Project Name- Project A

Contract No -
Date - 2022/09/26

Item No Item Description Unit Qty Rate Amount Remark

m2 200.00
CF-1 -Ceiling Flat Gypsum Board Ceilng Reffer Plan IN500
1 Material List
1.1 Flat Gypsum Board Ceilng Reguler Board m2 70.00 Area/(2.4x1.2)

600 Steel Angle

600
1.2 Steel Angle nos 2,250.00

[Area/(600x600)]x4

PRIMARY SUPPORT
1.3 nos 55.00 Reffer Cutting Schedule
CHANNEL (C-channel)

PRIMARY SUPPORT
nos 55.00 Reffer Cutting Schedule
1.3 CHANNEL (L-Angle)

HAT FURRING
nos 64.00 Reffer Cutting Schedule
1.4 CHANNEL

1.5 CORNER BEAD nor 25.00


1.12
Total A
2 Labour
2.1 Skill
2.2 Unskill
Total B
3 Mechinery
3.1 Grinder
3.2 Power Saw
3.3 Drill Matching
Total C
Total Cost for 64.39m P1 Partition -