YANBU STRATEGIC TANKS

Subject DATA SHEETS Number


Instrumentation - Level 3006

Doc. - No.: Q A 1 0 - G - 3 0 3 2 Rev. 0

No. Description Unit Required Guaranteed Notes


1 Station
1.1 Name -
1.2 Location of installation -
1.3 Reference Specifications S01, S02, S03

2 Level Switch
2.1 Manufacturer -
2.2 Type S02
2.3 Type of Construction -
2.4 Accuracy % ± 1.00
2.5 Degree of Protection IP S02
2.6 Process connection / Material -
2.7 Case Material -
3 Level Gauge
3.1 Magnetic Type
3.1.1 Manufacturer -
3.1.2 Type S02
3.1.3 Type of Construction -
3.1.4 Accuracy % ± 1.00
3.1.5 Degree of Protection IP S02
3.1.6 Process connection / Material -
3.1.7 Case Material S02
3.2 Hydrostatic Type
3.2.1 Manufacturer -
3.2.2 Type S02
3.2.3 Type of Construction -
3.2.4 Accuracy ± 1.00
3.2.5 Degree of Protection IP S02
3.2.6 Process connection / Material -
3.2.7 Case Material -
4 Level Indicator Transmitter
4.1 Ultrasonic Type
4.1.1 Manufacturer -
4.1.2 Type S02
4.1.3 Type of Construction -
4.1.4 Material -
4.1.5 Accuracy % ± 1.00
4.1.6 Degree of Protection IP S02
4.1.7 Process connection/ Material -
4.1.8 Case Material -
4.2 Radar Type
4.2.1 Manufacturer -
4.2.2 Type S02
4.2.3 Type of Construction -
4.2.4 Material -
4.2.5 Accuracy % ± 1.00

Page 1of 2
YANBU STRATEGIC TANKS
Subject DATA SHEETS Number
Instrumentation - Level 3006

Doc. - No.: Q A 1 0 - G - 3 0 3 2 Rev. 0

No. Description Unit Required Guaranteed Notes


4.2.6 Degree of Protection IP S02
4.2.7 Process connection/ Material -
4.2.8 Case Material -
4.3 Differential Pressure Diaphragm Type Delta Cell
4.3.1 Manufacturer -
4.3.2 Type S02
4.3.3 Type of Construction -
4.3.4 Material -
4.3.5 Accuracy % ± 1.00
4.3.6 Degree of Protection IP S02
4.3.7 Process connection/ Material -
4.3.8 Case Material -