HSE Statistics

Frequency / No. of Occurrence Rolling Average Based on 2019-


No. Description
2021 Safety Performance Data
2017 2018 2019 2020 2021
1 No of Lost Time Injury (LTI) 4 1 0 0 0
2 No. of Restricted Workday Case 0 0 0 0 0
3 No. of Medical Treatment Case 0 0 0 0 0
4 No. of First Aid Case 4 2 3 2 2
5 Total Man-hours Worked 545192 543904 559360 685667 740520
6 No of Lost Workdays for LTIs 15 3 0 0 0
LTI Frequency
7 ( No of LTI/ Total Man-hours 7.3 1.8 0 0 0 0
workedX1000000 )
LTI Severity
8 3.75 3 0 0 0
(No of days lost/ No of LTI )
9 No of major Fire Incidents (Jobsite) 0 3 0 0 0 0
10 No. of Vehicle Accidents (Jobsite) 0 0 0 0 0
11 No. of Fatality 0 0 0 0 0
Fatality Accident Rate (FAR) 0 0 0 0 0 0
12 Safety Award 0 0 0 0 0

Wastes, potential for spills/loss of


13 0 0 0 0 0 0
containment etc. (LOPC)

14 Total Recordable Frequency Rate (TRCF) 7.3 1.8 0 0 0 0


Project Overall Statistics

HSE Performance Dashboard Year 2021

740,520
0 0 0 270 2 0 0 0

LTI RWC MTC UA/UC FAC FAR LOPC Fire


Total Safe Manhours
Total Values

Safety Induction Status HSE Safety Trainings


18 5
15 15 4 4
12 3 3 3
11
10
9 2 2 2 2 2
8
7
1
4 4
3

2 22 22 2 2 22 22 2 22 22 2 22 2
22 r- 2
2
l- 2
2
t-2 n- b- -2 r-2 - n- l-2 g- p- t- 2 v- -2
n- ar Ap ay Ju Oc
c
Ja Ap Ju Oc Ja F e M M Ju Au S e No De

Overall NCR Status

Total NCR Closed 8

Total NCE Raised 14

Achievement Important Notes


1 Million Safe 1.
Manhours award, Aug- 2.
2022 3.
Previous Project History
REF NO. CONTRACT TITLE CONTRACT NO. COUNTRY/REGION OWNER CONTRACTOR BUSINESS TYPE SERVICE TYPE EFFECTIVE DATE DURATION
Provision of Engineering, Supply, Installation
Petronas Carigali Iraq Holding
003 and Commissioning of Power Generation for PCIHBV/2017/PG&T/1702 IRAQ Power Petroleum International Co.,Limited. Oilfield Surface Engineering EPCC 10/20/2017 10 Months
B.V. Garraf Operation
Third River Water Intake Facilities

EPC Project of Power Generation and Power


004 Distribution System for S1 Camp of EBS 023-SC-18 IRAQ EBS Petroleum Company Limited Power Petroleum International Co.,Limited. Oilfield Surface Engineering EPC 5/11/2019 4 Months
Oilfield
Provision of Leased Power Unit for 3,4&5 and
Gas Treatment Unit (GTU) Includung Petronas Carigali Iraq Holding
118 PCIHBV/2019/PD&T/2316 IRAQ Power Petroleum International Co.,Limited. EPCC EPCC 1/16/2020 25 Month
Operations and Maintenance (Package 4) for B.V. Garraf Operation
Petronas Carigali Iraq Holding B.V.
Provision of Engineering, Procurement,
PetroChina Company Limited
120 Construction and Commissioning for Power HFY-CON/F&C1048-1071/02 IRAQ Power Petroleum International Co.,Limited. EPCC EPCC 7/23/2020 2 Years
Iraq Branch
Supply to Wellpads (2020-2021)
PROVISION OF SUPPLY, INSTALLATION
AND COMMISSIONING OF DIESEL ENGINE Petronas Carigali Iraq Holding
122 PCIHBV/2020/PD&T/2556 IRAQ Power Petroleum International Co.,Limited. EPCC EPCC 8/10/2020 9 Month
GENERATOR (DEG) FOR PCIHBV GARRAF B.V. Garraf Operation
OPERATION
Provision of Leased Power Unit for 3,4&5 and
Gas Treatment Unit (GTU) Includung Petronas Carigali Iraq Holding
123 PCIHBV/2019/PD&T/2316 IRAQ Power Petroleum International Co.,Limited. EPCC EPCC 1/16/2020 25 Month
Operations and Maintenance (Package 4) for B.V. Garraf Operation
Petronas Carigali Iraq Holding B.V.
PROVISION OF COMPREHENSIVE SITE
SERVICE FOR POWER TRANSMISSION AND PetroChina Company Limited
126 HFY-CON/PD1112-1135 IRAQ Power Petroleum International Co.,Limited. Services Services 8/15/2021 3 Years+1 Years
DISTRIBUTION SYSTEM IN HALFAYA Iraq Branch
OILFIELDS