Project: KAI MALL - BOOTH SEATING FOOD HALL 15/11/2022

Subject: Furniture Works INQ2022-024H


Client: Alfie Limketkai
Location: Kaimall, Zabarte Road corner Camarin, North Caloocan

Dear Sir/Ma'am,
In accordance to your request, we are pleased to submit to you our quotation to supply the complete labor, tools, materials
and technical supervision to effect the project. The scope of work and cost estimate are breakdown as follows:

A. COST ESTIMATE
ITEM NO. Scope of Works QTY UNITS TOTAL COST

BS-A SUPPLY AND FABRICATION OF BOOTH SEATING 1 & 2


Fabrication of Booth Seating 1 (4.24mL x 1.10mWx1.11mH) using the following
BS-A1 2.00 sets
material specifications:
- Backrest - using Medium density polyurethane foam upholstered in
fluted beige vinyl faux leather
- Seat - using 6" thick high density polyurethane foam upholstered in
dark teal green vinyl faux leather
- Carcass - using ash wood laminate
- Booth Seating Carcass and Planter - using particle board cladded in
formica laminate on heavy duty metal frame
Fabrication of Booth Seating 2 (10.8mLx4.15mWx1.275mH) using the following
BS-A2 2.00 sets
material specifications:
- Backrest - using Medium density polyurethane foam upholstered in
fluted beige vinyl faux leather
- Seat - using 6" thick high density polyurethane foam upholstered in
dark teal green vinyl faux leather
- Carcass - using ash wood laminate
- Booth Seating Carcass and Planter - using particle board cladded in
formica laminate on heavy duty metal frame
- Service Area Partition and Planters (Option 1) - using particle board
carcass cladded in pvc wood slats in approved finish
- Custom Moveable Service Counter - using particle board carcass
cladded in formica laminate and pvc edging. Use Hafele Soft-closing hinges and
swivel caster wheels. Use stainless steel cabinet door handle.
CEILING WORKS SUBTOTAL 945,000.00
SUBTOTAL 945,000.00
12% VAT 113,400.00
GRAND TOTAL 1,058,400.00
(VAT INCLUDED)
Note:
Price may vary based upon the actual quantity and measurements on site

B. Terms of payment
50% DP upon confirmation of this quote
45% Progressive billing on 50% worth progress
5% Retention, upon completion of the project

C. Duration of Works
Working Days

D. Exclusions
Municipal and Government fees
All items not mentioned in this quote are not included.
All office items are not included
Aircondition and Mechanical Items are not included

Thank you for giving us the opportunity to quote on your requirements. We are looking forward to be
of service to you.

Prepared by: Noted by:

Engr. Caszandra Nicole Salem Jacques Monjardin


Civil Engineer Managing Partner

Conforme:

Client / Owner