REVIEW STATUS A

APPROVED
X B
APPROVED AS NOTED
C
REVISE & RESUBMIT REJECTED
D

DATE REVIEWED GA : FM
REVIEWED BY 04/08/20

PERSIAN
RESTAURANT

GENERAL NOTES:
1. ALL DIMENSIONS ARE IN MILLIMETERS AND LEVELS ARE IN METERS UNLESS NOTED OTHERWISE.
2. DO NOT SCALE FROM THIS DRAWING. ONLY WRITTEN DIMENSIONS ARE TO BE FOLLOWED.
MENTIONED SIZE DRAWING SET IS FULL SIZE.

MEP COORDINATION
REFERENCE NUMBER DATE TITLE

REFERENCE DESIGN DRAWINGS


REFERENCE NUMBER DATE TITLE

REFERENCE SHOP DRAWINGS


REFERENCE NUMBER DATE TITLE

RELATED DOCUMENTS
5 REFERENCE NUMBER DATE TITLE
GEN-20024
5
GEN-20024

1 1

A ELEVATION C ELEVATION
GEN-20021 SCALE 1:20 GEN-20021 SCALE 1:20

DEC MEP COMMENTS: 17


T4

1. CONTACTOR to ensure all MEP elements are as per approved MEP individual services shop drawings and CSDs. 3 16

2. Ensure provided access panels covering all the services as per signed- off drawings’
15

GEN-20024 14

3. Contractor to ensure grills & diffusers locations are coordinated with ID RCP IFC & approved HVAC ducting layout.
4. Grille and Diffusers selection shall be submitted for approval taking the ID IFC and HVAC shop drawings requirements
KEY PLAN 13

in to consideration. Ensure return air path is sufficient to achieve balance between supply and return air.
5. Contractor to ensure that the coverage and code requirements related to the MEP elements are not compromised as C D
part of coordination.

DEC ARCHITECUTRAL COMMENTS B


1. FINAL DIMENSIONS TO BE AS PER SITE CONDITIONS.
2. COORDINATE WITH C6 PACKAGE FOR PARTITIONS
3. CONTRACTOR TO ENSURE THAT THE DOCUMENTS LISTED BELOW BUT NOT LIMITED TO ARE CALCULATIONS ROSE BAR AREA
FOLLOWED IN ITS ENTIRETY DURING SITE EXECUTION. IFC DRAWINGS, INSTURCTIONS, DESIGNERS/ REQUIRED FOR
CLIENTS SIGNED OFF DRAWINGS,SDIRS,RFI RESPONSES & ETC. ADEQUATE
4. DEVIATING FROM THE VARIOUS APPROVED DURING EXECUTION OF WORKS WILL RESULT IN REJECTION OF WIR SUPPORT ON THE
5. ALL MARBLE WORKS SUBJECT TO DRY LAY APPROVAL CEILING. BELOW
6. ALL MATERIALS TO BE AS PER APPROVED SAMPLES/MOCKUPS. MENTIONED A
7. ALL ROUGH CARPENTRY TO BE AS PER SPECIFICATIONS. CALCULATION IS
8. CONTRACTOR TO COORDINATE DOOR STRUCTURAL OPENING WIDTH & HEIGHT WITH ID, NOT AVAILABLE IN
ARCHITECTURE, DOOR SCHEDULE AND SITE CONDITION. ACONEX
ROSE BAR AREA KEY PLAN

2
GEN-20024

REV DATE DESCRIPTION DRN CHK APP

THE ROYAL ATLANTIS RESORT


AND RESIDENCES
Palm Jumeirah Crescent, Dubai U.A.E.

IBI GROUP ARCHITECTS


95 St. Clair Ave. West, Suite 200
Toronto, ON, M4V1N6, Canada
tel (416) 924-9966 fax (416) 924-9067
ibigroup.com

OFFICE 2805 - 2810,CONCORD TOWER,


MEDIA CITY, DUBAI, UNITED ARAB EMIRATES,
P.O. BOX: 79593
TEL.: 04-2989220, FAX: 04-2989210
www.decengineering.net

250 250 Abu Dhabi UAE Office Dubai UAE office


P.O. BOX 73814 P.O. BOX 334138
1 Tel.: +971 2 499 5 444 Tel.: +971 4 346 7 711
1 Fax: +971 2 499 5 400
email: decov@decovision.ae
Fax: +971 4 346 7 722
email: decov@decovision.ae

SHEET 2 0F 14
PACKAGE F5C
* *
PERSIAN RESTAURANT GROUND LEVEL
* * ROSE BAR
ELEVATION - A, B, C & E
1 1
* *
S/S KICK PLATE S/S KICK PLATE PJCRC 19-27C / PALM JUMEIRAH

1 06.08.2019 IJE BA A1 AS DRAWN

B ELEVATION D ELEVATION TRA DCV SDG ID


GEN-20021 SCALE 1:20 GEN-20021 SCALE 1:20

GEN 20021 01