Professional Documents
Culture Documents
FR-PRM-009-00, Laporan Bulanan Hasil Produksi Melting
FR-PRM-009-00, Laporan Bulanan Hasil Produksi Melting
Consume Produce
01-04-2022 Shift 1 Furnace 10 T (BILLET) Fatmala Adm MO/MLT/BLT/220050 [W10580BRU]BILLET 3.5 MF (BIRU) 10,546.50 9,736.70
01-04-2022 Shift 1 Furnace 15 T (BILLET) Fatmala Adm MO/MLT/BLT/220050 [W20580HJU]BILLET 5 CA (HIJAU) 10,253.00 9,439.44
01-04-2022 Shift 2 Furnace 10 T (BILLET) Andri MO/MLT/BLT/220050 [W10580HJU]BILLET 3.5 CA (HIJAU) 10,488.00 9,729.99
01-04-2022 Shift 2 Furnace 15 T (BILLET) Andri MO/MLT/BLT/220050 [W10580BRU]BILLET 3.5 MF (BIRU) 9,970.00 9,422.78
01-04-2022 Shift 3 Furnace 10 T (BILLET) Darma Adm MO/MLT/BLT/220050 [W10580HJU]BILLET 3.5 CA (HIJAU) 10,657.50 9,444.60
01-04-2022 Shift 3 Furnace 15 T (BILLET) Darma Adm MO/MLT/BLT/220050 [W10580HJU]BILLET 3.5 CA (HIJAU) 10,685.50 9,701.45
Printed date Thu, 21 Apr 2022 18:05:43 +0700 User : Mush'ab Abdillah Page 1 of 2
Plant Manager/Direktur, Kabag
( ) ( )