Material Submittal

dar
ProJect no. & Title: Sl9O9l.DESIGN AND EXECUTION OF KING SALMAN AIR BASE
Date: 29-Aug-20
Materlal Submitlâl No.: S'19091-DlB-NASJV-PK1-MAT-E-0016.00

FACILITIES IN DYRAB (CENTRAL SECTOR)


Supewision Contractor:
Client:

4
í,,i,, \
u'it
è-t-s @ dar l j (
Þ

1. Material descr¡pt¡on (one item only on this form)

frey, and ladder with fìtling and ell suppol¡ng system

Area of appl¡cátion : All Building


Drâwirp ref. : LO.O. ltem. no.:
Spec¡lìcetion Ref. . 16100&161 10 Srandards:
Atlâch all relevant technicâl literature marked to ¡dentify reþvant descnption, curent Test Cerlificates, sampbs âs åppropriats.

2. Manufacturer / supplier
Company Name : Khereiji Showrooms
Address : Saudi Arabia
Locålâgênt : Khereiji Showrooms

3. Dellvery :

Country of origin Saudi Arabia


Ava¡labl¡ty
O-ocally Manuidctued OOwæ¿s

Del¡very Ex-workv total durat¡on l f l


Estimated t¡me of anival on s¡te 1

Program Oate material requ¡red on site I


Letest dete for order I

certify that the above subm¡tted items havê been rev¡ewed ¡n detâil and are correct arìd in str¡cl conform¡ty with th€ contr¿ct specif¡calions except as oth€M¡s€
âlso lhat the malerial sources indicaled âbove have been rcv¡evred ¡n detailand lhât they will suppv the submitted ¡tems wilh the above and (þl¡ver same timely.

Submitted by NASJV - Engine€r Signature

4. Construction Supervlsor's Representativo comments: H" n Approved


Support structure calculation with se¡sm¡c support shall be submitted with safety factor
Contractor should subm¡t semple for Zinc r¡ch paint, expansion jo¡nts , Earth continu¡ty strap mede t Approved as noted

of tinned copper, Fire stopping materials & ¡nstallation requirements through fire & smoke barriers tr Revise arìd resubm¡t
through penetration fire stop systems. D Reiected
F¡nal s¡zes of the cable tray/ladders shall be subject to the approved shop drawings.
Bolts, screws and nuts shall be e¡ther Cadmíum plated or electrolytic ally galvanízed material.
t Sâmpl€ required

Don't use metal trays I ladders as earth continuity conductor. tr lests required

Copper straps to nearest bare earthing conductor and at maximum 30-m spacing. Cross-section. tr Addilional information required

D Manufaclure/s ouarântee reouired


Name:
Signature:
úaA r+rraç:s¡-uf- zæ.
b+-'
5. Employer's representatlve commenls Approved
E
D Approved as noled

D Revise and r€submit

D Re¡ected
Name :

S¡gnature; Oate: