ACTION **
DOCUMENT TITLE :
RE: THE ROYAL ATLANTIS RESORT & RESIDENCES-MAIN CONTRACT F9 - GROUND FLOOR BOH BANQUET KITCHEN
Contract No.: ELEVATIONS
THE ROYAL ATLANTIS RESORT AND RESIDENCES
APPROVED A
CN0063 APPROVED AS NOTED B
DEC Dynamic Engineering Consultants
Contract No : CN 0063 RFI No. TRA-SBJ-RFI-AC-GEN-14639
REVISE & RESUBMIT C
STATUS OF SUBMITTAL : B D
WE AREp SENDING HEREWITH / UNDER SEPARATE COVER, THE DRAWINGS/
DOCUMENTS / SAMPLES LISTED BELOW. (DELETE AS NECESSARY) EMPLOYER : ATLANTIS THE PALM LIMITED 2 Rev. 00
DRWS., SPEC. OR CODE
Item CONTRACTOR
REV : SSANGYONG-BESIX DESCRIPTION
JV DATE: 13/12/2020
F9/M2 - Control Panel to be relocated above false ceiling in Room G-0912
BOQ. REF. Submittal Action
DESCRIPTION :
REQUEST FOR INFORMATION
C15a-AS - Structural Design Calculation of Glass Partition, Curtain Wall and Aluminum Cladding for
1 Civi
TRA-CTS-CAL-ST-GEN-00036 01 Ancillary Building
CAL 1
Please l
note Architecture
that as per site Electrical
conditions CP-DWEF-CA-01 Mechanical
located in DishwashPlumbing
Area SBJV Internal QA/QC Check
Room G-0912 is above false ceiling.
SUBJECT : M2/M3 & M10 - SPANISH RESTAURANT WINE CELLAR Coordination
The Engineer to review and confirm the same
N/A PACKAGE
SBJV Internal
TEAM QA/QC Check INITIAL
√ Coordination INVOLVE
Further to Letter ref TRA-DEC-SBJ-02337, EI 0972 instructing the JV to design and build the
wine cellars at the Spanish restaurant and British and attaching the confirmation from the specialist N/A √ MEP PACKAGE M2
wherby the FCU which was designed to cool the wine cellar is not required. Please advise if this TEAM
INVOLVE
INITIAL
√
FCU is to be deleted. √ ARCHITECTURE F9
MEP
STRUCTURAL -
N/A STEEL
ARCHITECTURE
STRUCTURAL -
N/A CONCRETE
STRUCTURAL -
STEEL
N/A FAÇADE
STRUCTURAL -
N/A CONCRETE
OTH.(____,____,)
FAÇADE
N/A OTH.(____,____,)
OTH.(____,____,)
Attachments
STRUCTURAL - STEEL ____________________
: Sketch,
Initiated : MA TRA-SBJ-WIR-EL-G00-240003-00
BySTRUCTURAL
/ WH
- CONCRETE ______________________
OTHERS ( __________, __________ ) __________________
Required By : 17/12/2020
TYPE
MAR : MATERIAL SUBMITTAL PQD : PRE-QUALIFICATION DOCUMENTS RPO : REPORT DDG : DESIGN DRAWINGS SAM : SAMPLE
Cost Impact Time Impact
SDG : SHOP DRAWINGS Initiated By
MST : :METHOD
CPASTATEMENT GEN : GENERAL TRE : TEST REPORT Date : TEC : TECHNICAL SUBMITTAL
CAL : CALCULATION Attachments: as per attached. WAR : WARRANTY
HSE : HEALTH, SAFETY & ENVIRONMENTAL CRT : CERTIFICATE O&M : Operation & Maintenance
ASS : ASSET REGISTER ABD : AS BUILTProject Director :
Contractor Received By DEC:
Contractor Project Director : Received By DEC :
Programme of Work Activity ID Ref: Planned Start: 25-Nov-20
Programme of Work Description: Signature: Signature
Signature/ Date : Signature/Date : Planned Finish: 02-Dec-20
Copies Consultant Reply :
Electronic Copy to:
For Consultant :
Note: The Consultant's response is to be considered as an Instruction To Proceed (as defined in Construction Procedures Manual; CPM-01-11 Section 3.6)
VALERY PAQUIER,
which the Contractor
TRA_TIME Gatekeeper - Turner Construction International LLC
is to actPROJECT DIRECTOR If the Contractor feels
upon immediately. S.P. HAN , DEPUTY PROJECT
the response DIRECTOR
represents a change of value that is greater than AED 50,000, then the
Approved
Contractor is toContractor
For
Approved as Noted Not Approved
issue a Notice to the Engineer within 14 days of the consultant's response and then issue a Rough Order of Magnitude within a further 14
days from the date of the Notice to the Engineer. The Contractor will lose any rights to entitlement for failing to adhere to these time provision.
CONSULTANT'S COMMENTS
COMMENTS :
Copies To:
Control panel to be relocated above the false ceiling in Room G-0912. Contractor to ensure the control panel is fully
accessible. Accessibility to be demonstrated on site as part of the ceiling closure inspections.
Project Director:
NOTE : ThisAttachments:
info will be included in the revised shop drawing (where applicable)
Consultant RE: Signature: Date:
TRA-SBJ-QCD-QA-GEN-00004 Rev.03 Date: 28/03/19
Received By: Signature: Date:
1.08 Technical Transmittal Form.xls
TRA-SBJ-QCD-QA-GEN-00013 Rev.02 Date: 28/03/19
TRA-STC-FCN-FI-G00-00239 01
CONTROL PANEL ABOVE
FALSE CEILING
TRA-STC-FCN-FI-G00-00239 01 CONTROL PANEL ABOVE
FALSE CEILING
TRA-STC-FCN-FI-G00-00239 01
To
(2) Mr Zafar Mustafa - DEC Dynamic Engineering Consultants (+1 more...)
Cc
(9) Mr Gary Oliphant - DEC Dynamic Engineering Consultants (+8 more...)
Status Closed-Out
DETAILS
Consultant Comments - Provide FCN approval for relocation of panel from below ceiling to above ceiling.
QAQC - ITP Reference TRA-SPE-ITP-EL-GEN-00013 [02]- Installation of LV Switch Gear, Capacitor Bank, SMDB & DB
Discipline Electrical
WIR - Activities and Items to Inspection for installation of HT1-G00-CP-DWEF-CA-01 in G-0912 Ground Floor, area 9 as per attached
be Inspect highlighted drawing
ATTRIBUTES
MESSAGE
From: E Galicia
Cc: Muhammad Akmal, Muhammad Aslamuddin, Abhishek Balasubarmanian, Abdul Baseer, Mohammed Imran, Shoeb Kaleem, Khaled Mohammad,
Gary Oliphant, Abishek Lakde
Subject: Inspection for installation of HT1-G00-CP-DWEF-CA-01 in G-0912 Ground Floor, area 9 as per attached highlighted drawing
Project Reference
TRA-SBJ-WIR-EL-G00-240003-00
Number:
QAQC - ITP Reference: TRA-SPE-ITP-EL-GEN-00013 [02]- Installation of LV Switch Gear, Capacitor Bank, SMDB & DB
Discipline: Electrical
WIR - Activity: EL
WIR - Responsible
DEC
Organisation:
WIR - Activities and Inspection for installation of HT1-G00-CP-DWEF-CA-01 in G-0912 Ground Floor, area 9 as per attached highlighted
Items to be Inspect: drawing
Levels & Grids: 4 GF Zone 01 - P02-T2
Area/Structure/Location: Area 9, G-0912
WIR - Required Date of
26/01/2022
Inspection:
WIR - Required Time of
09:00
Inspection(HH:MM):
SUBMITTAL No. :
F9 - GROUND FLOOR BOH KITCHEN AREA FINISHING PLANS & ELEVATIONS, ZONE 07, BANQUET
DOCUMENT TITLE :
KITCHEN PART 2, CLEARING STATION G-0745, BEVERATE STORE G-0743
F9 - BANQUET KITCHEN - MISSING ELEVATIONS & LIGHT SWITCHES AS PER REF FCN 01186
DESCRIPTION :
TRA-SPE-SDG-TE-G00-00007-03 √ ARCHITECTURE
4. Relocation of data points at Beverage dispenser on side walls to avoid clashes with STRUCTURAL -
STEEL
kitchen equipment. STRUCTURAL -
CONCRETE
FAÇADE
Revised infor shall be updated in asbuilt.
OTH.(____,____,)
OTH.(____,____,)
For Consultant :
COMMENTS :
NOTE : This info will be included in the revised shop drawing (where applicable)
TRA-SBJ-QCD-QA-GEN-00004 Rev.02 Date: 08/09/18 18 OCT 2021