JOB

NO. 13
C/O LORAN(LOWER) KUNGI NALLAH TO DHUNKHARI GAHAR PICHHLA PHALLAN(DUBKAN
FALLAN) ROAD KM. 0/0 TO 7/0.
C/O Retaining Wall + TOE WALL AT RD 2/419.90­2/431.20 LENGTH=11.30 MTR
Sr. No. Detail Of Measurement No. L B H Qty. in Cumt. RATE AMOUNT
2 Earth Work in Excavation 1 11.75+12.00 1.70+1.80 1.00+3.23 43.95
2 2 2
11.88 1.75 2.12
43.95 230.00 10,109.04
4 P/L CC 1:3:6 TOE WALL A 1 12.00 1.70+1.70 1.00 20.40
2
1.70
HORIZONTAL CC BOND AT TOP OF 1 11.75 1.80 0.1 2.115
TOE WALL B

22.52 5,230.00 117,753.45


5 Stone Masonry in CM 1:6
TOE WALL B 1 11.75+11.30 1.80+1.80 0.85 17.63
2.00 2.00
11.53 1.80
BOTTOM BOND 1 11.75+11.30 1.63+1.56 0.30 5.53
2.00 2
11.53 1.60
Middle Bond 1 11.75+11.30 1.27+1.11 0.60 8.23
2.00 2
11.53 1.19
Top Bond 1 11.75+11.30 0.87+0.75 0.52+0.30 3.83
2.00 2 2
11.53 0.81 0.41
Vertical Bond (Bottom) 5 0.60 1.56+1.27 1.175 4.99
2
1.42
Vertical Bond (Top) 5 0.60 1.11+0.87 1.175 3.49
2
0.99
43.70 4,050.00 176,981.67
8 Dry Stone Masonry
Vertical Bond (Bottom) 1 8.525 1.56+1.27 1.175 14.17
2
1.42
Vertical Bond (Top) 1 8.525 1.11+0.87 1.175 9.92
2
0.99
24.09 2,400.00 57,817.40
10 Back filling behind retaing wall 1 11.75+11.30 0.60 2.50 17.29 1,330.00 22,992.38
2.00
11.53 GRAND TOTAL 385,653.94
This document was created with the Win2PDF “Print to PDF” printer available at
https://www.win2pdf.com
This version of Win2PDF 10 is for evaluation and non-commercial use only.
Visit https://www.win2pdf.com/trial/ for a 30 day trial license.
This page will not be added after purchasing Win2PDF.
https://www.win2pdf.com/purchase/

You might also like