OECC OVERSEAS ENGINEERING AND CONSTRUCTION CO. LTD.S.A.

PRE-CONCRETE NOTICE & MASONRY EVALUATION FORMS

PRE-CONCRETE NOTICE Date Submitted: 19-Feb-23

PROJECT: Corozal to Sarteneja Road Upgrading Project


(Pueblo Nuevo Bridge)
REQUISITION NO.
NOTICE NO.: BR-197

LOCATION M&M Yard, Ladyville

DATE OF REQUEST FOR INSPECTION:. 19-Feb-23

PRE-CHECK SUPERVISOR: Juan Marin Jr.

PROPOSED DATE OR POUR: 20-Feb-23 Time: 9:00am

REQUIRED STRENGTH (F´c, fcr): 42 Mpa

AMOUNT REQUIRED: 15.39 M³

DETAILS OF MIX DESIGN:


Mix Ratio Correction Qty Unit
Cement: 0.3681 1.00 100.00 Bags
Water: 0.1950 1.00 1488.00 Lts
Fine Sand: 0.2610 1.00 2.00 M³
Quarry Sand: 0.2610 1.00 2.00 M³
Gravel: 0.6534 1.00 5.00 M³
Additive DX: 0.0000 1.00 0.00 Gal.
Additive Polyheed 789 0.0000 1.00 0.00 Gal.
Additive Glenium: 1.9608 1.00 15.0000 Lts
CONCRETING SPECIFIC

OBJECTS TO POUR: 4 .45m X .45m X 19m Prestressed Concrete Piles


Batch 16
NUMBERS OF CYLINDEFS REQUIRED: 6 per batch

ID MARK FOR CYLINDERS: 63-66

COMMENTS:

OECC REPRESENTATIVE PEU SUPERVISOR