LOC. 7
LOC. 4
LOC. 2
LOC. 3
LOC. 1
LOC. 6
LOC. 5 LOC. 9
LOC. 8
Page 1 of 6
ITEM FINDINGS REQUIREMENTS
Page 2 of 6
ITEM FINDINGS REQUIREMENTS
Recommendation.
• To apply maintenance painting
as per PTS 1C.
Recommendation.
• To replace with new end cap.
• To remove hard scale and
apply maintenance painting as
per PTS 1C.
-Crevice corrosion was noted
between flange and butterfly
valve.
Recommendation.
• To apply maintenance painting
as per PTS 1C.
Page 3 of 6
ITEM FINDINGS REQUIREMENTS
Recommendation.
• To apply maintenance painting
as per PTS 1C.
Recommendation.
• Replace with new bolt and nuts
for major corroded items.
Recommendation.
• To remove paint flaking and
apply maintenance painting as
per PTS 1C.
Page 4 of 6
ITEM FINDINGS REQUIREMENTS
Recommendation.
• To apply maintenance painting
as per PTS 1C.
Recommendation.
• To apply maintenance painting
as per PTS 1C.
Recommendation.
• To remove paint flaking and
apply maintenance painting as
per PTS 1C.
Page 5 of 6
PREPARED BY: REVIEWED BY: APPROVED BY:
………………………………………
Production Engineer
Date Start: Date Finish:
………………………………………………….. ……………………………………………………
Page 6 of 6