Work Order for 6 Gas lifting – line exposed at two locations

Repair method:
1st location: line exposed at new canal- (near CPF1- north east side)
 Installing/ welding of 3-meter 10” casing pipe to protect the line at the canal area
 Casing pipe material: ASTM A106 Gr. B SCH 20.
 3 No’s of pipe spacer to be installed between 6” pipe and 10” casing pipe.
Reference Photos:

Section of pipe exposed


Repair method:
2nd location: line exposed at old canal- near pad 11
 Installing/ welding of 5-meter 10” casing pipe to protect the line at the canal area
 Casing pipe material: ASTM A106 Gr. B SCH 20.
 3 No’s of pipe spacer to be installed between 6” pipe and 10” casing pipe.
Reference Photos:

Section of pipe exposed

1|Page