You are on page 1of 2

6/29/2020 Aconex

Bandar AlSulaimani Final (WF-001084) R12-T07B14 - (MAG) - Technical (G… 27/06/2020


THE RED SEA DEVELOPMENT COMPANY WORKFLOW TRANSMITTAL TRS12T07-WTRAN-004195

MAIL TYPE MAIL NUMBER REFERENCE NUMBER


Workflow Transmittal TRS12T07-WTRAN-004195 TRS12T07-WTRAN-004195

Final (WF-001084) R12-T07B14 - (MAG) - Technical (GROUNDING PROTECTION


SYSTEM. GROUNDING PROTECTION SYSTEM ,FURSE -ABB,KHEREIJI
SHOWROOMS Co)_00

From Mr Bandar AlSulaimani - The Red Sea Development Company

To (12) Mr MUHAMMAD SHARIF - Al Majal Al Arabi Holding Company (+11 more...)

Cc (6) Mr Salman El Aissami - Al Majal Al Arabi Holding Company (+5 more...)

Sent Saturday, 27 June 2020 10:21:23 AM AST (GMT +03:00)

Status N/A

DOCUMENT ATTACHMENTS (1)

(0 selected)

File Document No Revision Title Status

R12-T07B14- GROUNDING PROTECTION SYSTEM. GROUNDING Accepted


MAG-MAT-EL- 00 PROTECTION SYSTEM ,FURSE -ABB,KHEREIJI SHOWROOMS with
0006 Co. Comments

ATTRIBUTES

Attribute 1 Site Wide

MESSAGE

Workflow Review History

The attached documents have completed the "R12-T07B14 - (MAG) - Technical (GROUNDING PROTECTION SYSTEM. GROUNDING
PROTECTION SYSTEM ,FURSE -ABB,KHEREIJI SHOWROOMS Co)_00" workflow with the following results :

This transmittal was automatically generated.

https://ksa1.aconex.com/Logon 1/2
6/29/2020 Aconex

Doc No Step Participant Review Comments


Outcome

R12-
TRSDC
T07B14-
Document S
MAG- Accepted
Controller - Peedikayil
MAT-EL-
Receiver
0006

i. No technical objection to the proposed manufacturer ii. Calculations shall


Accepted
Electrical be provided for the General earthing. iii. Calculations for the HV,
S Gomez with
Review Transformer & LV systems iv. The material selected shall be to the approval
Comments
of the calculations

Review
Mechanical
A Nahhas Not
Review
Required

Review
Civil Review Y Navsa Not
Required

Review
Structural
A Das Not
Review
Required

Project Accepted
Manager T Yekeler with
Review Comments

Project
Accepted Any review or acceptance by the employer shall not release the Contractor
Manager / B
with from any of its liabilities, duties, obligations or responsibilities under the
Director AlSulaimani
Comments Contract.
Approval

https://ksa1.aconex.com/Logon 2/2

You might also like