This document is a pre-concrete notice submitted by OECC Overseas Engineering and Construction Co. for a pour taking place on February 20th, 2023. It provides details of the project location, mix design, amount of concrete required, objects to be poured, number of cylinders needed, and ID marks for the cylinders. The pre-concrete check supervisor and OECC representative signatures are at the bottom to approve the pour.
This document is a pre-concrete notice submitted by OECC Overseas Engineering and Construction Co. for a pour taking place on February 20th, 2023. It provides details of the project location, mix design, amount of concrete required, objects to be poured, number of cylinders needed, and ID marks for the cylinders. The pre-concrete check supervisor and OECC representative signatures are at the bottom to approve the pour.
This document is a pre-concrete notice submitted by OECC Overseas Engineering and Construction Co. for a pour taking place on February 20th, 2023. It provides details of the project location, mix design, amount of concrete required, objects to be poured, number of cylinders needed, and ID marks for the cylinders. The pre-concrete check supervisor and OECC representative signatures are at the bottom to approve the pour.