INSPECTION REPORT

Asset Integrity Management Department


PETRONAS Penapisan (Terengganu) Sdn. Bhd.

To BT3 Maintenance Planner


CC BT3 Leader, Deputy BT3 Leader, AIM Manager, AIM TP, Corrosion Engineer, RBI Engineer
Report No INSP/BT3/KR-2/Area 16 /MAY 2017/002
Category 3 SAP Notification No.
Previous WL -N/A- Date : -N/A-

PART A – To be filled by Inspection


Date of Inspection 18/05/2017 Inspector AZRULISKANDAR BIN ABDULLAH
PMT - Area AREA 16 (PAINTING)
Equipment Tag Equipment Description
Damage Mechanism -N/A-
Target Completion Date -N/A-

ITEM FINDINGS REQUIREMENTS

LOC. 7

LOC. 4

LOC. 2

LOC. 3

LOC. 1

LOC. 6
LOC. 5 LOC. 9

LOC. 8

Page 1 of 6
ITEM FINDINGS REQUIREMENTS

General View Of Inspected Area 16.

Page 2 of 6
ITEM FINDINGS REQUIREMENTS

General view location 1 south side Specification


pump house. • Line no.
10”-WF-206043-1803A-NI

Recommendation.
• To apply maintenance painting
as per PTS 1C.

-Black and yellow spot was


noted at scattered area on the
surface 10” pipe due to chemical
contamination.

General view location 2 near WM Specification


81. • Line no.
8”-WF-206043-1803A-NI

Recommendation.
• To replace with new end cap.
• To remove hard scale and
apply maintenance painting as
per PTS 1C.
-Crevice corrosion was noted
between flange and butterfly
valve.

-End cap was found missing.

General view location 3 south side Specification


• Line no.
tank T 22702. 3”-WF-206828-1801X-NI

Recommendation.
• To apply maintenance painting
as per PTS 1C.

-3” pipe was noted with surface


corrosion on bottom side.

Page 3 of 6
ITEM FINDINGS REQUIREMENTS

General view location 4 north side Specification


tank T 22504. • Line no.
10”-WF-206043-1803A-NI

Recommendation.
• To apply maintenance painting
as per PTS 1C.

-Minor paint peel off was noted


at scattered area on the surface
10” pipe due to paint failure.

General view location 5 north side Specification


Vessel V 28303. • Line no.
3”-WF-206942-1801X-NI

Recommendation.
• Replace with new bolt and nuts
for major corroded items.

-Severe hard scale was noted on


the surface bolting due to
atmospheric corrosion.

General view location 6 near Specification


WM90. • Line no.
10”-WF-206043-1803A-NI

Recommendation.
• To remove paint flaking and
apply maintenance painting as
per PTS 1C.

-Paint was found with minor


flaking due to paint failure on
the bottom surface 10” pipe.

Page 4 of 6
ITEM FINDINGS REQUIREMENTS

General view location 7 north side Specification


tank T 29206. • Line no.
10”-WF-206043-1803A-NI

Recommendation.
• To apply maintenance painting
as per PTS 1C.

-Crevice corrosion was noted


between cover strainer and
flange.

-Crevice corrosion was noted


between flange and flange.

General view location 8 east side Specification


tank T 29205. • Line no.
14”-WF-206720-1803A -NI

Recommendation.
• To apply maintenance painting
as per PTS 1C.

-Rust stain was noted on the


surface strainer due to general
corrosion

General view location 9 Specification


Near A-20602 . • Line no.
8”-WF-206805-1803A-NI

Recommendation.
• To remove paint flaking and
apply maintenance painting as
per PTS 1C.

-Paint was found with minor


flaking due to paint failure on
the bottom surface 8” pipe.

Page 5 of 6
PREPARED BY: REVIEWED BY: APPROVED BY:

18/05/2017 / /2017 / /2017


AZRULISKANDAR BIN IKA FARIKHA SYAZWANNI BT M.IMRAN BIN M. ASHRAF
ABDULLAH ABD RAHMAN AIMD HEAD
Inspector AIM Engineer
Inspection Engineer

PART B – To be filled by Operation &Maintenance


STATUS AND PROGRESS OF INSPECTION REPORT
Operation Remarks

To be carried out ONLINE SHUTDOWN

………………………………………

Production Engineer
Date Start: Date Finish:

………………………………………………….. ……………………………………………………

Maintenance Supervisor BT3 Inspector


Close Out Remarks: Close Out Remarks:

Page 6 of 6