenis tanaman, jaringan irigasi, kondisi dsb.
DSS yang akan dibuat berdasarkan pada sistem operasi jaringan irigasi yang terdiri dari 4 modul yang
saling berhubungan yaitu :
1. database,
2. sistem berbasis model,
3. sistem berbasis scenario,
4. user ingerface,
dengan kerangka seperti pada gambar-2. SIstem berbasis model bersifat umum dan dapat digunakan
untuk mengubah bagian jaringan dan isi database. Bagian modul model-based dan modul scenario-
based akan membaca database untuk diolah sesuai dengan kondisi Daerah Irigasi Saddang.
Keterkaitan model umum dengan bagian yang bisa diubah serta output dapat dilihat pada gambar-3.
INTERNAL. This information is accessible to ADB Management and staff. It may be shared outside ADB with appropriate permission.
Euroconsult Mott MacDonald Gumbasa Irrigation JV | SCADA and DSS Report
Arsitektur DSS yang akan dibuat secara umum memiliki 3 bagian utama yaitu :
1. manajemen data,
2. penyusunan Rencana Tata Tanam Global (RTTG), dan
3. alokasi air.
1. Manajemen data
Manajemen data menunjukkan cara pengumpulan data dan akses ke database. Data historis
dimasukkan ke sistem database di awal. Data real time muka air dari AWLR yang telah diubah
menjadi debit serta data real time iklim diinputkan ke database guna memperkaya database untuk
penggunaan selanjutnya. Selama penggunaan aplikasi DSS, pengisian database dilakukan
langsung dari sensor maupun secara manual. Pengisi database manual adalah juru untuk masukan
data realisasi tanam dan jaringan oleh operator data. Pengguna lain mengakses database melalui
bagian model dan skenario. Skema majemen data adalah seperti pada berikut ini.
INTERNAL. This information is accessible to ADB Management and staff. It may be shared outside ADB with appropriate permission.
Euroconsult Mott MacDonald Gumbasa Irrigation JV | SCADA and DSS Report
Alokasi air merupakan pelaksanaan harian operasi irigasi. Masukan berupa pembacaan tinggi
muka air yang diubah menjadi data debit serta data tanaman dari input juru. Neraca air harian
berupa perbandingan debit tersedia dengan kebutuhan air tanaman akan menentukan kondisi
kecukupan air harian. Neraca air harian memberikan perintah alokasi air yaitu debit yang harus
dialirkan tiap saluran sekunder atau tersier. Operasi buka/tutup pintu dapat dilakukan oleh
penjaga pintu berdasarkan data dari sistem DSS maupun secara otomatis berdasarkan perintah
dari sistem SCADA.
DSS yang akan dibuat juga akan menyesuaikan dengan sistem operasi irigasi yang selama ini
berjalan menggunakan blanko operasi sebagai berikut :
INTERNAL. This information is accessible to ADB Management and staff. It may be shared outside ADB with appropriate permission.
Euroconsult Mott MacDonald Gumbasa Irrigation JV | SCADA and DSS Report
INTERNAL. This information is accessible to ADB Management and staff. It may be shared outside ADB with appropriate permission.
Euroconsult Mott MacDonald Gumbasa Irrigation JV | SCADA and DSS Report
INTERNAL. This information is accessible to ADB Management and staff. It may be shared outside ADB with appropriate permission.
Euroconsult Mott MacDonald Gumbasa Irrigation JV | SCADA and DSS Report
INTERNAL. This information is accessible to ADB Management and staff. It may be shared outside ADB with appropriate permission.
Euroconsult Mott MacDonald Gumbasa Irrigation JV | SCADA and DSS Report
Figure 10. Configuration of equipment at gauging station with new gate actuator /
Konfigurasi peralatan di stasiun ukur dengan aktuator pintu air baru
INTERNAL. This information is accessible to ADB Management and staff. It may be shared outside ADB with appropriate permission.
Euroconsult Mott MacDonald Gumbasa Irrigation JV | SCADA and DSS Report
INTERNAL. This information is accessible to ADB Management and staff. It may be shared outside ADB with appropriate permission.
Euroconsult Mott MacDonald Gumbasa Irrigation JV | SCADA and DSS Report
INTERNAL. This information is accessible to ADB Management and staff. It may be shared outside ADB with appropriate permission.
Euroconsult Mott MacDonald Gumbasa Irrigation JV | SCADA and DSS Report
INTERNAL. This information is accessible to ADB Management and staff. It may be shared outside ADB with appropriate permission.
Euroconsult Mott MacDonald Gumbasa Irrigation JV | SCADA and DSS Report
Appendix A : Detailed SCADA Network at each Package / Rincian jaringan SCADA pada setiap paket pekerjaan
Figure 13. SCADA gauging stations at Package-1 / Stasiun Ukur SCADA pada Paket-1
INTERNAL. This information is accessible to ADB Management and staff. It may be shared outside ADB with appropriate permission.
Euroconsult Mott MacDonald Gumbasa Irrigation JV | SCADA and DSS Report
Figure 14. SCADA gauging stations at Package-2 / Stasiun Ukur SCADA pada Paket-2
INTERNAL. This information is accessible to ADB Management and staff. It may be shared outside ADB with appropriate permission.
Euroconsult Mott MacDonald Gumbasa Irrigation JV | SCADA and DSS Report
Figure 15. SCADA gauging stations at Package-3 / Stasiun Ukur SCADA pada Paket-3
INTERNAL. This information is accessible to ADB Management and staff. It may be shared outside ADB with appropriate permission.
Euroconsult Mott MacDonald Gumbasa Irrigation JV | SCADA and DSS Report
Figure 16. SCADA gauging stations at Package-4 / Stasiun Ukur SCADA pada Paket-4
INTERNAL. This information is accessible to ADB Management and staff. It may be shared outside ADB with appropriate permission.
Euroconsult Mott MacDonald Gumbasa Irrigation JV | SCADA and DSS Report
Figure 17. Configuration of equipment at gauging station with existing gate actuator /
Konfigurasi peralatan pada stasiun ukur yang telah terpasang aktuator pintu air
Figure 18. Configuration of equipment at gauging station with new gate actuator /
Konfigurasi peralatan pada stasiun ukur dengan aktuator pintu air baru
INTERNAL. This information is accessible to ADB Management and staff. It may be shared outside ADB with appropriate permission.
Euroconsult Mott MacDonald Gumbasa Irrigation JV | SCADA and DSS Report
INTERNAL. This information is accessible to ADB Management and staff. It may be shared outside ADB with appropriate permission.
Euroconsult Mott MacDonald Gumbasa Irrigation JV | SCADA and DSS Report
Figure 21. Location of monitored observation wells / Lokasi pemantauan sumur air tanah
INTERNAL. This information is accessible to ADB Management and staff. It may be shared outside ADB with appropriate permission.
Euroconsult Mott MacDonald Gumbasa Irrigation JV | SCADA and DSS Report
The following figures show the layout of the observation well at each gauging station.
Posisi sumur air tanah pada setiap stasiun ukur dapat dilihat pada gambar-gambar berikut ini.
Figure 22. The layout of the monitored observation well at Gumbasa Weir /
Posisi sumur air tanah di area Bendung Gumbasa
Figure 23. The layout of the monitored observation well at B.GKn.8 Station /
Posisi sumur air tanah di area Stasiun B.GKn.8
INTERNAL. This information is accessible to ADB Management and staff. It may be shared outside ADB with appropriate permission.
Euroconsult Mott MacDonald Gumbasa Irrigation JV | SCADA and DSS Report
Figure 24. The layout of the monitored observation well at B.GKn.13 Station /
Posisi sumur air tanah di area Stasiun B.GKn.13
Figure 25. The layout of the monitored observation well at B.GKn.19 Station /
Posisi sumur air tanah di area Stasiun B.GKn.19
INTERNAL. This information is accessible to ADB Management and staff. It may be shared outside ADB with appropriate permission.
Euroconsult Mott MacDonald Gumbasa Irrigation JV | SCADA and DSS Report
Figure 26. The layout of the monitored observation well at B.GKn.24 Station /
Posisi sumur air tanah di area Stasiun B.GKn.24
Figure 27. The layout of monitored observation well at B.GKn.32 and B.GKn.33 Stations /
Posisi sumur air tanah di area Stasiun B.GKn.32 dan B.GKn.33
INTERNAL. This information is accessible to ADB Management and staff. It may be shared outside ADB with appropriate permission.
Euroconsult Mott MacDonald Gumbasa Irrigation JV | SCADA and DSS Report
Figure 28. The layout of the monitored observation well at B.GKn.36 Station /
Posisi sumur air tanah di area Stasiun B.GKn.36
Figure 29. The layout of the monitored observation well at B.GKn.38 Station/
Posisi sumur air tanah di area Stasiun B.GKn.38
INTERNAL. This information is accessible to ADB Management and staff. It may be shared outside ADB with appropriate permission.
Euroconsult Mott MacDonald Gumbasa Irrigation JV | SCADA and DSS Report
Figure 30. The layout of monitored observation well at B.GKn.41 and B.GKn.42 Stations /
Posisi sumur air tanah di area Stasiun B.GKn.41 dan B.GKn.42
Figure 31. The layout of the monitored observation well at B.GKn.49 Station
Posisi sumur air tanah di area Stasiun B.GKn.49
INTERNAL. This information is accessible to ADB Management and staff. It may be shared outside ADB with appropriate permission.
Euroconsult Mott MacDonald Gumbasa Irrigation JV | SCADA and DSS Report
Figure 32. The layout of monitored observation well at B.GKn.51 and B.GKn.53 Stations /
Posisi sumur air tanah di area Stasiun B.GKn.51 dan B.GKn.53
Figure 33. The layout of monitored observation well at Sibalaya liquefaction area /
Posisi sumur air tanah di area likuifaksi Sibalaya
INTERNAL. This information is accessible to ADB Management and staff. It may be shared outside ADB with appropriate permission.
Euroconsult Mott MacDonald Gumbasa Irrigation JV | SCADA and DSS Report
Figure 34. The layout of monitored observation well at Jono Oge liquefaction area
Posisi sumur air tanah di area likuifaksi Jono Oge
Figure 35. The layout of monitored observation well at Petobo liquefaction area
Posisi sumur air tanah di area likuifaksi Petobo
INTERNAL. This information is accessible to ADB Management and staff. It may be shared outside ADB with appropriate permission.
Euroconsult Mott MacDonald Gumbasa Irrigation JV | SCADA and DSS Report
INTERNAL. This information is accessible to ADB Management and staff. It may be shared outside ADB with appropriate permission.
Euroconsult Mott MacDonald Gumbasa Irrigation JV | SCADA and DSS Report
Figure 36. Overall SCADA gauging stations / Keseluruhan stasiun ukur SCADA
INTERNAL. This information is accessible to ADB Management and staff. It may be shared outside ADB with appropriate permission.
Euroconsult Mott MacDonald Gumbasa Irrigation JV | SCADA and DSS Report
INTERNAL. This information is accessible to ADB Management and staff. It may be shared outside ADB with appropriate permission.
Euroconsult Mott MacDonald Gumbasa Irrigation JV | SCADA and DSS Report
INTERNAL. This information is accessible to ADB Management and staff. It may be shared outside ADB with appropriate permission.
Euroconsult Mott MacDonald Gumbasa Irrigation JV | SCADA and DSS Report
INTERNAL. This information is accessible to ADB Management and staff. It may be shared outside ADB with appropriate permission.
Euroconsult Mott MacDonald Gumbasa Irrigation JV | SCADA and DSS Report
INTERNAL. This information is accessible to ADB Management and staff. It may be shared outside ADB with appropriate permission.
Euroconsult Mott MacDonald Gumbasa Irrigation JV | SCADA and DSS Report
INTERNAL. This information is accessible to ADB Management and staff. It may be shared outside ADB with appropriate permission.
Euroconsult Mott MacDonald Gumbasa Irrigation JV | SCADA and DSS Report
INTERNAL. This information is accessible to ADB Management and staff. It may be shared outside ADB with appropriate permission.
Euroconsult Mott MacDonald Gumbasa Irrigation JV | SCADA and DSS Report
INTERNAL. This information is accessible to ADB Management and staff. It may be shared outside ADB with appropriate permission.
Euroconsult Mott MacDonald Gumbasa Irrigation JV | SCADA and DSS Report
INTERNAL. This information is accessible to ADB Management and staff. It may be shared outside ADB with appropriate permission.
Euroconsult Mott MacDonald Gumbasa Irrigation JV | SCADA and DSS Report
INTERNAL. This information is accessible to ADB Management and staff. It may be shared outside ADB with appropriate permission.
Euroconsult Mott MacDonald Gumbasa Irrigation JV | SCADA and DSS Report
INTERNAL. This information is accessible to ADB Management and staff. It may be shared outside ADB with appropriate permission.
Euroconsult Mott MacDonald Gumbasa Irrigation JV | SCADA and DSS Report
INTERNAL. This information is accessible to ADB Management and staff. It may be shared outside ADB with appropriate permission.
Euroconsult Mott MacDonald Gumbasa Irrigation JV | SCADA and DSS Report
INTERNAL. This information is accessible to ADB Management and staff. It may be shared outside ADB with appropriate permission.
Euroconsult Mott MacDonald Gumbasa Irrigation JV | SCADA and DSS Report
INTERNAL. This information is accessible to ADB Management and staff. It may be shared outside ADB with appropriate permission.
Euroconsult Mott MacDonald Gumbasa Irrigation JV | SCADA and DSS Report
INTERNAL. This information is accessible to ADB Management and staff. It may be shared outside ADB with appropriate permission.
Euroconsult Mott MacDonald Gumbasa Irrigation JV | SCADA and DSS Report
INTERNAL. This information is accessible to ADB Management and staff. It may be shared outside ADB with appropriate permission.
Euroconsult Mott MacDonald Gumbasa Irrigation JV | SCADA and DSS Report
INTERNAL. This information is accessible to ADB Management and staff. It may be shared outside ADB with appropriate permission.
Euroconsult Mott MacDonald Gumbasa Irrigation JV | SCADA and DSS Report
INTERNAL. This information is accessible to ADB Management and staff. It may be shared outside ADB with appropriate permission.
Euroconsult Mott MacDonald Gumbasa Irrigation JV | SCADA and DSS Report
INTERNAL. This information is accessible to ADB Management and staff. It may be shared outside ADB with appropriate permission.
Euroconsult Mott MacDonald Gumbasa Irrigation JV | SCADA and DSS Report
INTERNAL. This information is accessible to ADB Management and staff. It may be shared outside ADB with appropriate permission.
Euroconsult Mott MacDonald Gumbasa Irrigation JV | SCADA and DSS Report
INTERNAL. This information is accessible to ADB Management and staff. It may be shared outside ADB with appropriate permission.
Euroconsult Mott MacDonald Gumbasa Irrigation JV | SCADA and DSS Report
INTERNAL. This information is accessible to ADB Management and staff. It may be shared outside ADB with appropriate permission.
Euroconsult Mott MacDonald Gumbasa Irrigation JV | SCADA and DSS Report
INTERNAL. This information is accessible to ADB Management and staff. It may be shared outside ADB with appropriate permission.
Euroconsult Mott MacDonald Gumbasa Irrigation JV | SCADA and DSS Report
INTERNAL. This information is accessible to ADB Management and staff. It may be shared outside ADB with appropriate permission.
Euroconsult Mott MacDonald Gumbasa Irrigation JV | SCADA and DSS Report
INTERNAL. This information is accessible to ADB Management and staff. It may be shared outside ADB with appropriate permission.
Euroconsult Mott MacDonald Gumbasa Irrigation JV | SCADA and DSS Report
INTERNAL. This information is accessible to ADB Management and staff. It may be shared outside ADB with appropriate permission.
Euroconsult Mott MacDonald Gumbasa Irrigation JV | SCADA and DSS Report
INTERNAL. This information is accessible to ADB Management and staff. It may be shared outside ADB with appropriate permission.
mottmac.com
INTERNAL. This information is accessible to ADB Management and staff. It may be shared outside ADB with appropriate permission.