You are on page 1of 9

THE ROYAL ATLANTIS RESORT AND RESIDENCES

Contract No : CN 0063 FCN No .: TRA-STC-FCN-FI-G00-00239

EMPLOYER : ATLANTIS THE PALM LIMITED 2 Rev. 01

CONTRACTOR : SSYANGYONG_BESIX J.V. DATE: 28/01/2022

FIELD CHANGE NOTICE


Civil Architectural
Electrical Electrical Mechanical Plumbing
THE ROYAL ATLANTIS RESORT AND RESIDENCES SUBMITTAL & REVIEW FORM
SUBMITTAL No. :
TRA/SBJ/DEC/56173
SSANGYONG-BESIX Joint Venture Date: 25-Nov-20
Submitted For * Code
DOCUMENT No. :
SUBMISSION OF DOCUMENTS, DRAWINGS, SAMPLES, ETC.
TRA-STC-SDG-FI-G00-01037 APPROVAL 1
YOUR INFORMATION 2

ACTION **
DOCUMENT TITLE :
RE: THE ROYAL ATLANTIS RESORT & RESIDENCES-MAIN CONTRACT F9 - GROUND FLOOR BOH BANQUET KITCHEN
Contract No.: ELEVATIONS
THE ROYAL ATLANTIS RESORT AND RESIDENCES
APPROVED A
CN0063 APPROVED AS NOTED B
DEC Dynamic Engineering Consultants
Contract No : CN 0063 RFI No. TRA-SBJ-RFI-AC-GEN-14639
REVISE & RESUBMIT C
STATUS OF SUBMITTAL : B D
WE AREp SENDING HEREWITH / UNDER SEPARATE COVER, THE DRAWINGS/
DOCUMENTS / SAMPLES LISTED BELOW. (DELETE AS NECESSARY) EMPLOYER : ATLANTIS THE PALM LIMITED 2 Rev. 00
DRWS., SPEC. OR CODE
Item CONTRACTOR
REV : SSANGYONG-BESIX DESCRIPTION
JV DATE: 13/12/2020
F9/M2 - Control Panel to be relocated above false ceiling in Room G-0912
BOQ. REF. Submittal Action
DESCRIPTION :
REQUEST FOR INFORMATION
C15a-AS - Structural Design Calculation of Glass Partition, Curtain Wall and Aluminum Cladding for
1 Civi
TRA-CTS-CAL-ST-GEN-00036 01 Ancillary Building
CAL 1
Please l
note Architecture
that as per site Electrical
conditions CP-DWEF-CA-01 Mechanical
located in DishwashPlumbing
Area SBJV Internal QA/QC Check
Room G-0912 is above false ceiling.
SUBJECT : M2/M3 & M10 - SPANISH RESTAURANT WINE CELLAR Coordination
The Engineer to review and confirm the same
N/A PACKAGE
SBJV Internal
TEAM QA/QC Check INITIAL
√ Coordination INVOLVE
Further to Letter ref TRA-DEC-SBJ-02337, EI 0972 instructing the JV to design and build the
wine cellars at the Spanish restaurant and British and attaching the confirmation from the specialist N/A √ MEP PACKAGE M2
wherby the FCU which was designed to cool the wine cellar is not required. Please advise if this TEAM
INVOLVE
INITIAL

FCU is to be deleted. √ ARCHITECTURE F9
MEP
STRUCTURAL -
N/A STEEL
ARCHITECTURE
STRUCTURAL -
N/A CONCRETE
STRUCTURAL -
STEEL
N/A FAÇADE
STRUCTURAL -
N/A CONCRETE
OTH.(____,____,)

FAÇADE

N/A OTH.(____,____,)
OTH.(____,____,)

SBJV INTERNAL QA/QC CHECK COORDINATION OTH.(____,____,)


MEP __________________________ ARCHITECTURE ________________________ FAÇADE ____________________

Attachments
STRUCTURAL - STEEL ____________________
: Sketch,
Initiated : MA TRA-SBJ-WIR-EL-G00-240003-00
BySTRUCTURAL
/ WH
- CONCRETE ______________________
OTHERS ( __________, __________ ) __________________

Required By : 17/12/2020
TYPE
MAR : MATERIAL SUBMITTAL PQD : PRE-QUALIFICATION DOCUMENTS RPO : REPORT DDG : DESIGN DRAWINGS SAM : SAMPLE
Cost Impact Time Impact
SDG : SHOP DRAWINGS Initiated By
MST : :METHOD
CPASTATEMENT GEN : GENERAL TRE : TEST REPORT Date : TEC : TECHNICAL SUBMITTAL
CAL : CALCULATION Attachments: as per attached. WAR : WARRANTY
HSE : HEALTH, SAFETY & ENVIRONMENTAL CRT : CERTIFICATE O&M : Operation & Maintenance
ASS : ASSET REGISTER ABD : AS BUILTProject Director :
Contractor Received By DEC:
Contractor Project Director : Received By DEC :
Programme of Work Activity ID Ref: Planned Start: 25-Nov-20
Programme of Work Description: Signature: Signature
Signature/ Date : Signature/Date : Planned Finish: 02-Dec-20
Copies Consultant Reply :
Electronic Copy to:
For Consultant :
Note: The Consultant's response is to be considered as an Instruction To Proceed (as defined in Construction Procedures Manual; CPM-01-11 Section 3.6)
VALERY PAQUIER,
which the Contractor
TRA_TIME Gatekeeper - Turner Construction International LLC
is to actPROJECT DIRECTOR If the Contractor feels
upon immediately. S.P. HAN , DEPUTY PROJECT
the response DIRECTOR
represents a change of value that is greater than AED 50,000, then the
Approved
Contractor is toContractor
For
Approved as Noted Not Approved
issue a Notice to the Engineer within 14 days of the consultant's response and then issue a Rough Order of Magnitude within a further 14
days from the date of the Notice to the Engineer. The Contractor will lose any rights to entitlement for failing to adhere to these time provision.
CONSULTANT'S COMMENTS

COMMENTS :
Copies To:
Control panel to be relocated above the false ceiling in Room G-0912. Contractor to ensure the control panel is fully
accessible. Accessibility to be demonstrated on site as part of the ceiling closure inspections.
Project Director:

For DEC Dynamic Engineering Consultants


EMPLOYER'S COMMENTS

Copies To: Aditi Joshi Sr.Architect 8 Feb'22

DEC RE :For Employer


Name DEC Project Director:
Position Signature Date
Corrections or comments made relative to submittals during this review do not relieve the contractor from compliance with the requirements of the drawings and specifications. This check is only for review of general conformance with the design concept of the project and general compliance with the information given
n the contract documents. The contractor is responsible for confirming and correlating all quantities and dimensions select ing fabrication processes and techniques of construction; coordinating his work with that of other trades, and performing his work in a safe and satisfactory manner.

NOTE : ThisAttachments:
info will be included in the revised shop drawing (where applicable)
Consultant RE: Signature: Date:
TRA-SBJ-QCD-QA-GEN-00004 Rev.03 Date: 28/03/19
Received By: Signature: Date:
1.08 Technical Transmittal Form.xls
TRA-SBJ-QCD-QA-GEN-00013 Rev.02 Date: 28/03/19
TRA-STC-FCN-FI-G00-00239 01
CONTROL PANEL ABOVE
FALSE CEILING
TRA-STC-FCN-FI-G00-00239 01 CONTROL PANEL ABOVE
FALSE CEILING
TRA-STC-FCN-FI-G00-00239 01

CONTROL PANEL ABOVE


FALSE CEILING
Edward Galicia Inspection for installation of HT1-G00-CP-DWEF-CA-0… 26/01/2022
SSANGYONG — BESIX JOINT VENTURE WORK INSPECTION REQUE… SBJV-WIRQ-277950

Rajesh Nair Re: Inspection for installation of HT1-G00-CP-DWEF-… YESTERDAY


DEC DYNAMIC ENGINEERING CONSULTANTS RESPONSE TO WORK INSP… DECAE-RWIR-247501

MAIL TYPE MAIL NUMBER REFERENCE NUMBER


Response to Work Inspection Request DECAE-RWIR-247501 SBJV-WIRQ-277950

Re: Inspection for installation of HT1-G00-CP-DWEF-CA-01 in G-0912 Ground


Floor, area 9 as per attached highlighted drawing

From Mr Rajesh Nair - DEC Dynamic Engineering Consultants

To
(2) Mr Zafar Mustafa - DEC Dynamic Engineering Consultants (+1 more...)

Cc
(9) Mr Gary Oliphant - DEC Dynamic Engineering Consultants (+8 more...)

Sent Thursday, 27 January 2022


8:26:51 AM GST (GMT +04:00)

Status Closed-Out


DETAILS

Project Reference Number TRA-SBJ-WIR-EL-G00-240003-00 

Inspection Status C - Revise and Resubmit 

Consultant Comments - Provide FCN approval for relocation of panel from below ceiling to above ceiling. 

WIR - Date of Inspection 27/01/2022 

WIR - Time of 10:00 


Inspection(HH:MM)

QAQC - ITP Reference TRA-SPE-ITP-EL-GEN-00013 [02]- Installation of LV Switch Gear, Capacitor Bank, SMDB & DB 

Discipline Electrical 

WIR - Activity EL 

WIR - Responsible DEC 


Organisation

WIR - Activities and Items to Inspection for installation of HT1-G00-CP-DWEF-CA-01 in G-0912 Ground Floor, area 9 as per attached
be Inspect highlighted drawing 

Levels & Grids 4 GF Zone 01 - P02-T2 


Area/Structure/Location Area 9, G-0912 

WIR - Required Date of 26/01/2022 


Inspection

WIR - Required Time of 09:00 


Inspection(HH:MM)


ATTRIBUTES

Attribute 1 Podium - Hotel


MESSAGE

From: E Galicia

Sent: 26/01/2022 8:34:28 AM GST (GMT +04:00)

To: Zafar Mustafa, Rajesh Nair

Cc: Muhammad Akmal, Muhammad Aslamuddin, Abhishek Balasubarmanian, Abdul Baseer, Mohammed Imran, Shoeb Kaleem, Khaled Mohammad,
Gary Oliphant, Abishek Lakde

Mail Number: SBJV-WIRQ-277950

Subject: Inspection for installation of HT1-G00-CP-DWEF-CA-01 in G-0912 Ground Floor, area 9 as per attached highlighted drawing

 
Project Reference
TRA-SBJ-WIR-EL-G00-240003-00
Number:
QAQC - ITP Reference: TRA-SPE-ITP-EL-GEN-00013 [02]- Installation of LV Switch Gear, Capacitor Bank, SMDB & DB
Discipline: Electrical
WIR - Activity: EL
WIR - Responsible
DEC
Organisation:
WIR - Activities and Inspection for installation of HT1-G00-CP-DWEF-CA-01 in G-0912 Ground Floor, area 9 as per attached highlighted
Items to be Inspect: drawing
Levels & Grids: 4 GF Zone 01 - P02-T2
Area/Structure/Location: Area 9, G-0912
WIR - Required Date of
26/01/2022
Inspection:
WIR - Required Time of
09:00
Inspection(HH:MM):

This mail was prepared by R Nair


THE ROYAL ATLANTIS RESORT AND RESIDENCES
Contract No : CN 0063 FCN No.: TRA-STC-FCN-FI-G00-00239

EMPLOYER : ATLANTIS THE PALM LIMITED 2 Rev. 00

CONTRACTOR : SSYANGYONG_BESIX J.V. DATE: 10/13/2021

FIELD CHANGE NOTICE


Civil Architectural Electrical Mechanical Plumbing

SUBMITTAL No. :

DOCUMENT No. : TRA-STC-SDG-FI-G00-01033/00134/00135

F9 - GROUND FLOOR BOH KITCHEN AREA FINISHING PLANS & ELEVATIONS, ZONE 07, BANQUET
DOCUMENT TITLE :
KITCHEN PART 2, CLEARING STATION G-0745, BEVERATE STORE G-0743

STATUS OF SUBMITTAL : B - APPROVED AS NOTED

F9 - BANQUET KITCHEN - MISSING ELEVATIONS & LIGHT SWITCHES AS PER REF FCN 01186
DESCRIPTION :

SBJV Internal QA/QC Check


Please find attached revised sketches for G00 Banquet Kitchen with below updates: Coordination
N/A
PACKAGE
1. Missing Elevations E14 to E20 provided. TEAM
INVOLVE
INITIAL

2. Light switches updates as epr FCN 01186
3. Relocation of data point from Beverage Store to Beverage Dispenser as per √ MEP

TRA-SPE-SDG-TE-G00-00007-03 √ ARCHITECTURE

4. Relocation of data points at Beverage dispenser on side walls to avoid clashes with STRUCTURAL -
STEEL
kitchen equipment. STRUCTURAL -
CONCRETE

FAÇADE
Revised infor shall be updated in asbuilt.
OTH.(____,____,)

OTH.(____,____,)

Initiated By : Kavita Date : 10/13/2021

Contractor Project Director : Received By DEC :

Signature/ Date : Signature/Date :

For Consultant :

Approved Approved as Noted Not Approved

COMMENTS :

Refer the comments on Pages 2 to 10 of this FCN submittal.


Reviewed for clouded changes only.

Aditi Joshi Sr.Architect 24 Oct'21

Name Position Signature Date

NOTE : This info will be included in the revised shop drawing (where applicable)
TRA-SBJ-QCD-QA-GEN-00004 Rev.02 Date: 08/09/18 18 OCT 2021