Penampang kolom

Bx = 700 mm = 0,7 m
Hy = 1500 mm = 1,5 m
s = 50 mm = 0,05 m
A = 1050000 mm = 1,05 m^2

Input : K3 0,7 x 1,5 m


L kolom 1 m
Tulangan n tul
56 D 25
Long kolom

n Bx 2 13
n-Conv D
n Hy 2 13

Lo Tengah Joint
Sengkang A 13 100 10 100 13 100
Sengkang B 13 100 10 100 13 100
Sengkang C 13 100 10 100 13 100

BJ Besi = 7850 kg/m^3


d.tul long = 25 mm = 0,03 m
d.tul trans Lo = 13 mm = 0,01 m
d.tul trans tengah = 10 mm = 0,01 m
d. tul trans joint = 13 mm = 0,01 m

Berat tulangan D 25 mm = 3,85 kg


Berat tulangan D 13 mm = 1,04 kg
Berat tulangan D 10 mm = 0,62 kg

Hasil perhitungan Berat


Tulangan Total Berat
Longitudinal
56 D 25 = 215,79 kg
Total Berat = 215,79 kg
Sengkang Tumpuan
Tulangan panjang sengkang
SK - A 10 D 13 4,3 m = 44,39 kg
SK - B 10 D 13 1,7 m = 17,92 kg
SK - C 10 D 13 1,7 m = 17,92 kg
Total Berat = 80,23 kg

Sengkang Lapangan
Tulangan panjang sengkang
SK - A 10 D 10 4,2 m = 25,89 kg
SK - B 10 D 10 3,2 m = 19,73 kg
SK - C 10 D 10 1,6 m = 9,86 kg
Total Berat = 55,49 kg

Resume
Volume Beton = 1,050 m^3
Rasio tumpuan = 281,92 kg/m^3
Rasio Lapangan = 258,36 kg/m^3
Rasio total = 270,140 kg/m^3