SCHEDULING FOR CONDTRUCTIONS

1. Contracts

 Supply Lot Sale Agreement


 Supply Construction Agreement
 Make a Contract Plans
 Specify The Contract
 Make a Contract Site Plan
 Securing The Financial Needs

2. Documents Reviews and Revisions

 Review and Finalize Plans


 Review and Finalize Site Plans
 Print Construction Drawing
 Approved The Revise Plan
 Approve4d The Revise Site Plan

3. Bids and Contract

 Make Copies of Construction Plan


 Distribute The Construction Plan
 Receive Bids
 Review Bids
 Execute Subcontractor Agreement

4. Grading and Building Permits

 Scheduling for Lot Surveying


 File Grading Permits Application
 File Building Permits Application
 Post Lot Identification
 Install Construction Entrance
 Install Sediment Controls
 Grading Permits Issued
 Building Permits Approved
 Pay Permits and Taxes
 Building Permits Issued
5. Site Work

 Clear The Lot


 State Lot for Excavation
 Excavate for Foundations
6. Foundations

Lay-out Footings 1 Day


Dig Footings and Install Reinforcing 1 Week
Footing Inspection 1 Week
Pour Footings 1 Week

7. Location and Survey

Fill Hollow Blocks Cores with Concrete 2-3 Days


Steel Delivery 2-3 Days
Good Lumber Delivery 2-3 Days

8. Rough Carpentry

Set Steel
First Floor Deck Framing 1-2 Days
First Floor Wall Framing 1-2 Days
Second Floor Deck Framing 1-2 Days
Second Floor Wall Framing 1-2 Days
Third Floor Deck Framing 1-2 Days
Third Floor Wall Framing 1-2 Days
Make a Frame Root 1-2 Days
Install Windows and Doors 1 Week

9. Concrete Slabs

Prepare for Making Slabs 1 Week


Slabs Inspection 1 Day
Pouring Mixture Cement for Slab 1-2 Days

10. H.V.A.C

HVAC Lay-out Mixture 2-3 Days


HVAC Rough-In 1 Day
HVAC Set Indoor Units 2 Days
HVAC Temporary Heat 2 Days

11. Plumbing Rough-In


Plumbing Lay-out and Measuring 2 Weeks
Plumbing Rough-In 2 Weeks

12. Electric Rough-In

Set Electric Boxes 3 Weeks


Install Electric Service Panels 3 Weeks
Electric Wall-Through 3 Weeks
Electrical Rough Wire 3 Weeks

13. Floor Finishes

Installing Tiles 1 Month

14. Paint

Paint with the Prime Coat 2-3 Weeks


Prep Trim for Prime Coat 2-3 Weeks
Prime Trim 2-3 Weeks
Finish Coat Trim 2-3 Weeks
Finish Coat Dry Wall 2-3 Weeks

15. Final Building Inspections

Use Occupancy Certificate 2 Months


Walking Through at First 2 Months
Rough and Final Cleaning 2 Months
Final Work Through 2 Months
Move In 2 Months