Professional Documents
Culture Documents
dar
ProJect no. & Title: Sl9O9l.DESIGN AND EXECUTION OF KING SALMAN AIR BASE
Date: 29-Aug-20
Materlal Submitlâl No.: S'19091-DlB-NASJV-PK1-MAT-E-0016.00
4
í,,i,, \
u'it
è-t-s @ dar l j (
Þ
2. Manufacturer / supplier
Company Name : Khereiji Showrooms
Address : Saudi Arabia
Locålâgênt : Khereiji Showrooms
3. Dellvery :
certify that the above subm¡tted items havê been rev¡ewed ¡n detâil and are correct arìd in str¡cl conform¡ty with th€ contr¿ct specif¡calions except as oth€M¡s€
âlso lhat the malerial sources indicaled âbove have been rcv¡evred ¡n detailand lhât they will suppv the submitted ¡tems wilh the above and (þl¡ver same timely.
of tinned copper, Fire stopping materials & ¡nstallation requirements through fire & smoke barriers tr Revise arìd resubm¡t
through penetration fire stop systems. D Reiected
F¡nal s¡zes of the cable tray/ladders shall be subject to the approved shop drawings.
Bolts, screws and nuts shall be e¡ther Cadmíum plated or electrolytic ally galvanízed material.
t Sâmpl€ required
Don't use metal trays I ladders as earth continuity conductor. tr lests required
Copper straps to nearest bare earthing conductor and at maximum 30-m spacing. Cross-section. tr Addilional information required
D Re¡ected
Name :
S¡gnature; Oate: