5/26/2021 Aconex

Sanjeev Guness Final (WF-001720) R02I16B01 - Material Submittal for … 10:13 AM


THE RED SEA DEVELOPMENT COMPANY WORKFLOW TRANSMITTAL TRS02I16-WTRAN-004877

MAIL TYPE MAIL NUMBER REFERENCE NUMBER


Workflow Transmittal TRS02I16-WTRAN-004877 TRS02I16-WTRAN-004877

Final (WF-001720) R02I16B01 - Material Submittal for KSC Cable Management


System (By: KSC Khereiji Showrooms CO. LTD.) - rev.01

From Mr Sanjeev Guness - The Red Sea Development Company

To (12) Mr Ringo Deloeste - AECOM

Mr Enrico Purugganan - AECOM

Mr Tamer Issa - AECOM

Mr Moossan Shad - AECOM

Mr Roberto Bayawa - NAPJV

Mr Ammar Ghaith - The Red Sea Development Company

Bassem Rizk - The Red Sea Development Company

Mr Sanjeev Guness - The Red Sea Development Company

Ana Araujo - The Red Sea Development Company

Houssam Cheaib - The Red Sea Development Company

Mr Marcus Luff - The Red Sea Development Company

Mohamed Macci - The Red Sea Development Company

Cc (11) Dr Aysar Odeh - AECOM

Mr Rowell Lizardo - NAPJV

Mr Charbel Sebaaly - NAPJV

Mr Aseel Basakran - NAPJV

Mr Ahmed Basfar - NAPJV

Ms Valerie Castro - The Red Sea Development Company

Mr Khaled Gad - The Red Sea Development Company

Mr Ossama Wahdan - The Red Sea Development Company

Mr Amit Yadav - The Red Sea Development Company

Mr Ali Obaid - The Red Sea Development Company

Mr James Marsden - The Red Sea Development Company

Sent Wednesday, May 26, 2021 10:13:32 AM AST (GMT +03:00)

Status N/A
https://ksa1.aconex.com/Logon?Action=View&ENTITY=MAIL&ID=1349782764&USERID=1342240441 1/4
5/26/2021 Aconex

DOCUMENT ATTACHMENTS (1)

(0 selected)

File Document No Revision Title Status

R02-I16B01-NAP-MAT- KSC Cable Management System (By: KSC Khereiji Accepted with
01
EL-0046 Showrooms CO. LTD.) Comments

ATTRIBUTES

Attribute 1 Airside

MESSAGE

Workflow Review History

The attached documents have completed the "R02I16B01 - Material Submittal for KSC Cable Management System (By: KSC Khereiji
Showrooms CO. LTD.) - rev.01" workflow with the following results :

This transmittal was automatically generated.

Doc No Step Participant Review Outcome Comments

R02-I16B01-NAP-MAT- AECOM Document


R Deloeste Accepted
EL-0046 Controller

AECOM Supervision T Issa Accepted with Comments Material submittal is


accepted with the below
comments: - Provide
loading calculation for the
used cable trays and cable
ladders. - All fixation
hardware: bolts, nuts,
washers, couplers, bends,
tees, risers, elbows, plates,
supports and fittings shall
be compatible with the
used cable tray / ladder
and to be delivered from
the same
manufacturer/supplier. -
The cable tray / ladder
shall be sized to suit the
proposed cabling
requirements with min of
30% spare capacity for
tray and 25 % for ladder. -
Sizes and compartments
shall be as per indicated in
the shop drawings and

https://ksa1.aconex.com/Logon?Action=View&ENTITY=MAIL&ID=1349782764&USERID=1342240441 2/4
5/26/2021 Aconex

loading study, considering


the future spare capacity -
Function and location of
use shall be as per
described in the
specification and shown on
shop drawings. - Site
manufactured and/or
fabrication of trays,
ladders, trunks and fittings
will not be allowed. - After
completion of installation,
the color coding to be
applied as per indicated in
the shop drawings and
specs. - Follow
specification procedure
and manufacturer
instructions in installation
stage. - The cable
Tray/Ladder system shall
be complete with all
necessary fittings required
for the installation to fulfil
the required routes and
sizes including the
grounding and supports. -
Provide warranty letter for
the delivered/fabricated
material stamped from
chamber of commerce. -
Provide test reports and
certificates for the
delivered/fabricated
materials. - Provide Shop
drawings along with
sections and details. -
Provide pieces of samples
for the tray, ladder, and
components. - Submit
WMS, ITP, Checklist and
MIR. - Conduct all required
tests in witnessing of
AECOM, giving advance
notice of dates and times
for tests.

TRSDC Sr. Project The contractor to Address


H Cheaib Accepted with Comments
Manager AECOM comments

TRSDC Sr Airport
B Rizk Accepted with Comments refer to aecom comments
Manager

https://ksa1.aconex.com/Logon?Action=View&ENTITY=MAIL&ID=1349782764&USERID=1342240441 3/4
5/26/2021 Aconex

TRSDC Environmental A Araujo Review Not Required

TRSDC AD Airport
M Macci Accepted with Comments Refer to Aecom comments
Engineering

Refer to AECOM
TRSDC Airport Director S Guness Accepted with Comments
comments

https://ksa1.aconex.com/Logon?Action=View&ENTITY=MAIL&ID=1349782764&USERID=1342240441 4/4