Professional Documents
Culture Documents
BC301 - NCR - Mining Office
BC301 - NCR - Mining Office
Project Name: Mining Office - Kamao- 1 Contract Number: BC301 NCR Number:
Description of NCR (Attach relevant supporting documentation to NCR i.e. Photos, Audit report, QC reports, Daily Diary) ü
Incorrect fitting of conduits into electrical boxes at mine office buildings ü Method
ü Workmanship
Material
Design
Close out target date: ü Responsibility
Proposed Corrective Action: (To be approved by: Engineer / Superintendent / HOC / Construction Manager / QMS Manager)
CORRECTIVE ACTION BELOW:
Improving work processes or Method